NOTICE: The contents of this document are proprietary to Rockwell Collins, Inc. and shall not be disclosed, disseminated, copied, or used except for purposes.

Slides:



Advertisements
Similar presentations
Flexible Airborne Architecture
Advertisements

ASAS Thematic Network – Rome April 2003 Session 2-B Cost / Implications ASAS Impact on Ground Systems An Industry Viewpoint Thales ATM Peter.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
ASAS Dream or reality? ASAS TN Workshop April 2003 Presented by Thomas Fixy Manager Air Traffic Information Management.
Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.
Direction générale de l’Aviation civile direction de la Technique et de l’Innovation sous-direction Etudes et Recherche appliquée direction des services.
ASAS TN Third Workshop, April 2004, Toulouse 1 ASAS Implementation in Avionics Pierre GAYRAUD Thales Avionics in collaboration with ACSS.
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.
Advanced Safe Separation Technologies and Algorithms (ASSTAR) Project ASAS-TN2 Workshop #1 Malmö 26 th -28 th September 2005 ASSTAR is a Specific Targeted.
Applications from packages I to III
1st ASAS-Thematic Network 2 Workshop Malmoe 26th-28 th September 2005 “Implementation planning and future packages” Session Moderator: Giorgio MATRELLA.
Sense & Avoid for UAV Systems
CASCADE From Concept to Implementation SUR Division Meeting Brussels, 17 December 2007 Alex Wandels, Jörg Steinleitner, Sorin Muresean CASCADE Programme.
1 Carl B. Jezierski Manager, Airborne Technologies Group Ralph J. Yost Project Lead, Airborne Networks FAA William J. Hughes Technical Center SAE Aerospace.
20 In-Trail Climb experience and an airlines view of ASAS opportunities Captain Rocky Stone United Airlines Manager – Flight Systems Technology.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
Page 1 Aircraft Surveillance Applications (Extracts from ASA MASPS, DO-289) Presented to ASAS-TN 3 rd Workshop Steve Koczo - Rockwell Collins Inc. Jonathan.
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
Airbus vision of future ASAS Christophe MAILY – Airbus ASAS in a future ATM system Rome, April 2006.
ASAS-TN Workshop Glasgow 11 September 2006 Alex Wandels CASCADE Programme Manager EUROCONTROL European Organisation for the Safety of Air Navigation CASCADE.
ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.
Slide 1 July 2004 – FALBALA/WP5/FOR3/D – CENA, DFS, EEC, NATS, Sofréavia & UoG WP2 Current situation analysis – Aircraft perspective Philippe Louyot (CENA)
ASAS FRA OB/T ATM Projects Lufthansa point of view.
FAA System-Wide Information Management Program Overview for SWIM-SUIT Public Lauch Donald Ward Program Manager FAA SWIM Program April 2007.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
1 RFG Overview ASAS-TN Malmö September 2005 Jörg Steinleitner CASCADE Infrastructure WP Leader, EUROCONTROL European Organisation for the Safety.
Shaping Boeing Surveillance Strategy Drivers & Obstacles ASAS Thematic Network II.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
The CASCADE Programme From Concept to Operations ASAS-TN Malmö September 2005 Alex Wandels CASCADE Programme Manager, EUROCONTROL European Organisation.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
Air Systems Division GROUND ASAS EQUIPMENT Michel Procoudine Gorsky ASAS TN2 – Workshop 5 Toulouse 17th-20th September 2007.
Slide 1 July 2004 – FALBALA/WP5/FOR4/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Mark Watson & Richard Pugh ( NATS) CARE / ASAS Action FALBALA Project Dissemination.
Airbus Status on ADS-B In / Out Update
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der.
Aircraft Manufacturer Plans - Airbus Stéphane Marché – Airbus ASAS TN Glasgow, September 2006.
ASAS TN2 Briefing Cyro Stone 15 April 2008.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
C-ATM User Group and ASAS…….. Presented on Behalf of the C-ATM User Group Billy Josefsson, LFV Group ASAS Thematic Network 2, Malmö /28.
Discussions Summary ASSTAR - Crossing & Passing session.
2 nd Workshop, April 2006 ASAS in Tomorrows Airspace Pierre Gayraud, THALES Bob Graham, EEC Tony Henley, BAe Systems Dr Anthony Smoker, IFATCA ASAS-TN2.
Slide 1 Malmö, 6-8 October 2003 – ASAS TN – Session 3: Airborne spacing applications – IAPA/WP00/035/W v2.0 ACAS / ASAS interaction IAPA Project Thierry.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
MRO Europe: Engineering & Maintenance Succeeding with Entry into Service.
ASAS TN Third Workshop, April 2004, Toulouse 1 Session 2 Functional and Technical issues and Solutions Chairperson : JC Richard Secretary : G Matrella.
Session 1: Progress and Status of Implementation and Standardisation RFG Status ASAS-TN2 4 th Workshop Amsterdam April 2007 Jörg Steinleitner CASCADE.
ASAS TN Session 4 summary Billy Josefsson, LFV Rob Ruigrok, NLR.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
ASAS TN2 Final Seminar Paris, April Jean-Marc Loscos, DSNA chairman of the Airborne Surveillance Subgroup of the Aeronautical Surveillance.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
ASAS-TN 3rd Workshop - Airbus ASAS Status ASAS-TN 3 rd Workshop AIRBUS ASAS Status ASAS-TN 3 rd Workshop - Airbus ASAS Status Presented by : Patrick LELIEVRE.
Joint 5 th ASAS TN2 Workshop & 2 nd FLYSAFE Forum Toulouse, September 2007 Experiments on the Impact of Wind on ASPA-S&M Manoeuvres Stephen Broatch,
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
1 Roma, 3-5 April 2006 – ASAS TN2, 2 nd Workshop, Session 1 – When ASAS meets ACAS When ASAS meets ACAS Thierry Arino (Sofréavia, IAPA Project Manager)
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
Project conclusions and recommendations Thierry Arino (Sofréavia)
Chris Shaw, EUROCONTROL Experimental Centre
International Civil Aviation Organization
Chris Shaw, EUROCONTROL Experimental Centre
Ground System implication for ASAS implementation
Karim Zeghal EUROCONTROL Experimental Centre
USER’S EXPECTATIONS AND CONCERNS Aena’s ADS Programme Manager
Presentation transcript:

NOTICE: The contents of this document are proprietary to Rockwell Collins, Inc. and shall not be disclosed, disseminated, copied, or used except for purposes expressly authorized in writing by Rockwell Collins, Inc. 1 ASAS and avionics perspectives ASAS TN, Toulouse apr 04

Rockwell Collins, Inc. - Proprietary Information 2/14 Overview  Key ATM improvement applications?  apps serving capacity, punctuality  Which aircraft to consider?  What makes up for the current ATM situation  Some current in-service aircraft statistics quantities, make, type the relative influx of new aircraft  To what extent can these aircraft accept change  end-end application, analyze layers of the stack  Discussion  apps, required mods, issues and questions; apparent limitations  Conclusion and recommendation  required focus, technical issues, degree of achievable improvement

Rockwell Collins, Inc. - Proprietary Information 3/14 Key ATM improvement applications  Airline value will be in capacity and punctuality improvement  Ability for more movements  Each movement closer to plan  The application benefit should be “direct” to the investing airline  To improve chances of returning any investment AcronymAirborne Surveillance Applications (pack 1) Enhanced crossing and passing operations In-trail procedure in oceanic airspace Enhanced sequencing and merging operations Enhanced successive visual approaches Enhanced visual acquisition for see & avoid Enhanced traffic situational awareness during flight operations Enhanced traffic situational awareness on the airport surface ASPA-C&P ASPA - ITP ASPA-S&M ATSA-SVA ATSA-S&A ATSA-AIRB ATSA-SURF ATSA=Air Traffic Situational Awareness (airborne surveillance) ASPA=Airborne Spacing (airborne surveillance) Business improvement prospect

Rockwell Collins, Inc. - Proprietary Information 4/14 ADS-out and ADS-in  Awareness functions  broadcast current state vector and trajectory data  for others to use  Enhanced vision functions  broadcast current state vector  for others to receive and derive acquisition cues  Track oriented functions  broadcast trajectory data  for others to perform CD&R, S&M, in-trail following  Any new flight crew responsibilities?  Consider procedures, training, liability  Consider convergence, integrity Does each have the same judgment? Need for coordination? (re ACAS) Each aircraft: server and client Issue?Issue?

Rockwell Collins, Inc. - Proprietary Information 5/14 Applications oriented ADS-B requirement X Tx Rx Own

Rockwell Collins, Inc. - Proprietary Information 6/14 Applications oriented ADS-B requirement YY Tx Rx Own X Tx Rx

TBD TBD VHF Comms 1030 MHz Interrogation 1030 MHz Interrogation 1090 MHz reply 1090 MHz reply MMR - PVT IRS - acc/att DADC- alt, IAS, OAT DME - LOP D FMS AFCS Flt crew Voice in/out PVT ES (ADS-B out) Std ‘manual’ interactions EFIS SG EFIS (ND) Mode S Xpdr TCAS 1090 Rx TCAS 1090 Rx TBD E.g SMGCS dBasedBase Data in/out (VMMR) TCP/Traj/RTA

Rockwell Collins, Inc. - Proprietary Information 8/14 Europe: 4200 MEast, Afr: 1583 New airplanes coming in at relatively slow rate Which aircraft to consider? (count >70 seats)

Rockwell Collins, Inc. - Proprietary Information 9/14 Different counts compared  Airbus GMF 20 years (4.5%/ann) Europe, 3000  >6000

Rockwell Collins, Inc. - Proprietary Information 10/14 Different counts compared  Boeing CMO Europe, 3881  years (~ 5%/ann)

Rockwell Collins, Inc. - Proprietary Information 11/14 To what extent can retrofit aircraft accept change?  Application requirements  Aircraft existing functions and systems Application Presentation Session Transport Network Data link Physical End user service Sub networks

Rockwell Collins, Inc. - Proprietary Information 12/14 Retrofit-forward fit relationships Application Presentation Session Transport Network Data link Physical Retrofit application Forward fit application Specific MMIMMI end system interfaceend system interface Specific RF questionsRF questions Interference issuesInterference issues Common HWCommon HW OEM - Specific System architecturesSystem architectures MMI optionsMMI options OEM - Specific IntegrationIntegration RF opportunitiesRF opportunities Advanced technologyAdvanced technology

Rockwell Collins, Inc. - Proprietary Information 13/14 ….. to support change  All applications require “cooperative” aircraft  Single aircraft equipage will not produce the application  ADS-B “in” and “out” required  For the next 10 years  existing fleet largely dominates European ATM operations  New deliveries gain relative importance after 2015  Conclusion  retrofit requirement  However, EFIS, FMS changes?  Datalink: ADS-B in/out required  “Intermediate” and “top” layers of the stack required Surveillance processing / Applications Man machine interface

Conclusion and recommendation  Required focus  ATM improvement aircraft focus  retrofit  By far largest factor on improvement For many years to come  Technical  ADS “in” and “out”, required for any application  Man - machine interface (flight crew interactions)  End systems (FMS interactions)  Applications development  Degree of achievable improvement  Limited to relatively small procedural change Limited responsibility delegation to flight crew –Airline Liability question –Technical “convergence” issue  Investment dilemma  Airline motivation to invest largely depends on return certainty  Requires: Direct and unconditional benefit