1 News and Miscellaneous UPO May 17 2013 Didier Contardo, Jeff Spalding -Phase 2 Scope and Cost exercise.

Slides:



Advertisements
Similar presentations
CMS Upgrade Issues LHCC 1 July July 20081J. Nash - CMS Ugrades.
Advertisements

13-Feb-2014 Phase 2 upgrade “ME0 stack options” J. Hauser, UCLA  In Shashlik and CFCAL HE designs, space of  z~30 cm exists behind 10 lambda for muons.
O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, October 15, 2012 Trigger Performance and Strategy Working Group Trigger Performance and Strategy.
O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, UPO Meeting, July 6, 2012 Trigger Performance and Strategy Working Group Trigger Performance.
CMS Phase 2 Upgrade: Scope and R&D goals CMS Phase 2 Upgrade: Scope and R&D goals October 21, 2014 Jeremiah Mans On behalf of the CMS Collaboration.
Upgrading the CMS simulation and reconstruction David J Lange LLNL April CHEP 2015D. Lange.
“GLD” Detector Concept Study 21. Mar. Y. Sugimoto KEK.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, August 3, 2012 Trigger Performance and Strategy Working Group Trigger Performance and Strategy.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
The CMS Upgrade Program ECFA High Luminosity LHC Experiments Workshop Aix-les-Bains, October 1, 2013 J. Spalding, on behalf of the CMS Collaboration 1.
1 News and Miscellaneous UPO Mar Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Reviews o Document to RRB o DESY week.
T. Kawamoto1 Small Wheel upgrade project Muon week, upgrade meeting T. Kawamoto.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Roger Rusack – The University of Minnesota 1.
ATLAS muon endcap 1 layer of tracking chambers (MDT) 3 layers of trigger chambers (TGC) which we are working on ATLAS TGC installation and commissioning.
SLHC SG: ATLAS Pixel G. Darbo - INFN / Genova SLHC SG, July 2004 ATLAS Pixel at SLHC G. Darbo - INFN / Genova Talk overview: A table with different High.
HEP 2005 WorkShop, Thessaloniki April, 21 st – 24 th 2005 Efstathios (Stathis) Stefanidis Studies on the High.
Il Trigger di Alto Livello di CMS N. Amapane – CERN Workshop su Monte Carlo, la Fisica e le simulazioni a LHC Frascati, 25 Ottobre 2006.
News from DESY. Joachim Mnich Plenary ECFA CERN November 20, 2014 XFEL PETRA III & FLASH II Particle Physics DESY Test beam.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
CMS Phase II Trigger and L1 menu Trigger, Online and Offline Computing Workshop Sep 4 and 5 at CERN O. Buchmueller Imperial College London.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
C. F. Bedoya. C. F. Bedoya May 13th, * The goal was to establish a baseline plan for DT in Phase 2, (although some aspects of phase 1 also needed.
1 News and Miscellaneous UPO Mar Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Cost scale for phase 2 o June Upgrade.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
25-Oct-2013 Upgrades Week “Muon plans for the Phase 2 TP” J. Hauser, UCLA  Phase 2 muon plans (presented at ECFA),  What’s new since Upgrade Week  New.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
P. Dupieux (ALICE), A. Cardini (LHCb) M. Abbrescia, K. Hoepfner, A. Safonov (CMS) Ch. Amelung, O. Kortner, S. Veneziano (ATLAS) 4t meeting with the HL-LHC.
1 News and Miscellaneous UPO Apr Didier Contardo, Jeff Spalding News from Oct. RRB HL-LHC Pile-up for simulation Upcoming events: DESY week – Taipei.
11/18/2016 Test beam studies of the W-Si tracking calorimeter for the PHENIX forward upgrade Y. Kwon, Yonsei Univ., PHENIX.
Software Tools for Layout Optimization (Fermilab) Software Tools for Layout Optimization Harry Cheung (Fermilab) For the Tracker Upgrade Simulations Working.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
+ GE2/1 Case Considerations Alexei Safonov. + CMS Muon Upgrades CMS Technical Proposal in its part related to muon systems lists following: MEX/1 electronics.
Fabiola Gianotti, 14/10/20031  s = 28 TeV upgrade L = upgrade “SLHC = Super-LHC” vs Question : do we want to consider also the energy upgrade option.
1 Towards Phase 2 TP releases 2013 Didier Contardo, Jeff Spalding Status of current simulations studies and ongoing issues Needs for TP preparation.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
News and Miscellaneous UPO Nov Didier Contardo, Jeff Spalding 1 UPO Nov L1-Trigger TDRs -Upcoming Proposals for Phase 1 -CMS week Dec.
Eunil Won/Korea U1 A study of configuration for silicon based Intermediate Trackers (IT) July Eunil Won Korea University.
27-Jan-2014 Upgrade Steering Group “Update on Phase 2 TP - muons” J. Hauser, UCLA  Update on progress for TP:  2 slides follow to be shown at USG02 (Upgrade.
Technology and R&D Summary and next steps Burkhard Schmidt.
1 CMS Upgrades LHC France 06/04/2013 D. Contardo IPN Lyon CNRS/IN2P3 o Overall upgrade plans and schedules o CMS projects during LS1 o Upgrades for LIU.
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
Introduction to L1Calo Upgrade L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
Ideas and Plans towards CMS Software and Computing for Phase 2 Maria Girone, David Lange for the CMS Offline and Computing group April
News and Miscellaneous Didier Contardo, Jeff Spalding UPO August 03/ UPO 08/03/12.
Straw man layout for ATLAS ID for SLHC
News and Misc UPO Meeting Jan 16, 2012
UPO meeting Nov. 29, 2013 D. Contardo, J. Spalding News
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Third Workshop on GEMs for CMS
CMS Upgrade Project Office Meeting
ATLAS L1Calo Phase2 Upgrade
TK Upgrade report.
Not baseline: ASIC, DCFEB R&D if L1A latency > 10 ms
The Compact Muon Solenoid Detector
Francesco Forti University and INFN, Pisa
Anna Colaleo - INFN-Bari On behalf of the CMS Muon group
Preparation of the CLAS12 First Experiment Status and Time-Line
ILC Detector Technology
Project Presentations August 5th, 2004
SLHC Non-Inner Detector Upgrades
Presentation transcript:

1 News and Miscellaneous UPO May Didier Contardo, Jeff Spalding -Phase 2 Scope and Cost exercise

Extend pixel eta range is an option Precision timing added to new calorimetry is an option under consideration, depends on studies and R&D L1 Trigger Upgrade Track-Trigger Push/Pull Track Trigger Long Barrel Barrel+ EndCap EE/EB FE 10µs 500kHz CSC DCFBB 20µs 500kHz DT ROB/ROS 20µs 1MHz New Tracker (silicon and pixels) Endcap/Forward Calorimeters New EE Extend HE longevity: similar or new active elements - same absorber - can increase granularity Retrofit HFNew HF Extending muon eta range is an option New EE and HE - new absorber - extend eta range Overall Upgrade Branches and Options considered for phase 2 2 Muons Complete 1.6<eta<2.4 with GEM/GRPC

Extend pixel eta range is an option Precision timing added to new calorimetry is an option under consideration, depends on studies and R&D L1 Trigger Upgrade Track-Trigger Push Track Trigger Long Barrel Barrel+ EndCap New Tracker (silicon and pixels) Endcap/Forward Calorimeters New EE Extend HE longevity: similar or new active elements - same absorber - can increase granularity Retrofit HFNew HF Extending muon eta range is an option New EE and HE - new absorber - extend eta range Scenario 0 and options: No increase in L1 rate and latency 3 Muons Complete 1.6<eta<2.4 with GEM/GRPC Concerns: Trigger entirely dependent on Track Trigger (is this enough?) FE electronics must operate past 2035 Need to demonstrate Track trigger < 6.4 µs - all forward detector options

Extend pixel eta range is an option Precision timing added to new calorimetry is an option under consideration, depends on studies and R&D L1 Trigger Upgrade Track-Trigger Push/Pull Track Trigger Long Barrel Barrel+ EndCap EE/EB FE 10µs 500kHz CSC DCFBB 20µs 500kHz DT ROB/ROS 20µs 1MHz New Tracker (silicon and pixels) Endcap/Forward Calorimeters New EE Extend HE longevity: similar or new active elements - same absorber - can increase granularity Retrofit HFNew HF Scenario 1 and options: Increase L1 Rate and latency 4 Muons Complete 1.6<eta<2.4 with GEM/GRPC -New EB electronics - New EE - extend longevity of HE/HF (cost optimization) -Option for pull trigger - new Muons electronics for further rate and latency increase …

Extend pixel eta range is an option Precision timing added to new calorimetry is an option under consideration, depends on studies and R&D L1 Trigger Upgrade Track-Trigger Push/Pull Track Trigger Long Barrel Barrel+ EndCap EE/EB FE 10µs 500kHz CSC DCFBB 20µs 500kHz DT ROB/ROS 20µs 1MHz Tracker Replacement (silicon and pixels) Endcap/Forward Calorimeters Extending muon eta range is an option Scenario 2 and options: also replace EE and HE extend eta range 5 Muons Complete forward with GEM/GRPC Replace EE and HE extend eta range -New EB electronics, new EE, new HE, enhanced performance in forward region -Option to extend muon coverage (also requires option for tracking at high η?)

Document on phase 2 cost and scope exercise o Internal document for July 29 MB/FB and then release to the collaboration – Baseline scenarios & options (with cost scales), plus targeted R&D and simulation studies – DESY week to motivate scenarios and options and to cut branches Physics motivation and detector requirements Detector longevity and sustainable integrated luminosity (LS3 delayed, staging) Feasibility of upgrades (Track trigger latency - retrofit of forward calorimeters…) include consideration on technologies, need for R&Ds and issues at P5 Simulation studies and preliminary performance results (narrow options include some in baseline scenarios?) Size of effort/resources needed Impact on shutdown plan/duration Cost estimate  Each Project, Working group, PC, TC & Cross-coordination should draft a few pages on these points by the end of DESY week- to form the basis for the document  DESY week will be summarized at the following WGM for the collaboration o Simulation studies: – Goal for preliminary performance results by the ECFA workshop in Oct. Further motivate scenarios and options (define priorities) o Document for the RRB to the MB in Sept. 6