Greening the Region Using Stormwater Infrastructure May 7, 2014 Jim Simmonds King County Water and Land Resources Division

Slides:



Advertisements
Similar presentations
Shingle Creek and West Mississippi Watershed Management Commissions Third Generation Watershed Management Plan.
Advertisements

Modeling to Support Green Infrastructure Planning Best Management Practice-Decision Support System (BMP-DSS) Application Andrew Parker Director, Water.
WHAT IS GREEN INFRASTRUCTURE ? Khris Dodson, Environmental Finance Center November 17, 2010.
Discussion Topics Brief history of structural stormwater management The Low Impact Development (LID) alternative to ponds, ponds, ponds… LID for Hydromodification.
U.S. Environmental Protection Agency Region 2 Green Infrastructure – Community Vision March 14, 2013 Ensuring safe and clean water for all Americans Ensuring.
Water Too Much or Too Little? Or a Little of Both? URS Group Inc ASFPM National Conference May 2010.
The DeepRoot Silva Cell Integrating Trees, Soil & Stormwater for Sustainable Development.
Simplified Sizing Tool for LID Practices in western Washington Alice Lancaster, PE Herrera Environmental Consultants.
LID and Stormwater Technical Resource Center Update County Road Administration Board November 3,
Development of a Stormwater Retrofit Plan for Water Resources Inventory Area (WRIA) 9 and Estimation of Costs for Retrofitting all Developed Lands of Puget.
Stakeholder Workshop #3 Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant April 25, 2013.
City of Kimball Stormwater Re-use Project Protecting our Water Resources – a Forum Series for Policy Makers March 30, 2011.
Western Washington Hydrology Model Version 3 Vancouver, WA, Workshop October 17, 2007 PM.
Storm Water Retrofitting Dan Bogoevski, Ohio EPA September 2011.
HYDROLOGIC COMPUTER MODELING Washington Hydrology Society March 2006 Joe Brascher, President Clear Creek Solutions, Inc.
Hydrologic Cycle and Watersheds. Hydrologic Cycle Components Precipitation Infiltration Percolation Runoff Evapotranspiration.
Western Washington Hydrology Model Version 3
Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.
A Clear Blue Future How Greening our Cities can Address Water Pollution, Water Supply, and Climate Change in the 21 st Century June 13, 2010.
Bernie Engel Purdue University. Low-Impact Development (LID) An approach to land development to mimic the pre-development site hydrology to: 1)Reduce.
SUSTAIN Pilot Study April 25, 2012 Curtis DeGasperi King County
Identification of King County Streams with Declining Summer Flows Curtis DeGasperi, King.
Bill Eyring – CNT Senior Engineer Illinois Sustainable Technology Center September 29, 2010 Monitoring and Documenting Green Stormwater Best Management.
Nutrient Management in the Urban Landscape Rebecca Kluckhohn, P.E. Watershed Engineer West Metro Water Alliance Forum, May 18 th 2011 W W e n c k Engineers.
STEP 3: SITING AND SIZING STORM WATER CONTROLS Section 6.
Background and Overview Stormwater NPDES Compliance For New Developments.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
WRIA 8 Status and Trends Monitoring ( ) Hans B. Berge, Dan Lantz, Scott Stolnack, and Curtis DeGasperi King County Department of Natural Resources.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Bernie Engel, Larry Theller, James Hunter Purdue University.
NCPPP Connect 2015 Seth Brown Storm & Stream Solutions, LLC Founder, Principal EPA Region III Contractor July 22, 2015 Boston, MA.
Southeast Michigan Watersheds SEMCOG Office February 10, 2015 Detroit, MI Green Infrastructure Target Setting Pilot Project.
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
Trends in Summer Low Flows in King County Rivers and Streams: How Low Will They Go? Curtis DeGasperi King County DNRP, WLRD Salish Sea Ecosystem Conference.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
PSGB Ecosystem Conference The Effectiveness of LIDs in Reducing Stormwater Runoff February 9, 2009 Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
LOW IMPACT DEVELOPMENT APPROACHES
Effective Post-Construction Stormwater Management Mike Novotney, P.E. (MD) Center for Watershed Protection Ronald Feldner, P.E. Ecological Solutions, Inc.
Institute of Water Research L-THIA LID Overview July 10, L-THIA LID Component Bernie Engel, Larry Theller Y.S. Park, T. Wright.
Western Washington Hydrology Model 2005 AWRA Annual Conference Doug Beyerlein, P.E. Joe Brascher Shanon White Clear Creek Solutions, Inc.
Beach Contamination Source Identification Techniques: Physical Characteristics of the Beach and Surrounding Watershed Door County Soil and Water Conservation.
URBAN STORMWATER: A PERFECT STORM FOR CHANGE Jon M. Capacasa Director, Water Protection Division EPA Region III.
1 Lake Ballinger and McAleer Creek Watershed Strategic Action Plan Forum Briefing #2 January 27, 2009.
EPA HWI Comments on CA Assessment June 26, 2013 HSP Call 2 major categories of comments: – Report writing (we will work on this) – Content/Analysis/Discussion.
Kitsap County Department of Public Works CRAB – November 04, 2015 Bioretention Stormwater BMP Benson Burleson Design Engineer
Clear Creek Solutions, Inc. LID Hydrology and Hydraulics Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
BASIN SCALE WATER INFRASTRUCTURE INVESTMENT EVALUATION CONSIDERING CLIMATE RISK Yasir Kaheil Upmanu Lall C OLUMBIA W ATER C ENTER : Global Water Sustainability.
ASCE LID Conference LID Analysis Considerations in Western Washington November 17, 2008 Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
Jeff Burkey King County Department of Natural Resources and Parks November 4, 2015.
WWHM3 LID Stormwater Modeling Snohomish County August 2006 Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
STORM-WATER OPPERTUNITIES What is storm water Land use and change Retain and Detain Opportunities for change.
STORM WATER SOLUTIONS FOR EXISTING URBAN AREAS: IDENTIFYING SITES TO MAXIMIZE RESULTS Jared Bartley, Cuyahoga SWCD September 8, 2011.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
GIS M ETHODOLOGY Swearing Creek Watershed Restoration Plan 8/26/2015 Piedmont Triad Regional Council.
Stormwater Management
GREEN STREETS | GREEN JOBS | GREEN TOWNS INITIATIVE
SPU Modeling & Monitoring
L-THIA Online and LID in a watershed investigation
L-THIA Online and LID Larry Theller
Liana Prudencio and Sarah E. Null
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
Building Cities in the Rain:
Stormwater Control Transfer Program Overview January 31, 2018
Understanding the State’s Accounting for Growth Policy
Northern California LID Hydrology and Hydraulics
Tackling Stormwater Runoff in Puget Sound
Alternative Compliance for New Developments
Presentation transcript:

Greening the Region Using Stormwater Infrastructure May 7, 2014 Jim Simmonds King County Water and Land Resources Division 5/7/20141

Stormwater Paradigm Time PeriodParadigmDescription Prior to 1992Drainage Efficiency Convey water downhill as efficiently as possible 1992 – 2013Reduce New Impacts Reduce harm from new construction with flow control and treatment FutureReduce New and Existing Impacts Capture, infiltrate, detain, and treat stormwater everywhere to protect and rehabilitate receiving waters 5/7/20142

Parcels Built Before Stormwater Controls Required About three-fourths of urban lands lack stormwater facilities 5/7/20143

Stormwater Retrofit Examples 5/7/2014 Ponds Bioswales Check Dams Cisterns Pervious Pavement Rain Gardens Green Roofs 4

Estimated Stormwater Needs  $3B - $15B for treatment in Puget Sound Capital costs, no O&M, no land costs Capital costs, no O&M, no land costs  $1.4B for Juanita Creek basin (7 sq miles) Full lifecycle cost Full lifecycle cost  $1.1B for 64 small basins in unincorporated King County Full lifecycle costs Full lifecycle costs 5/7/20145

Stormwater Retrofit Planning for WRIA 9  $1M grant from EPA, $335K match  4 years  Model stormwater retrofit needs in WRIA 9  Work with stakeholders  Present retrofit options analysis to WRIA 9 Watershed Ecosystem Forum  Extrapolate cost estimates to all Puget Sound 5/7/20146

Project Benefits  Planning-level estimate of facility and funding needs  Cost vs stream improvement  Demonstrate use of modeling tools  Influence capital project planning  Influence future NPDES permits  Influence discussion on new funding 5/7/20147

Approach  Gather geospatial data about existing stormwater facilities, soil, precipitation patterns, slope, impervious area, development type, land costs, stream channels existing stormwater facilities, soil, precipitation patterns, slope, impervious area, development type, land costs, stream channels  Conduct hydrologic modeling  Model hydrologic improvements with stormwater facilities 5/7/20148

Future Development 2007 Satellite-Derived Land Use (UW 2007) 2040 Simulated Land Use (Alberti 2009) 5/7/20149

SUSTAIN: System for Urban Stormwater Treatment and INtegration 5/7/201410

Modeling Approach  Study area: 278 mi 2, 446 catchments  Model 135 hypothetical 100-acre catchments representing combinations of: 5 generic land uses 5 generic land uses 3 soil types 3 soil types 2 slopes 2 slopes 3 precipitation zones 3 precipitation zones 2 land costs 2 land costs 5/7/201411

SUSTAIN Optimization Target: Reduce Stream Flashiness High Pulse Count: Number of times mean daily flows ≥ high- flow threshold set at 2 X long-term mean daily flow rate 5/7/201412

High Pulse Count and Biology 5/7/ Biological ConditionB-IBI Range Excellent46 – 50 Good38 – 44 Fair28 – 36 Poor18 – 26 Very Poor10 – 16

Addressing Redevelopment  Redevelopment improves stormwater management  Nearly ½ of project area to have new or re development by 2040  More expected beyond 2040  Decreases estimated need 5/7/201414

Addressing Climate Change  Three approaches for assessing impacts Analysis of precipitation patterns for downscaled global climate model output Analysis of precipitation patterns for downscaled global climate model output Impacts of climate change on hypothetical pond sizing Impacts of climate change on hypothetical pond sizing Impacts of climate change on high pulse count in hypothetical basin Impacts of climate change on high pulse count in hypothetical basin  Likely need about 10% more flow control, but model variability is large 5/7/201415

2040 Potential B-IBI Scores No Stormwater Management Full Stormwater Management 5/7/201416

Policy and Planning Horizon are Everything  How stringent are stormwater requirements for redevelopment?  How aggressively do public programs build facilities?  How long in the future do we aim for success? 5/7/201417

What If?  Assume new and redevelopment builds on-site facilities and developers contributes funds to build off-site facilities (ponds)  Assume public funds used to build everything else  Assume all stormwater facilities built within either 30 years 5/7/201418

Annual Public Costs CapitalOperation and Maintenance Inspection and Enforcement New and Re- Development $88M$4M$320M Roads and Highways $21M$19M$28M Everything Else $98M$89M$170M Total$207M$112M$518M 5/7/201419

The Big Questions  How quickly do we want to improve stream flows and water quality?  To what degree do we want to improve stream flows and water quality?  Where does capital funding come from?  Where does operating funding come from? 5/7/201420

Project Team  Don Robinett, SeaTac  Ben Parrish, Covington  Chris Thorn, Auburn  Jeff, Burkey, Curtis DeGasperi, David Funke, Larry Jones, Chris Knudson, Beth leDoux, Doug Navetski, Elissa Ostergaard, Giles Pettifor, Dan Smith, Allison Vasallo, Mark Wilgus, Olivia Wright, King County  Rich Horner, Erkan Istanbullouglu, UW  Ed O’Brien, Mindy Roberts, Ecology  Dino Marshalonis, Michelle Wilcox, EPA  Tamie Kellogg, Kellogg Consulting 5/7/201421