Dowell Road Widening From South of HG Truman Road To South of Bean Road Calvert County, Maryland.

Slides:



Advertisements
Similar presentations
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
From US 17 to SR 11 and SR 11 to Cone Road FPID No
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
October 9, 2014 Glenn's Bay Road Widening and Interchange Project.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland.
U.S. 33 Northern Connector Alternative
Narcoossee Roadway Corridor Analysis Osceola County Board of County Commissioners Meeting December 4, 2006
1 Leon County Board of County Commissioners Killearn Lakes Sidewalk Construction and Traffic Calming Kinhega Drive and Deer Lake Road.
Golden Triangle Blvd. Progress Report March 27, 2007.
December 12, 2013 Glenn's Bay Road Widening and Interchange Project.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
AGENDA  PROJECT HISTORY  NORTHERN SECTION UPDATE  SOUTHERN SECTION OVERVIEW  INTERCHANGES  PROJECT SCHEDULE  UPCOMING ACTIVITIES  OPEN DISCUSSION.
From Island Estates Parkway to St. Johns County Line.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Traffic Calming and Fire / EMS Department Emergency Responses Lee Havens, Fire Chief Jonathan Bigony, President Pete Mellits, P.E. / Fire Chief ( )
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
U.S. 150 / S.R. 56 Roadway Rehabilitation Project Thursday, August 22, :00 p.m. Presentation Orange County Community Center Paoli, Indiana.
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Joint Urban Roadway Standards Workshop April 27, 2006.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Community Development Department Construction Phase.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
Phase 2: 30% Design Plans September 4 th, 2012.
Community Development Department Construction Phase BULLDOG DRIVE.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
STA Safety Project PID #76439 December 12, 2006.
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
State Route 268 Rutherford County, TN DESIGN PUBLIC MEETING June 2, 2015.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Community Development Department Dimensional Variance In Connection with The Agreement to Convey Property – City Initiated Application # Palm.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
Approve Humboldt Avenue Pedestrian and Bicycle Improvement Project Plans.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
Morelli Park Reconstruction and Expansion Project Public Hearing and Award of Construction Contract Stockton City Council and Stockton Redevelopment Agency.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Urban Street Design Standards Overview of Project and Details
Transportation Engineering Business Development Workshop Department M
Jefferson County SA Red Rocks Site Approval
Project Status & Right-of-Way Acquisition
Col. Pike Multimodal: About the Project
District 3 Complete Streets Projects
SE 12th Street Roadway Improvements February 8, 2005.
1200 West Widening and Reconstruction Project
1700 South Widening and Reconstruction Project
Walker Street Reconstruction Project 25% Design Public Hearing
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Presentation transcript:

Dowell Road Widening From South of HG Truman Road To South of Bean Road Calvert County, Maryland

Dowell Road Widening Informational Public Meeting November 14, 2011

Dowell Road Widening Purpose of the Public Meeting: Introduce Team Members Discuss Existing Conditions Discuss Proposed Improvements Discuss Current Project Status Explain the Next Steps

Existing Conditions: Two-lane roadway section No pedestrian or bicycle accommodations Existing roadway safety issues Substandard horizontal alignment Dowell Road Widening

Proposed Typical Roadway Section – Northern Section

Dowell Road Widening Proposed Typical Roadway Section – Southern Section

Dowell Road Widening Proposed Improvements: 0.9 miles of two new travel lanes One continuous 10-foot center turn lane from H.G. Truman Road to Ann Marie Gardens Entrance New curb and 5-foot sidewalk in both directions Two new 4-foot bicycle lanes within the Roadway Section Proposed drainage improvements Two new stormwater management facilities Improved turning radii at all cross roads Improved parking facilities at Grandmother’s Store

Dowell Road Widening Current Project Status: Project design has been performed to 90% completion. Current construction plans have been submitted to permitting agencies for review. Project is currently awaiting comments and/or approval.  Calvert Soil Conservation District  Chesapeake Bay Critical Area Commission Current Estimated Construction Cost : $4.4 Million, excluding right of way and utility costs.

Dowell Road Widening The Next Steps Begin right of way negotiations and acquisition Finalize permit acquisition Begin construction

Dowell Road Widening QUESTIONS?