MuTr/MuTrig Performance of Run13 RIKEN/RBRC Itaru Nakagawa 1.

Slides:



Advertisements
Similar presentations
Post Run13 MuTR/MuTrig Maintenance 1. Cathode Cable in mis-contact : South Station-1 Oct-5, Gap-2 2.
Advertisements

Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
Commissioning the PHENIX RPC Forward Trigger Upgrade Michael Daugherity Abilene Christian University for the PHENIX Collaboration.
MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April GeV pp (2+3 weeks) GeV pp (1+6 weeks)?
ADTX Threshold Scan RIKEN/RBRC Itaru Nakagawa 1. Run13 ADTX Threshold Scan March 3, 2013 MUID1D HV=Run12 Nominal Setting MuTrig e-Log entry=#
MuTr Recapacitation RIKEN/RBRC Itaru Nakagawa 中川格 1.
South Arm FEE Performance Prior to Au run, all FEMs installed and working. Currently, 157 of 168 FEMs read out useful data. = 93.5% operational FEM losses:
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
Optical Alignment System (OASys) Masters Thesis of Yuki Ikeda Rikkyo University Presented by Itaru Nakagawa RIKEN/RBRC 1.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC.
MuTr HV Optimization RIKEN/RBRC Itaru Nakagawa 1.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Andrew Glenn 4/21/02 Commissioning and Performance of the. Muon Identifier Andrew Glenn (University of Tennessee), for the PHENIX collaboration April APS.
Run11 MuTrig-FEE Summary RIKEN/RBRC Itaru Nakagawa 1.
Performance of PHENIX High Momentum Muon Trigger 1.
South SG1 Trigger High Rate Sanghwa Park, Katsuro Nakamura, Yoshimitsu Imazu, and Itaru Nakagawa 1.
South SG1 Trigger High Rate Sanghwa Park, Katsuro Nakamura, Yoshimitsu Imazu, and Itaru Nakagawa 1.
MuTR/MuTrig Readiness for Run13 Itaru Nakagawa on Behalf of MuTrig/MuTr Group 1.
1 MuTRG-FEE Upgrade Status RIKEN/RBRC Itaru Nakagawa.
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
Run13 MUID Hit Efficiency RIKEN/RBRC Itaru Nakagawa 1.
FVTX Trigger Toru Nagashima, Yomei Fukushima (Rikkyo University) Shoichi Hasegwa (J-Parc) Itaru Nakagawa RIKEN and FVTX Group 1.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
PHENIX Run8 Summary d+Au was fantastic! - x30 over Run3 baseline for future A+A new level of precision on intrinsic Cold Nuclear Matter physics now p+p.
1 South Arm Installation Plan Itaru Nakagawa RIKEN/RBRC.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
1 EMC Trigger Summery from RunII and discussion for RunIII H.Torii, Kyoto Univ. ERT Lvl-1 meeting.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
Performance of the PHENIX Muon Identifier Introduction Calibration with cosmic rays Performance in Au+Au collisions Summary Hiroki Sato, Kyoto University.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
Performance of PHENIX High Momentum Muon Trigger.
High Multiplicity Trigger Operation Status RIKEN/RBRC Itaru Nakagawa On behalf of Toru Nagashima, Aaron Key, SeYoung Han, Shoichi Hasegawa 1.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
1/27/2016 R.Seidl: status of simulation1 W muon analysis in PHENIX Status of the background understanding, signal, smearing and asymmetries R.Seidl (RBRC)
R&D for Muon Trigger Upgrade Naohito Saito (Kyoto/RIKEN/RBRC)
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
Technical Support /5/08 PHENIX WEEKLY PLANNING 12/5/2008 Don Lynch.
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
Recap Clamp for MuTr Station-3 Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration Especially credit to: Tsutomu Mibe (KEK) Yoshinori Fukao.
Performance of PHENIX High Momentum Muon Trigger.
HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009.
MuTRG Channel map summary June 30, 2008 Tsutomu Mibe KEK 1.
MuID Efficiency Study RIKEN/RBRC Itaru Nakagawa This analysis has been done by Sarah Caussin (ENSICAEN) 1.
Recap Clamp Installation RIKEN/RBRC Itaru Nakagawa 1.
MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1.
Run11 MuTrig Performance RIKEN/RBRC Itaru Nakagawa 1.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Onsite Report Itaru Nakagawa RIKEN/RBRC. Schedule.
Possible Improvement of MUID Performance Itaru Nakagawa, Seyoung Han (RIKEN, Ewha/RIKEN)
MuTrg/Mutr Optimization Yoshi-mitsu Imazu. ● Mutr Lv1 timing scan Adjustment of Lv1 timing Online/Offline shape cut values ● Mutrg threshold scan → Better.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
PHENIX Plan for Run13 Kieran Boyle RSC 01/11/20131.
RPCs for the W measurement in PHENIX Chong Kim Korea University Japan-Korea PHENIX collaboration workshop, Nov. 27, 2012 for the PHENIX collaboration.
RPC production and performance Chong Kim Korea university RHIC spin workshop, Seoul National Univ.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA. Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for.
Preparation for Run10 RIKEN/RBRC Itaru Nakagawa. TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364.
FVTX High Multiplicity Trigger for Run15
RIKEN/RBRC Itaru Nakagawa
Update on Noise Analysis of the DHCal Test Beam at Fermilab
Noise analysis of the 1m3 DHCal test beam
Radiation Laboratory Meeting
Maki KUROSAWA VTX Group 2014 Feb 20
Seyoung Han / Ewha Woman’s Univeristy
Presentation transcript:

MuTr/MuTrig Performance of Run13 RIKEN/RBRC Itaru Nakagawa 1

2

3

W TRIGGER REJECTION POWER 4

W trigger status 5 Compare above trigger rates in three different periods.

6

Rejection Power Summary W triggers were formed by 5 different trigger mixes with the combination of SG1, RPC1&3, MUID1D Rejection Power was sufficient to be <2kHz for the total of 5 triggers. Compared to Run12, rejection power is stronger due to MUID1D in the trigger mix. SG1 and RPC were operated loose condition. 7

STABILITY CHECK 8

ADTX/MRG Error History Courtesy to Sanghwa’s Stability Monitor Occasional error, but not continuous. Most of errors are cured right after they first appear. MRG channel number which detected Error 0 is no error South North 9

Overall stable. Shallow slop may come from luminosity increase. North South St-1 St-2 St-3 10 Fake Hit Rates History Hot! (threshold failure) Low efficiency MuTr HV problem, etc

Fake Hit Rates vs. BBC Rate 11 Fake Hit Rates are sampled from abort gap, however it is not free from beam effect presumably due to long time constant of MuTr signal. So Fake rates are linearly proportional to BBC rate. Thus data/(linear fit) should distribute around 1. North Station-2 Octant Average Hit Rates Oct-1Oct-2Oct-3Oct-4 Oct-5Oct-6Oct-7Oct-8 Hot! Too low efficiency?

Data / Linear Fit Distribution 12 90%. North Station-2

Fake Hit Rates vs. BBC Rate 13 Octant-1 and Octant-8 shows double band. North Station-1 Octant Average Hit Rates Oct-1Oct-2Oct-3Oct-4 Oct-5Oct-6Oct-7Oct-8

Fake Rates Close Look 14 May 18, 2:00 ~ May 19, 19:00 ~ ~ Jun. 3, 10:00 The fake rates of oct-1, 8 jumped by about double. Timing is a part by 1.5days. The fake rates of both octants came back to as they used to be at the same time. North Station1 Fake Rates Before oct-8 jump after oct-8 jump after oct-1 jump

South Fake Rates Close Look (May 4, 3:30) ~ (May 28, 4:50) Station-1Station-2 Sudden rate change is most likely to be caused by hot strip appears and disappears after a while. So the trigger should be OK.

SG1-LL1 Efficiencies ADTX MuTr MRG LL1 DCMIF DCM GL1 Trigger Identical hit information Identical hit information Josh Perry’s Online Monitor LL1 boards developed by U.Iowa

LL1 Efficiency (South) Overall, good efficiency except for more frequent efficiency drop in Octant-5 than others (known from Run12). 17 Courtesy of Sanghwa’s Stability Monitor

LL1 Efficiency (North) Relatively frequent low efficiency seen in Octant-1 and 5. These tiles are located at same location on the LL1 board (not clear if it is correlated). 18

Luminosity Weighted Average Efficiency 19

LL1 Efficiency (South) Lumi Weighted Plot by Sarah Coussin 20

LL1 Efficiency (North) Lumi Weighted Plot by Sarah Coussin 21

LL1 Efficiency Weighted Average OctantSouthNorth %95.5 % Calculated by Sarah Coussin 22 Over all LL1 efficiency > 98% except for N.Oct1~95%

MUTR PERFORMANCE 23

Station-3 and Dry Air System 24

25 MuTr Beginning of Run13 Slide from Quarterly Meeting (Sanghwa)

HV Status at the End of Run13 South HVNorth HV 26 Disabled Feb.5 Disabled May 11

MuTr Disabled HV Channel History RunDateSouthNorth 13 Feb.4, (2)2 (0) Jun.8, (1)3 (1) ½ Clamp Install (Top Octants) 12 Jan. 20, (4)8 (2) Jun. 20, (4)9 (3) ½ Clamp Install (Bottom Octants) 11 Feb. 17, (3)5 (2) Apr. 27, (3)5 (2) Cramp Prototype Test North Oct.6,7 10 Jan. 25, (1)3 (2) May 26, (2)2 (2) Decapacitation (South) 9 Feb. 5, (5)3 (0) Jul. 5, (5)6 (2) Decapacitation (North) 8 27

RUN13

Radio Graph (South) Reconstructed Tracks Plot by Margaret A. Jezghani (GSU)

Radio Graph (South) Reconstructed Tracks Plot by Margaret A. Jezghani (GSU)

Summary Total W trigger rates (trigger mix SG1, RPC1&3, MUID) survived BBC~ 5MHz without prescaling. All ADTX/MRG remain unmasked except for temporary periods. LL1 Efficiency Occasional low efficiency observed in South Octant-5, North Octant-1 & 5 though, the luminosity and runtime weighted average turned out to be >95%. MuTr FEE also remained unmasked. MuTr HV are survived mostly, except for one channel which is masked in the middle of run. MuTr acceptance was active except for half octant in North arm. 31

SHUTDOWN PLAN

Cathode Cable in mis-contact : South Station-1 Oct-5, Gap-2 33

High Noise Rate in South St-1 Oct-3 Gap-2 34

North Station-3 Octant-1 North Station-3 Octant-1 stands outSee next page for gap decomposition 35

North Station-3 Octant-1 Gap-2 <-Gap-1 is OK 36

North Arm WestEast Station-1 Noisy ADTX Check grounding Noisy ADTX Check grounding Station-2,3 37 Need to change FEE boards S3 O2 C S3 O7 C S1 Q3 C3 HV St-3 Oct4 N341-0

South Arm West East Noisy ADTX Check Grounding Noisy ADTX Check Grounding Station-2, ,11138 S3 O5 C S2 O3 C S3 O4 C5 HV St3, Oct1 S311-0 (couldn’t fix) HV St3, Oct7 S371-6 (couldn’t fix)

MuTr RX Card Debugging (1) RX card transmits electrical signal to optical. We have only 3 spare good boards and 7 spare boards to be debugged. To be tested at John Haggerty’s test bench. 39 MUTR FEE RX card DCM opticalelectrical

MuTr RX Card Debugging (2) 40

Debugging MRG FPGA Symptom South Octant-1Constant Rates (Threshold dependent) South Octant-3Excursion w/ time constant of ~20minutes North South Run12 Octant-1 Cosmic SG1~50kHz Run12 Octant-1 Physcs SG1~1kHz Plot by Dahee (Ewha University) South Octant-3 Above two octants are running with older version of MRG FPGA in Run13. Both are observable with cosmic circumstances FPGA: verilog HDL 41

Shutdown Summary Itaru/Minjung/Kiyoshi/Takeru + LANL crews work on maintenance Address on High noise ADTX Fix loose cathode cable connection in South St-1 Debug MRG FPGA Code Replace MuTr-FEE frequently cause errors MuTr HV server upgrade (Martin) Repair spare RX cards Inspect dry air covers (fragile tube connection). 42

South Disabled List S1710 ✔ S2717 ✔ S3110 ✔ S3312 ✔ S3815 ✔ S2113 S2717 S2131? 3815 S3312 S1225 S1710 S3110 Run# Broken Anode/Card listed in disabled list

Disabled List N1330 ✔ N1416 ✔ N2226 ✔ N3211 ✔ N3410? N2226 N1416 N2512 N3211 N3714? N3410 N1330 North N2134

Acceptance 45 Possible loose cathode connection when SMM moved to run position before Run13

MuTr Radio Graph (North) Plot by Laura Patel (GSU) Octant-2

Radio Graph MuTr South Plot by Laura Patel (GSU) Run#388266