Funders: EPSRC Grant: EP/FP202511/1 www.floodrisk.org.uk ENGAGING STAKEHOLDERS WITH UNCERTAINTY ENGAGING STAKEHOLDERS WITH UNCERTAINTY Hazel Faulkner &

Slides:



Advertisements
Similar presentations
The BECOTEPS White Paper BECOTEPs Science Writer Mary Brennan Senior Lecturer in Food Marketing School of Agriculture, Food and Rural Development, University.
Advertisements

Risk Assessment and Prioritisation for Invasive Species John Kelly.
WORKSHOP OVERVIEW 1. MAJOR TROPICAL LAND MANAGEMENT PROBLEMS RELATED TO HYDROLOGICAL PROCESSES 2 (i). BEST METHODS (POLICY, TOOLS AND TECHNIQUES) TO ENHANCE.
© UKCIP 2011 Learning and Informing Practice: The role of knowledge exchange Roger B Street Technical Director Friday, 25 th November 2011 Crew Project.
Joint Defra/EA FCERM R&D Programme: Strategy and Policy Development Theme overview.
Societal Impacts of Weather and Climate at NCAR July 27, 2005 Susi Moser, ISSE Jeff Lazo, RAL, ISSE Presentation to the NCAR Executive Committee and Strategic.
EPSRC Grant: EP/FP202511/1 Session 2 - Improving the management of flood infrastructure Chair Paul Sayers, Leader Infrastructure Management.
Recap Day 2. Key messages Day 1 Why CPEIRs? How they were done in different countries? Findings and recommendations Day 2 Questions and themes emerging.
Foresight Flood and Coastal Defence Project Government Office for Science Department for Innovation, Universities and Skills Overview by: Colin Thorne.
Review of FSA Response to Incident of Contamination of Beef Products with horse and pork meat and DNA Professor Pat Troop 16/05/2015Pat Troop.
Workshop on Nonstationarity, Hydrologic Frequency Analysis, and Water Management Julie Kiang, U.S. Geological Survey Rolf Olsen, U.S. Army Corps of Engineers.
EPSRC Grant: EP/FP202511/1 Visualising Uncertain Flood Inundation Maps David Leedal 1, Jeff Neal 2, Keith Beven 1,3 and Paul Bates.
Visualising and Communicating Uncertain Flood Inundation Maps David Leedal 1, Jeff Neal 2, Keith Beven 1,3 and Paul Bates 2. (1)Lancaster Environment Centre,
Natural Hazards. Integrated Risk Assessment & Scientific Advice Uncertainty in forecasting and risk assessment Hydro-meteorologicalVolcanoesEarthquakes.
© Crown copyright Met Office Enhanced rainfall services Paul Davies.
EPSRC Grant: EP/FP202511/1 Probabilistic Forecasting for Local Flooding David Leedal, Paul Smith, Keith Beven and Peter Young Lancaster.
Launch Meeting 26 October 2005 Loughborough University.
Living With Environmental Change Mary Barkham LWEC Deputy Director Understanding Society Workshop 27January 2011.
Risk and Resilience: A Canadian Perspective on Climate Change Adaptation Donald S. Lemmen, PhD Climate Change Impacts and Adaptation Directorate Natural.
EPSRC Grant: EP/FP202511/1 International workshop to discuss the science of asset management 9 th December 2011, Brunei Gallery, School.
Flood monitoring for ungauged rivers - Across the globe Beatriz Revilla Romero 1, Jutta Thielen 1, Peter Salamon 1 and Tom de Groeve 1, Damien Raynaud.
Local flood forecasting for local flood risk areas Keith Beven, David Leedal, Peter Young and Paul Smith Lancaster Environment Centre.
Engineering & Physical Sciences Research Council.
Modeling Framework Generally modeling framework is made up of the following components: A set of biophysical modules that simulate biological and physical.
THEME[ENV ]: Inter-operable integration of shared Earth Observation in the Global Context Duration: Sept. 1, 2011 – Aug. 31, 2014 Total EC.
“Probability forecast use” study Edwin Welles and Jan Verkade February 2012.
Climate change and Environmental Degradation Risk and Adaptation assessment Step 2 Collect scientific information.
EPSRC Grant: EP/FP202511/1 From offshore wave to coastal erosion and overtopping Nicolas Chini 1, Lucy Bricheno 2, Chris Wilson 2,
Major Non-Consensus Program and its review process design Wang Yue; Li xiaoxuan Institute of Policy and Management, Chinese Academy of Sciences Zheng yonghe.
THEME[ENV ]: Inter-operable integration of shared Earth Observation in the Global Context Duration: Sept. 1, 2011 – Aug. 31, 2014 Total EC.
1 Flood Hazard Analysis Session 1 Dr. Heiko Apel Risk Analysis Flood Hazard Assessment.
WP1.2: Inundation modelling to support uncertainty analysis Jeff Neal 1, Ignacio Villanueva 2, Nigel Wright 3, Thomas Willis 3, Timothy Fewtrell 4, Paul.
DRR workshop WMO Commission for Hydrology Geneva June 2013 Ann Calver 1.
Scientific, technological and organisational obstacles facing hydrology Dr Kate Heal School of GeoSciences University of Edinburgh
Introduction to assessment performance Mikko Pohjola, THL.
SOUTH EAST PLAN South East Plan ESPACE - reminder Aim Incorporation of adaptation to climate change within spatial planning mechanisms at local, regional,
NWS Social Science Activities David Caldwell, Director NWS Office of Climate, Weather and Water & Jennifer M. Sprague NWS Social Science Focal Point OFCM.
EPSRC Grant: EP/FP202511/1 Improved Methods for Predicting Trash Loading at Culverts with Trash Screens Nick Wallerstein & Scott Arthur.
Social Science Integration. Hurricane Forecasts as an Element of Generalized Risk Management System Public Emergency Planners Forecast Products Public.
Projected Changes in Nile Flows: RCM Results Mid-Term Workshop Climate Change Risk Management Programme Forecasting & IWRM Component Prepared by: Nile.
Providing more useful (uncertain) scientific information for decision-making: End-to-end-to-end research Rebecca E. Morss (NCAR), Olga Wilhelmi, Mary Downton,
© Crown copyright Met Office PWS in support of disaster prevention and mitigation How to improve collaboration and coordination Sarah Davies UK Met Office.
The Tyndall Centre comprises nine UK research institutions. It is funded by three Research Councils - NERC, EPSRC and ESRC - and also receives some support.
Funders: EPSRC Grant: EP/FP202511/1 Communicating flood risk science at the academic- practitioner interface Meghan Alexander * Hazel.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Moving toward Decision-Making as a Central Focus Other Core Collaborators: Lisa Dilling Linda Mearns Susi Moser (ESIG)
EPSRC Grant: EP/FP202511/1 WP4.4 A Rapid Embankment Breach Assessment (AREBA) Myron van Damme Sept 2011.
SNIFFER’S ROLE IN FLOOD RISK MANAGEMENT Fiona Mactaggart Research Manager.
Climate Change – Defra’s Strategy & Priorities Dr Steven Hill Department for Environment Food and Rural Affairs 22 nd May 2007 FLOODING DESTRUCTION AT.
Horizon Scanning: future skills and competences of the health workforce in Europe MATT EDWARDS and JOHN FELLOWS WP6, EU JA on Health Workforce Planning.
The science-policy interface at MNP INTARESE training on uncertainty & quality, 16/17 October 2007 Arthur Petersen.
Meteorological & Hydrological data for water resources development.
Understanding environmental knowledge controversies: the case of flood risk management Sarah J. Whatmore Oxford University Centre for the Environment Project.
Royal Irish Academy Briefing Bert Rima 109/01/2016.
4th IPWG Workshop Chinese Meteorological Agency, Beijing, China, October, 2008 MAINSTREAMING THE OPERATIONAL USE OF SATELLITE PRECIPITATION DATA.
Speaking the Same Language Gina Eosco, Chris Vaccaro, Julie Demuth 2008 Summer WAS*IS, August 8, 2008.
Workshop on Seasonal Forecast Improvements Kevin Werner, NOAA December 15, 2015 Las Vegas, NV.
EPSRC Grant: EP/FP202511/1 Good Practice Guidelines for Flood Risk Mapping Keith Beven, Lancaster University With Dave Leedal (Lancaster),
Focus areas of the NWS Missouri/Souris River Floods of May-August 2011 Service Assessment – Per the NOAA and NWS Strategic Plans, gather stakeholder input.
Overview of CBRFC Flood Operations Arizona WFOs – May 19, 2011 Kevin Werner, SCH.
Defining climate modelling user needs What is actually required to support impact analysis and adaptation policy development? Rob Swart (Alterra, Netherlands)
Communicating uncertainty in seasonal climate forecasts to stakeholders Andrea L. Taylor 1,2 Suraje Dessai 2 Wändi Bruine de Bruin 2,3 1 Sustainability.
CARPE DIEM 2 nd meeting Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches for Environmental.
Alan F. Hamlet Dennis P. Lettenmaier Center for Science in the Earth System Climate Impacts Group and Department of Civil and Environmental Engineering.
Middlesex University HEC
Topic Area 3. Water Management and Planning
Strategic Environmental Assessment (SEA)
the performance of weather forecasts
Multi-hazard Impact-based Forecast and Warning Services Ken Mylne on behalf of Paul Davies (Met Office, United Kingdom)
Basic principles Overview on proposals Clustering proposals
Presentation transcript:

Funders: EPSRC Grant: EP/FP202511/1 ENGAGING STAKEHOLDERS WITH UNCERTAINTY ENGAGING STAKEHOLDERS WITH UNCERTAINTY Hazel Faulkner & Simon McCarthy ?

Funders: EPSRC Grant: EP/FP202511/1 FHRC research for FRMRC1/2 INTERVIEWS with Environment Agency professionals Environment Agency professionals Insurers Insurers Floodplain planners Floodplain planners  How can FRM optimise risk and uncertainty communications at the professional interface?  Why the reluctance to use uncertainty tools....barriers?

Funders: EPSRC Grant: EP/FP202511/1 BARRIERS TO EFFECTIVE COMMUNICATION OF UNCERTAINTY BARRIERS?

Funders: EPSRC Grant: EP/FP202511/1 Stakeholders in information pathways As webs of influence vary, agendas vary, information needs vary, risk communication strategies & appropriate tools will be totally different MANY SCIENTIFIC,PROFESSIONAL AND LAY STAKEHOLDERS stakeholders at sources of information ‘science’ professionals Information receptors, category I floodplain stakeholders Information receptors, Category II stakeholders outside floodplain BARRIERS?

Funders: EPSRC Grant: EP/FP202511/1  The implication of this is that scientific uncertainty is an relatively unwelcome part of the risk message they are charged with translating for the public PROFESSIONALS experience BINARY DECISION UNCERTAINTY (Decision rule uncertainty) BARRIERS? SCIENTIFIC UNCERTAINTY Uncertainty in the science of flood forecasting and runoff prediction models are largely associated with their assumptions, structure, and boundary conditions, and confidence in validation procedures given uncertainties about climatic and societal futures SCIENTIFIC AND DECISION MAKERS DIFFER IN THEIR UNDERSTANDING OF THE SOURCES OF UNCERTAINTY

Funders: EPSRC Grant: EP/FP202511/1 THE LANGUAGE OF SCIENCE IS OPAQUE TO THE NON-SCIENTIFIC PROFESSIONAL BARRIERS?  If originally formulated in Bayesian terms, the language may be too opaque for translation to be effective – do professionals have sufficient statistical familiarity? Bayesian statistics ? Bayesian statistics ? Prior probability distributions? Prior probability distributions? fuzzy set methods ? fuzzy set methods ? info-gap methods ? info-gap methods ? NUSAP? NUSAP? match tool to communication interface match tool to communication interface  The implication of this is that the language used to communicate the uncertainty must match the needs and agenda of the agencies involved in the communication being undertaken

Funders: EPSRC Grant: EP/FP202511/1 Stakeholders in information pathways Bayesian uncertainty tools – GLUE stakeholder consultation ’traffic lights’ webpages/leaflets Rt = H x V 1;100/1;1000 fuzzy edged Phone warnings Newspaper/TV /twitter LANGUAGE AND TOOLS TO DESCRIBE UNCERTAINTY VARY stakeholders at sources of information ‘science’ professionals Information receptors, category I floodplain stakeholders Information receptors, Category II stakeholders outside floodplain THE WAY FORWARD: TRANSLATIONAL DISCOURSES?

Funders: EPSRC Grant: EP/FP202511/1 Our research (Faulkner et al 2007;McCarthy et al. 2009), both the interviews undertaken with professionals and from the ‘experiment’ undertaken at the co-location workshop in Exeter, found that :  The power of VISUALISATIONS AND ANIMATIONS in realising the uncertainty estimates was potentially great;  The professionals questioned initially struggled to comprehend scientifically defined flood forecast uncertainties (probabilistic and/or ensemble forecasts) without FURTHER TRANSLATION OF THE SCIENCE. When this was available as perhaps a ‘translational discourse’, the preparedness to embrace a more sophisticated expression of the model’s uncertainties was welcomed.  Better DECISION-SUPPORT TOOLS are needed. FINDINGS FINDINGS

Funders: EPSRC Grant: EP/FP202511/1 Decision Tree and Wiki Pages at uk/methods/ uk/methods/ The WIKI Decision-support tool

Funders: EPSRC Grant: EP/FP202511/1 The position of the translational discourse straddling domain  Alternative extended communication structures will be needed (a shared domain)  New interdisciplinary languages and professional challenges may need to exist;  A shared ‘‘virtual institution’’ (alternatively, the arena may be envisaged as having physical construct);

Funders: EPSRC Grant: EP/FP202511/1 IMPROVED VISUALISATION OF UNCERTAINTY THE WAY FORWARD: V ISUALISATIONS

Funders: EPSRC Grant: EP/FP202511/1 ‘end-user’ tailored From this... To this.... THE WAY FORWARD: V ISUALISATIONS

Funders: EPSRC Grant: EP/FP202511/1  Although uncertainty modelling is still not routine,1 and 2D inundation simulations with uncertainty layers ‘underneath’ are a possibility visually clear visually clear  Ensemble rainfall forecasts ( e.g. European Centre for medium range Weather Forecasts) THE WAY FORWARD: V ISUALISATIONS interrogatable

Funders: EPSRC Grant: EP/FP202511/1 SHAPING A ‘TRANSLATIONAL DISCOURSE’ A ‘TRANSLATIONAL DISCOURSE’

Funders: EPSRC Grant: EP/FP202511/1 A GUIDANCE MANUAL how to involve all stakeholders, especially professionals at local level is needed – professional input here important; MORE DECISION SUPPORT TOOLS NEEDED BRAINSTORMING Brainstorming sessions involving professionals/scientists and practitioners A ‘TRANSLATIONAL DISCOURSE’

Funders: EPSRC Grant: EP/FP202511/1 references : flooding & uncertainty Faulkner, Parker, D., Green, C., and Beven, K Developing a Translational Discourse to Communicate Uncertainty in Flood Risk between Science and the Practitioner. Ambio 36(7), , December 2007 Lane SN, Landström C, Whatmore SJ: 2011 Imagining flood futures: risk assessment and management in practice. Philos Transact A Math Phys Eng Sci; 13;369(1942): Romanowicz, R and Beven, K J, 1998, Dynamic real-time prediction of flood inundation probabilities, Hydrol. Sci. J., 43(2), Pappenberger, F., Beven, K.J., Hunter N., Gouweleeuw, B., Bates, P., de Roo, A., Thielen, J., 2005, Cascading model uncertainty from medium range weather forecasts (10 days) through a rainfall-runoff model to flood inundation predictions within the European Flood Forecasting System (EFFS). Hydrology and Earth System Science, 9(4), Note: Klir has taken forward the debate. In the UK scientific community these ideas are referred to in papers by Hall Pappenburger et al, and Pappenburger and Beven. At the Department for Environment, Food, and Rural Affairs (Defra and EA ) several reports are available.

Funders: EPSRC Grant: EP/FP202511/1 Acknowledgement The research reported in this presentation was conducted as part of the Flood Risk Management Research Consortium with support from the: – Engineering and Physical Sciences Research Council – Department of Environment, Food and Rural Affairs/Environment Agency Joint Research Programme – United Kingdom Water Industry Research – Office of Public Works Dublin – Northern Ireland Rivers Agency Data were provided by the EA and the Ordnance Survey.

Funders: EPSRC Grant: EP/FP202511/1 The’ translational discourse’ is a mechanism for the development of tools to match needs. COUCHED in : Mutually exchanged and agreed languages and professional context; EMBRACES: A decision about the modelling strategy to be adopted for a particular type of application, any decision about which uncertainties should be modelled should also be made by joint exchanges within the translational discourse. A ‘TRANSLATIONAL DISCOURSE’

Funders: EPSRC Grant: EP/FP202511/1  In the Netherlands, a broader understanding of the errors and biases that permeate human perception of risk information has emerged, and new ‘‘postnormal’’ communication tools have been debated (de Sluijs, et al), and these may be of value in assessing model uncertainty  Wiki pages, decision-support trees developed by FRMRC2 group at Lancaster  Good Practice guide has been developed.

Funders: EPSRC Grant: EP/FP202511/1  Challenge of USING MODELS IN SERIES When models are linked in series, uncertainties become cascaded in ways that can be only be partially constrained. The actual uncertainty may considerably exceed the reported uncertainty BARRIERS TO EFFECTIVE COMMUNICATION OF RISK AND UNCERTAiNTY cont.. BARRIERS TO EFFECTIVE COMMUNICATION OF RISK AND UNCERTAINTY at THE PROFESSIONAL INTERFACE cont..