SURFACE NOISE CONTROLS. Source Path Receiver NOISE EXPOSURE CAN BE REDUCED BY:  APPLYING CONTROLS TO THE SOURCE (S)  BLOCKING THE PATH (S)  ENCLOSING.

Slides:



Advertisements
Similar presentations
OCCUPATIONAL NOISE.
Advertisements

AMERICAS TOTAL NOISE CONTROL COMPANY Sound pressure is measured in a unit called decibels and is often abbreviated dB. Zero decibels is the lowest sound.
Noise in Road Construction Developed by the Division of Occupational Safety and Health (DOSH) August, 2009.
Making Work Zones Work Better Effective Noise Control During Nighttime Construction.
Controlling Lead-Based Paint Hazards Chapter 5 Lead Abatement for Workers Course.
Work Health and Safety Section 6 ICA11v1.0
NOISE CONTROLS FOR PLANTS AND MILLS. SOURCE PATH RECEIVER.
1293 Airport Road Beaver, WV Phone: (304) Fax: (304) Crane Safety Vincent J. Giblin, General President.
Mobile Equipment Hazards
S I L I C A HAZARDS & CONTROLS. What are the hazards associated with exposure to silica dust, as well as basic preventive and control measures.
The Safe Use of Work Equipment. Overview This training tool is dedicated to work equipment and their associated hazards. Work equipment means any machinery,
HEARING CONSERVATION PROGRAM. REFERENCES 29 CFR
Noise Control Practices in the Workplace STEP Network Meeting August 17, 2005.
MAINTENANCE OF TECHNOLOGICAL NOISE CONTROLS. TECHNOLOGICAL NOISE CONTROLS:  ARE DESIGNED AND INSTALLED TO PROTECT YOUR HEARING  MUST BE PROPERLY SELECTED.
SLOPE & SHAFT SINKING TEAM NOISE PROJECT. PROJECT TYPES ShaftsShafts –Conventional Drill, Blast, Muck or Clam-Shell –Drill - Either Raise-Bore or Blind-Drill.
J. N. DenenbergActive Noise Cancellation1 NOISE CANCELLATION INTRODUCTION TECHNOLOGY APPLICATIONS DEMONSTRATION.
/0403 Copyright © 2004 Business & Legal Reports, Inc. BLR’s Safety Training Presentations Metalworking Fluids.
Vibro-Acoustics Consortium
HOT WORK PROCEDURES Welding and Hot Work, such as brazing or grinding present a significant opportunity for fire and injury. CCR Title 8 Sub Chapter 7,
Chapter 17 Maintaining Your Vehicle Start working on the 8 questions on page 363 Start working on the 8 questions on page 363 Get your Study Hall Form.
Most Frequently Cited Serious Violations Construction – FY 2008.
Construction Noise.
 Review Alpena Biorefinery Hearing Conservation Program  Types of Hearing Protection Devices Employee Safety Training
29 CFR (f)(4); or 29 CFR (f)(5)(v); or 29 CFR (a)(3)(i)
A common wall between the zones Zone 1 with four walls and four windows Zone 2 with four walls and four windows An example of a model with two zones.
Personal Protective Equipment (PPE) Awareness Training S afety A wareness F or E veryone from Cove Risk Services.
Eliminating and Controlling Dust & Noise Hazards July 2002.
Safety & Health in the Work Environment
Bridge Engineering Section Bridge Rehabilitation.
TEAM UP! FOR FAN AND PUMP SAVINGS It can be as easy as replacing an old drive belt.
Noise Control A Guide for Workers and Employers. Steps used to solve Noise Control Problems Define the problem Establish a noise reduction target Determine.
1 Camshaft Locations 1) Cam-in-block: dated technology (but still widely used) dated technology (but still widely used) more moving parts more moving parts.
Personal Protective Equipment and Programs Section D of the Forest Activities code.
Bloodborne Pathogens HBV HCV HIV Blood and body fluids containing visible blood.
Noise Control In Highway Construction Kwangseog Ahn, MS and Susan Moir, MS Department of Work Environment University of Massachusetts Lowell
Most Frequently Cited Serious Violations Construction – FY 2009 OSHA Federal Standards October 1, 2008 – September 30, 2009.
A procedure for controlling risks 1 st step – to eliminate and identify hazards 2 nd step – to rank the risk associated with the hazards 3 rd step – to.
Overview of TFTR D&D Hazards Jerry Levine Head, Environment, Safety & Health.
Sound Reduction 793C XQ Mining Truck Jim Humphrey– Global Mining.
Noise in Road Construction. What this presentation covers Hearing loss rates and claims facts Noise levels of construction equipment Control methods to.
Most Frequently Cited Serious Violations Construction – FY 2007.
NOISE CONTROLS FOR UNDERGROUND MINING. SOURCE PATH RECEIVER.
Most Frequently Cited Serious Violations Construction 2000.
Power Plant Construction and QA/QC Section 9.5 – Power Plant Noise and its Control Engineering Technology Division.
Thursday Turn in 2.3 Notes 2.4 Notes Egg vs Pop. Your Sense of Hearing.
29 CFR Subpart G Related Terminal Operations and Equipment.
MAINTENANCE INTERVAL SCHEDULE D6R TRACK TYPE TRACTOR 7AR EVERY 10 SERVICE HOURS OR DAILY.
Conveyors. Conveyor Hazards  Pinch points  Fall of person  Falling material  Fire  Electrocution  Slip/trip/fall  Strains/sprains.
30 CFR Part 56 Safety Jeopardy! Up in Smoke Grab- Bag Watch Your Step We’ve got your back Guard-ian Angel.
A roof is an essential component of any building. It is the roof that protects the building from extreme climates such as rain, snowfall and wind. It.
Independent Evaluator Services   Contract Requires a Baseline Evaluation   Assets are either Equipment or Structures   Est. Replacement Value to.
INVENTORY AND INSPECTION FOR GAS TURBINE COMPONENTS( GT22)
ENGLISH 2 MODUL IV TEKNIK INDUSTRI
Personal Protective Equipment (PPE) Awareness Training
DON’T GET CARRIED AWAY WORKING AROUND CONVEYOR BELTS
Global Exotics Board Replacement
How To Give Your Truck A Roaring Sound
Most Frequently Cited Serious Violations
S I L I C A HAZARDS & CONTROLS.
Motorcycle Exhaust System
What are the Common Engine Oil Leak Locations
Most Frequently Cited Serious Violations
Making Work Zones Work Better
Personal Protective Equipment (PPE) Awareness Training
Most Frequently Cited Serious Violations
Board Replacement for Engineered Glue-Down Hardwood Floors
Most Frequently Cited Serious Violations
Application Presentation
10 DAY PUBLIC NOTICE: Water Main
Pneumatic tools IR Range Overview Welcome remarks TBD. 01/12/06.
Presentation transcript:

SURFACE NOISE CONTROLS

Source Path Receiver

NOISE EXPOSURE CAN BE REDUCED BY:  APPLYING CONTROLS TO THE SOURCE (S)  BLOCKING THE PATH (S)  ENCLOSING THE RECEIVER

BARRIERS ON DRILL MASTS

DRILL EXHAUST MUFFLERS

HAMMER COVERS Conveyor Belting Over a Hammer

DrillBarrier Shadow Zone Operator

HOMEMADE BARRIERS FOR DRILL OPERATORS

THREE SIDED ENCLOSURE

OPERATOR CONSTRUCTED CABS

Former Farm Equipment Cab Converted To A Portable Crusher Booth

Original Equipment Manufacturers Cabs

OPERATOR & HELPER CABS CABS

INTERIOR RETROFIT

FLOOR TREATMENT VIBRATION DAMPING ACOUSTICAL FLOORMAT FLOOR TREATMENT VIBRATION DAMPING ACOUSTICAL FLOORMAT

AFTER MARKET SKIN KIT

THE HOPPER IS MONITORED FROM THE CONTROL BOOTH Camera

OPERATOR CONSTRUCTED ENGINE COVER

Maintain Your Noise Controls  Exhaust components should be inspected and repaired when needed  Barriers should be cleaned and inspected  Acoustical materials should be replaced when worn or removed for servicing  Cabs or booths should be maintained  Engine covers should remain on when in use

Additional Resources

Your children can whisper to you now, Don’t make them shout at you in the future