Annual Program Review. Today’s Objectives Demonstrate scope and progress of LWMP work Review problem, causes and solutions Recognize significance of community.

Slides:



Advertisements
Similar presentations
creating a sustainable world The Chesapeake Bay TMDL A Policy Model for Nutrient Pollution Reductions James Noonan October.
Advertisements

Water Pollution. Definitions Impaired Waters Section 303(d) of the Clean Water Act requires states to develop lists of impaired waters, those that do.
What are TMDLs? and What Might They Mean to MS4 Permittees?
Burandt Lake TMDL (Total Maximum Daily Load) Water quality in an urban lake 2/7/2008.
The Lake Allegan/Kalamazoo River Total Maximum Daily Load (TMDL) Plan Implementation by Jeff Spoelstra, Coordinator, Kalamazoo River Watershed Council.
Shingle Creek and West Mississippi Watershed Management Commissions Third Generation Watershed Management Plan.
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
1 Municipal Separate Storm Sewer System (MS4) National Pollutant Discharge Elimination System (NPDES) Permit Compliance Management Storm Water Administration.
Upper Providence Township Stormwater Management MS4 Program.
Santa Ana Region Stormwater Permit TMDL Requirements and Costs
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
When It Rains, It Drains An Overview of the Hempfield Township’s New Storm Water Management Program.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Imperial River: Water Quality Status and Basin Management Action Plan.
Expedited Projects + Innovative Teamwork = Measurable Improvements to the Health of Lake Okeechobee and the St. Lucie and Caloosahatchee Estuaries.
Introduction to TMDLs for Nutrients Presented by: Dr. Scott Emery January 15, 2009.
SUSTAINABILITY TEAM | May 19, 2010 Illinois APA, September 24, 2010.
 Review/compare effectiveness monitoring categories and approve a set  Review and compare hypotheses-driving questions and provide guidance or approval.
Chanhassen’s 2006 Surface Water Management Plan Carver County WENR Meeting March 27, 2007 Lori Haak Water Resources Coordinator
Rogue Basin Water Quality Implementation Plans Greg Stabach, Natural Resources Project Manager Rogue Valley Council of Governments.
Integrating LID Into the Development Planning Process.
NPDES Stormwater and the Town of Wrightsville Beach.
Implementing the Municipal Separate Storm Sewer System Permit Stormwater Division General Services Department Board of Supervisors Work Session October.
Catoctin Creek: A Stream in Distress Catoctin Watershed Project A Partnership of County and Citizen Organizations.
Agua Hedionda Watershed Management Plan Watershed Planning Group Meeting June 5, 2008 Carlsbad, CA.
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Orange Creek Basin Management Action Plan Alachua County Commission December 11, 2007 Fred Calder, FL DEP (850)
What is the Chesapeake Bay TMDL? Total Maximum Daily Load –Amount of pollutants that a water body can receive and still support designated uses Drinking,
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
Implementing Post-Construction Stormwater Controls Greg Davis, EPA Region 8.
Urban Water Research Todd Rasmussen Associate Professor of Hydrology The University of Georgia, Athens and Pending Director, Urban Water Research Institute.
Phase II National Storm Water Regulations What’s in it for you?
N.P.D.E.S. PHASE II Virginia Beach. Local Condition AREA 312 SQUARE MILES CHESAPEAKE BAY 98 SQUARE MILES WATERSHED SOUTHERN 209 SQUARE MILES WATERSHED.
KWWOA Annual Conference April 2014 Development of a Kentucky Nutrient Strategy Paulette Akers Kentucky Division of Water Frankfort, KY.
An Overview of our Community’s Stormwater Management Program
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
URBAN STORMWATER: A PERFECT STORM FOR CHANGE Jon M. Capacasa Director, Water Protection Division EPA Region III.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
1 Lake Ballinger and McAleer Creek Watershed Strategic Action Plan Forum Briefing #2 January 27, 2009.
A Traditional vs. Ecosystem Services Approach to Surface Water Management September 16, 2010 PRESENTED BY Carol Murdock, Clackamas County WES Mark Anderson,
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
JULIE MAWHORTER MID-ATLANTIC URBAN & COMMUNITY FORESTRY COORDINATOR CHESAPEAKE TREE CANOPY STRATEGY & WORKPLAN UPDATE CITIZEN’S ADVISORY.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
County-Wide Act 167 Plan “County-wide Act 167 Stormwater Management Plan for Chester County, PA” was prepared by: Chester County Water Resources Authority.
Prepared By: Amaliyar Kamleshkumar ( ) Rathod Nikunj ( ) Parmar mukesh ( ) Patel Raj ( ) Ode Kiran ( )
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Nutrients and the Next Generation of Conservation Presented by: Tom Porta, P.E. Deputy Administrator Nevada Division of Environmental Protection President,
Growing Smarter Pennsylvania’s Land Use Agenda. Percent of Land Developed in Pennsylvania Source: Natural Resources Conservation Service, U.S. Department.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Williamsburg’s Local Strategies to meet the ChesBay TMDL March 2012 Chesapeake Bay Watershed Virginia Maryland Pennsylvania New York Delaware West Virginia.
Erosion and Sediment Control Ordinance. City of Southlake Strategy Map Live Our Core Values The City of Southlake provides municipal services that support.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
Briefing regarding the new State General Stormwater Pollution Control Permit.
Water Pollution: Pollutant Transport Mechanisms
Land Use Challenges In Maryland Today
Water Pollution.
Water Pollution.
Total Maximum Daily Load Program
Land Use and Zoning Committee Special Workshop
Sacramento County Stormwater Quality Program
City of Forest Lake MS4 Program
Mulberry Watershed Management Plan
Anne Arundel County Maryland
MS4 OVERVIEW 2015.
Water Pollution.
Sacramento County Stormwater Quality Program
Presentation transcript:

Annual Program Review

Today’s Objectives Demonstrate scope and progress of LWMP work Review problem, causes and solutions Recognize significance of community Affirm the difficult decisions close at hand

A Brief History of Lake Whatcom Management A working watershed – the first 150 years Contemporary timeline – 1992 to 2007 Accomplishments – 2008

 First efforts to cooperatively manage watershed  First stormwater retrofit project  Lake Whatcom declared a sensitive water body, Interlocal Agreement for joint management formalizes Lake Whatcom Management Program (LWMP)  Impervious surface limited for new construction  Nutrient control required for large developments  Stormwater retention and treatment required for new construction and renovation  First 5-year Management Plan is adopted  Created Silver Beach Ordinance and Watershed/Stormwater Overlays The 1990’s

 Placed moratorium on land divisions smaller than five acres  Permanently restricted building on over 1,200 lots in Sudden Valley  1,400 potential dwelling units eliminated by downzone  Clearing standards adopted for unincorporated areas  Initiated TDR program moving 100 development  Adopted second LWMP 5-Year Management Plan  Banned 2-cycle boat motors  P-fertilizer banned on residential lawns and public properties  Invested in capital improvements to reduce pollutant loads  Infiltration required for new construction and redevel0pment The 21 st Century

ACCOMPLISHMENTS 2008 Purchased three watershed properties from development Pursued re-conveyance of over 8,000 acres of forest land Finalized Agate Bay Preserve conservation easement Implemented City and County Stormwater Plans Coordinated a watershed build-out analysis and developed a consistent methodology for future analysis Coordinated household hazardous waste collection resulting in over 11 tons of toxics removed

ACCOMPLISHMENTS 2008 Collected and presented monitoring data Chronicled land-use regulations that improve water quality Implemented new septic system maintenance regulations Surveyed illicit discharges Responded to Total Maximum Daily Load Technical Report Completed Northridge retrofit and Northshore Drive project Established/extended moratoria on subdivisions and building Initiated pilot projects on P-Best Management Practices

Turning Plans into Action Cable Street Vault InstallationRetention Pit Installation in Sudden Valley

Northridge sand filter / detention pond Turning Plans into Action

North Shore Drive pervious bike lane Cable Street infiltration swale City/County Capital Expenditures: $5M over last six years $9M next six years Cost of Stormwater Infrastructure

Problems Causes Solutions Success

The Problems phosphorus, algal blooms, dissolved oxygen, bacteria, metals, petroleum products, dissolved solids & amount and timing of runoff

The Causes animal waste, failing septics, yard waste, P-fertilizer, detergents, erosion, improper land- disturbance, atmospheric deposition, impervious surfaces, inadequate facilities…

The Solutions  stormwater management plans  LWMP Annual Work Plan  TMDL Implementation Plan land-use compliance targeted land acquisition incentive programs outreach, outreach, outreach

TMDL: What is it and what does it mean? Department of Ecology determined that Lake Whatcom suffers from chronically low dissolved oxygen and elevated fecal coliform bacteria. Total Maximum Daily Load are the amounts of P and FC that the lake can receive and still meet water quality standards. An implementation plan must be prepared, approved and acted on. Insufficient action means non-compliance with State permits, fines and exposure to litigation.

What is success? Removing pollutant sources AND appropriately converting storm water conveyance to infiltration. A cleaner and more predictable water supply healthy ecosystems

Success is convincing people that things must change in order that our expectations for future quality of life can remain the same…

Management Tools 1: Source Reduction  P-Fertilizer use (P)  Animal waste (P, FC)  Yard waste/compost (P)  Cleaning products (P)  Failing Septics (P, FC)  Stream bank stabilization (P)  Shoreline management (P, FC)  Exposed soil (P)

Management Tools 2a: Stormwater Management For the Homeowner and Developer: Residential LID options Homeowner retrofit programs Incentives Outreach, outreach, outreach

Management Tools 2b: North Shore Drive Pervious Bike Lane Cable Street Bio-infiltration Swale Stormwater Infrastructure

Management Tools 3 People Governments can build infrastructure and create incentives, but ultimately the effort MUST HAVE COMMUNITY BUY IN  Conduct targeted outreach  Empower community champions  Provide technical assistance  Develop incentives

Executive Management Team  City Council  County Council  Water & Sewer District Commissioners ICT & Staff Teams OSS inspection Water Supply Waste Water Solid Waste Lake Whatcom website Pledge Program Stewardship Incentives Sudden Valley education & outreach COB Stormwater Plan WC Stormwater Plan LID Programs Watershed Enforcement Permit Review Development Tracking Transportation Planning WC & State Health, WC PW, COB PW, DOE, WWU Development Rights Programs City Acquisition Program) Reconveyance Utilities and Waste Management Land Preservation Stormwater Management Urbanization & Land Development Data Mgmt Community Outreach Transportation Urbanization/Development Team Enforcement Team Data Management Team Stormwater Team Transportation Team Education Team

2009 LWMP WORK PLAN 1)Prepare TMDL Implementation Plan 2)Implement stormwater plans 3)Advance programmatic efforts 4)Secure funding New LWMP 5-yr Management Plan will be developed in It will reflect early actions of TMDL response plan.

Work Plan Additions 2009 Silver Beach Creek Phosphorus Reduction Pilot Project Interagency review of raingarden efficacy Refine Low Impact Development program Pursue animal waste management through Conservation Program on Agricultural Lands (CPAL) and outreach Refine education and community outreach strategy, techniques and messages Enhance compliance program for septic system maintenance

2009 Highlight Silver Beach Creek Pilot Project Showcase key management tools in the highest priority urban watershed Promote community acceptance of stormwater facilities and stewardship messages Demonstrate rapid, scaleable deployment of stormwater programs Stimulate public dialog about benefits of stormwater management

Project Components Bio-infiltration facility at Lahti Drive Retention pond retrofit Silver Beach Creek bank stabilization Targeted homeowner Low Impact Development (LID) and retrofit options Compliance /education program for regulated phosphorus and bacterial sources Monitor water quality improvements in Silver Beach Creek and Lake Whatcom

The Long View TMDL response will renew focus on: Stewardship changes (animal waste, car washing, composting, LID, incentives…) Existing storm water plans Land-use regulations (e.g., zoning, redevelopment, retrofits) Engineering standards (private and public construction) Capital facilities Funding Community champions Cooperation and collaboration Leadership