Revision of API RP 17N Subsea Production System Reliability, Technical Risk & Integrity Management Don Wells (Hess)

Slides:



Advertisements
Similar presentations
ASTM OFFICERS CONFERENCE SUBCOMMITTEE CHAIRMENS DUTIES AND RESPONSIBILITIES.
Advertisements

Background Presenters Work done in preparation for WHS changes
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Transition from Q1- 8th to Q1- 9th edition
Don Wells Hess Corporation
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
Don Wells Hess Corporation
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Product Lifecycle Management
1 Subsea Reliability and Integrity Management Reliability and Integrity Management – Have very similar intent - almost the same definition – Treated separately.
Cover graphic should fill and not exceed the defined grey box. June 27, 2013 Gary Devlin API Subcommittee 18 – Quality Task Group 7: Product Life Cycle.
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
ToR of GEOSAF2 WG on Operational Safety Review of WG2.
API Subcommittee 17 Industry Standards for Subsea Equipment
© Chevron 2013 D EEP S TAR ® A Global Deepwater R&D Consortium Task Report Update: DeepStar Study AUV Interface Standards for Deepwater Fields Reporting.
INTERNATIONAL STANDARD ISOTC67/SC4M 1 st edition Petroleum and natural gas industries — Well integrity for the operational phase.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
API Standard 6X: Design Calculations for Pressure-Containing Equipment
Kristin Heinemeier, Ph.D., P.E. Technical Director Brooks Energy & Sustainability Lab Texas Engineering Experiment Station Texas A&M University System.
City of Watsonville Climate Action Plan and Carbon Fund Project Technical Advisory Committee Meeting #7 Final Meeting April 9, 2014.
Current Inspection Process for Operators of Hazardous Liquids Pipelines Rod Seeley OPS SW Region Director May 18, 2005.
API RP 17 N Update Subsea System Reliability and Integrity Management Presented by: Mark Siegmund - API 17N Chairman Jan 18, 2011.
Common Activities Activities and Tasks in the WBS.
Don Wells Hess Corporation
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
PER15K Protocols for Equipment Rated Greater Than 15,000 PSI ECS Report
International Standards and Regional Regulations.
API RP 6HP (draft 5.2) Status Presentation Tech Session II Summer Standards Conference.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
API Recommended Practice 17X Recommended Practice for Design, Installation, and Maintenance of Subsea Booster Pump Systems Status Report October 3,
API 17N Subsea Production System Reliability and Technical Risk Management Don Wells Hess Corporation.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
Status: Draft Status report for revision of ISO (API 17F) Winter meeting Houston January 2010.
Qualification & Training of Work Planners Steven K. Little Work Control Department Manager.
19th January 2012 Don Wells (Hess)
Design VHDL 04 Language Revision 25 Feb 03 Stephen Bailey Chair, IEEE 1076 Working Group (VHDL Analysis and Standardization Group -- VASG)
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Status: Draft Status report for revision of ISO (API 17F) Summer meeting Washington June 2010.
STAKEHOLDER ENGAGEMENT PROCESS FOR ENERGY EFFICIENCY BUSINESS PLAN DEVELOPMENT March, 2016.
PRODUCT VERIFICATION Adapted from the NASA Systems Engineering Handbook for CSULB EE 400D by Alia Bonetti.
Pipeline Safety Management Systems
Instructor: Lloyd Hancock
API FALL MEETING November , 2013 New Orleans, Louisiana
API SPRING MEETING May , 2014 Orlando, Florida
API SC19 HPHT Template (Proposed as SC19TR1)
Computerized Systems in Clinical Research
Task Group Status January ,11, 2017
API 17Q – Subsea Equipment Qualification
Task Group Status January 13, 2016
Status Update on API 16Q / 16R / 16F
API 14H Task Group Status Proper Classification of Document
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
First 8 slides are what was presented in San Fransisco…
API RP 16AS June 2017 Recommended Practice for Integration of Subsea BOP Equipment Systems for Drilling Wells – Update.
SC6 Summer ’13 Meeting: WG 14H Update
API SC 10, Work Group 3 Update:
Impact on SC 6 Documents by Kenneth Young
API 17H TASK GROUP January 15, 2013.
Don Wells Hess Corporation
API 14H Task Group Status Proper Classification of Document
Common Understanding Way forward
Discussion Points API RP 17A Task Group Members
PSS verification and validation
CSOEM Materials Advisory Resource Group
Task Group Status January 2013
API 17H TASK GROUP June 26, 2013.
Working with Project Management Processes
Project Name Here Kick-off Date
Presentation transcript:

Revision of API RP 17N Subsea Production System Reliability, Technical Risk & Integrity Management Don Wells (Hess)

Agenda Introduction Membership General Plans / Progress Detail Progress Integration 17 Committee/ISO

Introduction Incorporate Integrity Management into current API 17N …Subsea Reliability and Technical Risk Management Recognize and incorporate integration with other Industry initiatives Incorporate updates based on feedback from using existing 17N document Respond to recent industry experiences

Membership Room for additional membership Organized into subcommittees Design and Decommission Manufacture, Assembly, SIT, Installation, Commissioning Operations Technology Qualification Regulations Room for additional membership Opportunity to Make a Difference

Membership Graeme Davies – DNV Chairman 2012 John Fassero – ExxonMobil Karl Woods – Woodside Martha Viteri – DNV Michael Taylor – FMC Mzahid Mamot – Petronas Paul Kefford – Chevron Reza Mostofi – DNV Ronald Pechacek – NASA – United Space Alliance Stephen May – Cameron Mike Theobald – Maersk Oil Karina Vitale – Chevron Runar Østebø – Statoil Jason Strouse – National Coupling Anibal Dam – BP John Macneill – Stress Engineering Chairman 2012 Don Wells – Hess Co-Chairman John Allen - GE Mark Siegmund – BP Champion John Strutt - Astrimar Record Keeper Adriana Botto – Wood Group I.M. Membership Lars Buus - DNV David Valentine – NASA – United Space Alliance Denver Roopchand – Atkins Dane Tipton – National Coupling Fuad Ahmad – Petronas James Cencula – GE

Mandate / Goals Add Integrity Management to Current Document Incorporate into all existing KPs & Stages from Concept to Installation / Commissioning Add an Operations Stage / Section Change Tone from Production to Integrity Current tine reflects maximizing production Will add Broader Integrity Environment, etc. Decide on Prescriptive vs. Safety Case Ensure Tie-in with other API documents i.e. API 17 V

General Progress 2010 – 2011 2012 - Planned Storming and forming - Complete Gap Analysis – Mostly Complete Added Runar Østebø – Statoil & convener of ISO/TC67 WG4 2012 - Planned Define Tone (prescriptive / recommend) Work the Gaps Work the Interfaces Industry Peer Assist Workshop (SURF IM Forum)

Detailed Progress Define Scope _ Define Charter _ Divide and Conquer…..Regular Subcommittee meetings 1. Design and Decommission New Key Process (KP) for Through Life under development Does API want Risk Based or Safety Case Approach? (Hybrid?) don’t have all the answers yet. We are working it and this is a representation of where we are. Storm and Form approach has been taken

Detailed Progress Divide and Conquer – cont. 2. Manufacture, Assembly, SIT, Installation, Commissioning Matrix Developed Where & How to test being worked Does Verification and Validation need new KP? (Rewrite KP06?) MOC being worked

Detailed Progress Divide and Conquer – cont. 3. Operations Reviewed and Raised issues with existing 12 KPs Proposed 3 additional KPs Field Modifications Inspection and Monitoring Remedial Intervention Added 3 Processes to “Project Phase Guide to Processes”

Detailed Progress Divide and Conquer – cont. 4. Technology Qualification New Risks Identified – commercial obsolescence Keep integrated as a section in API 17N Utilize DNV RP A-203 as much as possible Completed Activities Received industry feedback on main challenges with Qualifying Technologies Strawman created for TQ section Activities in Progress Drafting started Defining the proper use of TRLs Path Forward Consolidate and review individual sections

Detailed Progress Divide and Conquer – cont. 5. Regulations Managing Committees 1-4 Interfaces Will lead Prescriptive vs. Recommend discussions On hold until more definition / decisions from other committees

Path Forward Path Forward Write Review Continue Subcommittee work Outline of Process to use as QA tool Common Matrix to combine / review completed work Work the idea of using SURF IM Forum to discuss with industry and gather additional input Write Review Ballot – still aiming for year end 2012

Integration API 17A, API Q1 ISO DNV RP A203/API RP 17Q? 14224 - Collection and exchange of reliability and maintenance data for equipment 20815 - Production assurance and reliability management 15663 - Life Cycle Costing TR 12489 - Reliability modeling and calculation of safety systems Review committee draft document Feedback 17N specific comments DNV RP A203/API RP 17Q?

Questions?