LEAN COMMISSIONING: MAKING YOUR COMPANY’S PROCESS MORE EFFICIENT & EFFECTIVE ACG 9 th Annual Conference April 18, 2013 Chicago, IL Derek De Jesús, CxA,

Slides:



Advertisements
Similar presentations
Motorola Confidential Proprietary MOTOROLA and the Stylized M Logo are registered in the US Patent & Trademark Office. All other product or service names.
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Commissioning. What is Commissioning? And the word Authority?
What Constitutes a Quality Commissioning Job?. Agenda Preconstruction Services –Brian Toevs, PE Construction Services –Rusty Ross, PE, LEED TM, CxA Client.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
Chapter 9 Integrative Process 1 © 2013 Green Building Academy. All rights reserved.
The Pit Crew: Strengthening the M&O and Facilities Parthership APRIL 3-6, 2013, LONG BEACH, CA.
Building Enclosure Commissioning (BECx): Practical Project Implementation.
PENN Community Project SUG Presentation April 8, 2002.
Product Design and Process Selection
Sustainability Internal Drivers and Self-Assessment Dennis J. Stamm VP, Director Lean Enterprise Consulting February 22, 2010.
Chapter 1: The Database Environment
DESIGN-BUILD CM Perspective Owner’s Expectation – DB is Master Builder Stakeholder’s Expectation – DB must satisfy their requirements DB’s Expectation.
N A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project.
Presented By Brandon Togneri. The Problem Organization – Simple organization is a challenge to most businesses everywhere – This is applicable to Hospitals,
The 5 th Annual Conference on Total Building Commissioning 2009 Commissioning Changes in LEED 2009 Paul McCown, PE, CxA, LEED AP, CEM SSRCx, LLC.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Commissioning for Sustained Building Performance Building Performance Birmingham, AL Marriott 9/29/11 Introduction to Commissioning and Retro-Commissioning.
Kristin Heinemeier, Ph.D., P.E. Technical Director Brooks Energy & Sustainability Lab Texas Engineering Experiment Station Texas A&M University System.
Dan Frasier, PE, CCP Successful Turnover of New and Renovation Construction Projects Successful Turnover of New and Renovation Construction.
Balancing Quality Service with Operational Efficiency Judy Wright & Marv Sauer – April 19, 2011.
1 Chapter 15 Methodology Conceptual Databases Design Transparencies Last Updated: April 2011 By M. Arief
Phoenix Convention Center Phoenix, Arizona Existing Building Commissioning (EBCx): A Strategy for Improving Your Building Performance Track: Building Performance.
Integrated Projects BIMLEAN Collaborative Agreements I. Business case for Visual Legal Collaboration.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Welcome to Lunch & Learn Simplify Your Digital Workflow with Smarter Solutions.
Welcome To Business Summary DiveIn Incorporated is a small company that specializes in the sales of swimming pools supplies to homeowners by mail order.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
Building Commissioning: Cx 101 Brock Graham, Gilbane Building Co. Michael Gannon, BVH Integrated Services November 15, 2010.
The Engineering Design Process * The "Engineering Design Process" is a general outline of steps that aid in the development, construction and/or manufacture.
Birmingham, AL SERBCA Fall Conference Presented by: Gary Sweatt, CxA, QCxP.
Scoping a Commissioning Job in Terms of Contractor Involvement ???
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Information Architecture & Design Week 10 Schedule - Construction of IA and Web - Rosenfeld Chapters 17 & 18 - IA Tools - Presentations.
Schedule Introduction to Web & Database Integration Tools and Resources HTML and Styles Forms and Client-Side Scripts DB Engines Forms Processing and Server-Side.
How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1.
Managing Documents the Right Way IA354 Amanda Murphy.
Take the Risk out of Sustainability Willis Construction Risk Management Conference September 2013.
BAASS Connect 2015 Getting Your Business on Board with Customer Relationship Management BAASS Moderator: Zainab Salihi Guest Speaker: David Beard, Sage.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Kanban. What is Kanban Kanban means many things. Literally, Kanban is a Japanese word that means "visual card". At Toyota, Kanban is the term used for.
A CRM (Customer Relationship Management) is one of the most valuable systems that any small business can implement. CRM enables small business owners to.
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
Introduction to Energy Efficient Design
Sustainability Internal Drivers and Self-Assessment Dennis J. Stamm
Mel Wendell – Mountain Pointe High School
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
What is Lean Construction?
Oliver Laasch, Roger N. Conaway, by
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
The Times 100 Business Case Studies
Introduction to Lean Emily Varnado.
Green Building and Sustainable Architecture
The Impact of Cloud Computing to Technology-Based Companies
Sustainability Internal Drivers and Self-Assessment Dennis J. Stamm
Green Building and Sustainable Architecture
Qualities of a Digital Marketing Executive
Project Information Management Jiwei Ma
EMBA 8355 Satish Nargundkar
Ready, Set, Goal! The Key to Practice Success
Introduction Objectives Common Issues with planning Key importance of CP in construction industry HOW TO IMPROVE THE CONSTRUCTION INDUSTRY THROUGH COLLABORATIVE.
Lean Six Sigma Green Belt
Presentation transcript:

LEAN COMMISSIONING: MAKING YOUR COMPANY’S PROCESS MORE EFFICIENT & EFFECTIVE ACG 9 th Annual Conference April 18, 2013 Chicago, IL Derek De Jesús, CxA, LEED AP BD+C National Commissioning Manager KJWW Engineering

Introduction

SHARE, SUPPORT, LEARN 1. “Lean” – What, Why and How 2. Applying “Lean” ideas to Commissioning

What does “lean” mean? Webster to incline, deviate, or bend from a vertical position Weight Watchers Reduce weight through healthy eating and exercise Toyota The two focal points of the principles are continuous improvement and respect for people Motorola aimed at minimizing variability in manufacturing through the standardization of product defect measurement….optimizing customer value and reducing waste

Why do we get “lean”? Cut waste Get to our goal quicker Save money, Increase profit

How do we get “lean” Identify waste Listen to your client Integrate and adapt

Apply “lean” thinking to Commissioning

Apply “lean” thinking to Commissioning Project Programming DesignOccupancy AcceptanceConstruction

Programming Phase Earlier the better…but why? Integrate, Collaborate, Document Owner’s Project Requirements How effective is this tool? Who is really driving the project? Establish Commissioning Process

Design Phase Design Reviews Don’t be afraid to talk, converse How do you do this on a D/B/B vs D/B? Specifications Purpose….contract for the contractors Get rid of the duplicative redundant duplication

Design Phase Commissioning Plan What is your definition? What do you use this tool for? Living document…hardly Use it, preach it, enforce it Incorporate spec language to reduce duplication How do people learn?

Design Phase Actions Log Change the nomenclature The MOST IMPORTANT TOOL! Document EVERYTHING! Database vs Excel vs text file Relationships, macros, filters, reports, etc…

Construction Phase Submittal reviews Does a concurrent review really work? Process is completely different for D/B vs D/B/B Site Observations, Meetings Get to the point already Invite only those needed

Construction Phase Actions Log Demand action Pre-Functional Checklist The 2 nd worse document in Commissioning History What is your goal with this? Who is doing it and how? Manage, document Extract the right information Require only the requisite information

Acceptance Phase Scheduling Pull method IPD and D/B are easiest Not static but not rocket science either Be productive by making known your goals

Acceptance Phase Functional Performance Test When are these documents developed? How is it developed? Collaboration is required Get the contractor to perform as part of the PFC

Occupancy Phase and Beyond O&M Manuals Electronic…duh, but what about interactive…? How will the owner use them? Does the staff have laptops, tablets? Building have wifi for access online documents? Sale to the Owner early O&Ms that are more than pdfs Create a true Systems Manual as a standard, your building will thank you

Occupancy Phase and Beyond Study, page 8

Wrap Up