Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.

Slides:



Advertisements
Similar presentations
Paulo Manso CDM EB September, 2011 Proceeder for Submission & Approval Standardized Baselines.
Advertisements

Technology Transfer in the CDM DUAN Maosheng Tsinghua University Linking Climate Mitigation Policy and Modeling in China Workshop February 18, 2006 Beijing.
The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
BASELINE STANDARD UNFCCC secretariat workshop
The role of CDM in technical change in refrigeration - current CDM regulations - successful CDM projects and methodologies - failed projects and methodologies.
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Fundamentals of PDD Analysis Recap of Theory and presentation of an illustrative PDD by Steve Thorne Maputo second SSA regional workshop 17 August 2004.
Capacity Development for CDM - National Workshop on PDD, Cairo, June Capacity Development for CDM Fourth National Workshop Cairo, June.
Module 2: Project appraisal M2. M2. Project appraisal Time lines -10:45 -12:30: Content: Elements of the project appraisal (SSN) –Blunt tools blunt data.
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
Ensuring Effective Monitoring, Certification and Verification of Emissions by Jed Jones Lloyd’s Register.
1 Rajesh Kumar Sethi Chair of the CDM Executive Board Clean Development Mechanism 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
World Bank Workshop on CDM Methodologies and Technical Issues Associated with Power Generation and Power Saving Project Activities December 3, 2005 Montreal.
Base Line Methods Developing Forestry and Bioenergy Projects with CDM Quito, Ecuador March, 2004.
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
Baselines and Additionality Training Seminar for BioCarbon Fund Projects July 11-13, Washington DC. Lasse Ringius. World Bank Carbon Finance Business.
Development Alternatives Baselines & Additionality Methodologies Workshop on Clean Development Mechanism: Opportunities in Rajasthan January 28-29, 2005.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
Creating the Carbon Asset: PCF Approaches to Baselines and Additionality Sao Paulo, Brazil November 20-22, 2002.
CDM Methodology World Bank Carbon Finance: Interpretations and Approaches to Baselines, Monitoring and Calculation of Emission Reductions Bonn, 6 June.
LULUCF Concepts Training Seminar for BioCarbon Fund Projects February 8 th 2008 Timothy Pearson and Sarah Walker Winrock International.
Carboncredits.nl Baseline Methodologies Dispatch Analysis Gerhard Mulder Project Officer.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
CDM Project Developers Workshop.  Baselines – what, types of baselines, baseline scenarios, baseline emissions.  Additionality – what, why, how  Establishing.
Proposed plan to implement Capacity Development for CDM project in the forthcoming period Dr. DAO DUC TUAN Eng. NGUYEN KHAC HIEU National Office for Climate.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
Case Study2: Reforestation Project Using Native Species Around AES-Tiete Reservoirs ARNM0002 Comments on Baseline Methodology Fourth Regional Workshop.
AIT Baselines and Additionality Sudhir Sharma Asian Institute of Technology Bangkok, Thailand 24 th March 2004.
SECTION IV: GENERAL DESCRIPTION OF STEPS TAKEN OR ENVISAGED BY NON-ANNEX I PARTY TO IMPLEMENT THE CONVENTION Workshop on the Use of the Guidelines for.
" Current status and perspectives of Clean Development Mechanisms Buenos Aires, September 2003 Content of the presentation: The cdm.unfccc.int homepage.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth Accra, Ghana 7 th and 8 th November 2005.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Conclusions Buenos Aires, – December 5 th, 2004 CDM Methodologies and Project Design Workshop for CDM Project Developers.
Does project reduce, prevent or mitigate the release of 1 or more of the Kyoto gases [See appendix 3]? Does the project remove CO2 or other GHGs from the.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
Guatemala: El Canada Hydroelectric Project Meth Panel decision on its proposed baseline methodologies May 2003.
Regional perspectives under the Clean Development Mechanism Jose Domingos Gonzalez Miguez, Ministry of Science and Technology, Brazil.
UNFCCC Workshop on the preparation of national communications from non-Annex I Parties General description of steps taken or envisaged by non-Annex I.
Guidelines for non-Annex I National Communications Implications for Assessment of Impacts of, and Adaptation to Climate Change Asia-Pacific Regional Workshop.
CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
Introduction of information note Compilation and analysis of available information on the scope, effectiveness and functioning of the flexibility mechanisms.
1 NATIONAL SYSTEMS UNFCCC Workshop on National Systems under Article 5, paragraph 1, of the Kyoto Protocol 11–12 April 2005 Wissenschaftszentrum, Bonn,
The Role of Designated Operational Entities in the CDM High-Level Roundtable on CDM Reform World Bank Carbon Finance Business Washington, D.C., October.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
UNFCCC Workshop on the Use of the Guidelines for the Preparation of National Communications from non-Annex I Parties National GHG Inventories Port Louis,
Session 4.2. Criteria for baseline setting and monitoring Dealing with methodological matters in the ERUPT programme Zsolt Lengyel SenterNovem Carboncredits.nl.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
CDM BASELINE METHODOLOGIES: The devil is in the details DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo.
CDM Project Design Document CDM Project Design Document Training Course May 22, 2003 CCIC Conference Room Manila Observatory Ateneo de Manila University.
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
Conservativeness in baselines WB workshop for CDM project developers Buenos Aires, 5 December 2004 Lambert Schneider.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Host Country Institutional Issues Miriam Hinostroza UNEP.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
Baseline approaches and methodologies: interpretation of Para 48(a)-(c) M&P Buenos Aires, – December 5 th, 2004 Johannes Heister – World Bank, Carbon Finance.
Visit of the S. Korean delegation UNEP Risø Centre, 1 September 2005 Jørgen Fenhann Analysis of the CDM project pipeline Content of the presentation: What.
Implementation Subprogramme
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
JISC work regarding criteria for baseline setting and monitoring
Enhanced transparency framework and examples of flexibilities
Presentation transcript:

Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003

baselines The baseline for a CDM project activity is the scenario that reasonably represents the anthropogenic emissions by sources of greenhouse gases that would occur in the absence of the proposed project activity.

Baselines Para 45 M&PA baseline shall be established: (b) In a transparent and conservative manner regarding the choice of approaches, assumptions, methodologies, parameters, data sources, key factors and additionality, and taking into account uncertainty; (c) On a project-specific basis; (d) In the case of small-scale CDM project activities …in accordance with simplified procedures developed for such activities; (e) Taking into account relevant national and/or sectoral policies and circumstances, such as sectoral reform initiatives, local fuel availability, power sector expansion plans, and the economic situation in the project sector.

Baselines Para 46 of M&P. The baseline may include a scenario where future anthropogenic emissions by sources are projected to rise above current levels, due to the specific circumstances of the host Party.

Additionality in the beginning… Environmental Investment Financial Technical

M&P Text Para 43 M&P: “A CDM project activity is additional if anthropogenic emissions of greenhouse gases by sources are reduced below those that would have occurred in the absence of the registered CDM project activity.”

How ODA was dealt with Preamble to Decision 17/CP.7: Modalities and procedures for a clean development mechanism as defined in Article 12 of the Kyoto Protocol “Emphasizing that public funding for clean development mechanism projects from Parties in Annex I is not to result in the diversion of official development assistance and is to be separate from and not counted towards the financial obligations of Parties included in Annex I”

ODA in the PDD A.4.5. Public funding of the project activity: “There is no Official Development Assistance in this project.” ANNEX 2: INFORMATION REGARDING PUBLIC FUNDING: “There is no Official Development Assistance in this project.”

Baseline and additionality in the M&P Para 48 of M&P: “In choosing a baseline methodology for a project activity, project participants shall select from among the following approaches the one deemed most appropriate for the project activity, taking into account any guidance by the executive board, and justify the appropriateness of their choice: (a) Existing actual or historical emissions, as applicable; or (b) Emissions from a technology that represents an economically attractive course of action, taking into account barriers to investment; or (c) The average emissions of similar project activities undertaken in the previous five years, in similar social, economic, environmental and technological circumstances, and whose performance is among the top 20 per cent of their category.”

Baseline and Additionality in PDD B.4. Description of how the anthropogenic emissions of GHG by sources are reduced below those that would have occurred in the absence of the registered CDM project activity: “Given that the results of the financial analysis conducted clearly show that that implementation of the this type of project is not the economically most attractive course of action and therefore this kind of project is not part of the baseline scenario, it is concluded that the **** Project is additional.”

Screens National and/or local legislation IRRs and NPVs are not bulletproof Second line of screening in the barrier tests

M&P barriers Appendix A to Annex B “1. Project participants shall provide an explanation to show that the project activity would not have occurred anyway due to at least one of the following barriers: (a) Investment barrier: a financially more viable alternative to the project activity would have led to higher emissions; (b) Technological barrier: a less technologically advanced alternative to the project activity involves lower risks due to the performance uncertainty or low market share of the new technology adopted for the project activity and so would have led to higher emissions;

SS M&P barriers (c) Barrier due to prevailing practice: prevailing practice or existing regulatory or policy requirements would have led to implementation of a technology with higher emissions; (d) Other barriers: without the project activity, for another specific reason identified by the project participant, such as institutional barriers or limited information, managerial resources, organizational capacity, financial resources, or capacity to absorb new technologies, emissions would have been higher.”

SS Barriers in PDD B.3. Description of how the anthropogenic GHG emissions by sources are reduced below those that would have occurred in the absence of the registered CDM project activity (i.e. explanation of how and why this project is additional and therefore not the baseline scenario) (Justify that the proposed project activity qualifies to use simplified methodologies and is additional using Appendix A to Annex B of the simplified M&P for CDM small-scale project activities. ) (National policies and circumstances relevant to the additionality of the proposed project activity shall be summarized here as well.)

So how has the EB used the M&P Step 1: submission of PDD plus methodology documentation to AE Step 2: Secretariat passes PDD plus to EB meth panel Step 3: Meth panel assigns panelist and appoints 2 desk reviewers to review methodologies using questionnaire in 10 days. Documents also published on website for public comment. Step 4: reviewers pass completed questionnaires to secretariat who pass it back to meth panel. Step 5: Meth panel assemble advice to the EB who decides on the validity of the methodologies and assign a, b or c. Step 6: Methodologies published for public scrutiny for 30 days.

Conclusions Baselines and additionality are intimately linked The EB has interpreted the definition of “additionality” (para 43 of M&P) in terms of both environment and financial The general rule is that a project is additional if it is not part of the baseline But tests are still not robust enough Financial appraisals (IRRs and NPV) can be misused as can the barrier tests Who is investing, where investment happens, type of project (technology, retrofit, and greenfield) affects the appetite for investment

Conclusions In using financial analysis for additionality tests requires higher (conservative) IRRs and lower NPVs The role of national/sectoral policy/regulation in baseline/additionality analysis International non-tariff implications can mask investment requirements in host countries Definitions of if/where ODA (public funding) can be used in the CDM still needs further definition Small-scale interpretations of baseline methodologies is slow In general the EB interpretation of additionality has enhanced the integrity of the CDM