Wir schaffen Wissen – heute für morgen Do you believe in Operation Statistics? Presented at the Accelerator Reliability Workshop 2011 Andreas Lüdeke Paul.

Slides:



Advertisements
Similar presentations
Wir schaffen Wissen – heute für morgen A.C.Mezger, Paul Scherrer Institut, Switzerland caQtDM, an EPICS display manager with Qt Paul Scherrer Institut.
Advertisements

Slide: 1 Welcome to the workshop ESRFUP-WP7 User Single Entry Point.
Wir schaffen Wissen – heute für morgen 5. Mai 2015PSI,5. Mai 2015PSI, Paul Scherrer Institut Polonium Evaporation Studies from Liquid Metal Spallation.
Manchester University and the Cockcroft Institute Roger Barlow Technologies manchester.ac.uk Accelerators for ADSRs An account of the requirements.
F. Fernandez 28/10/ Ferran Fernandez WAO2014 Operators training experience at the ALBA synchrotron light source.
CW neutron source Benjamin Cheymol, Angel Jesus Romero Serrano, Jesus Alonso, Lali Tchelidze 6/30/11 Benjamin Cheymol, Angel Jesus Romero Serrano, Jesus.
Wir schaffen Wissen – heute für morgen Babak Kalantari, PSI MRF workshop, Prague, Eli Beamlines Paul Scherrer Institut SwissFEL Timing System.
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut Controls tools for operation management at the Swiss Light Source at the EPICS collaboration.
Wir schaffen Wissen – heute für morgen June 11, 2015PSI,June 11, 2015PSI, Paul Scherrer Institut Modular High Bandwidth Data Acquisition System With Gigabit.
FFAG Fixed Field Alternating Gradient synchrotrons, FFAGs, combine some of the main advantages of both cyclotrons and synchrotrons:  Fixed magnetic field.
The High Intensity Proton Accelerator of the Paul Scherrer Institute.
WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.
8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 1 G.Penco, M.Svandrlik Operation Uptime Maintenance Performance vs filling.
Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Large Research Facilities Status SLS, Proton Facility, PROSCAN, PSI-XFEL.
PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach.
DESY: From High Energy Physics to Synchrotron Radiation Accelerator Operation in a changing Environment Michael Bieler DESY: From High Energy Physics to.
ISIS operational update David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC DL-RAL Joint Accelerator Workshop, RAL.
Converting PROSCAN CS to EPICS Status Damir Anicic, Paul Scherrer Institute, Villigen, Switzerland For EPICS collaboration meeting 2008, Shanghai,
3rd Libera Users Meeting
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
February 2010 ALBA Synchrotron Light Source Francis Perez.
Wir schaffen Wissen – heute für morgen Electronic Logbooks Revisited Paul Scherrer Institute Andreas Lüdeke Presented at the ARW 2011.
Open Question: Should Fermilab consider joining the effort on R&D for Accelerator based Transmutation of nuclear Waste (ATW) Paul Lebrun - FNAL ● Context.
Definition: Automation is the use of control systems for operating equipment with minimal or reduced human intervention. + save labour + reproducibility.
Paul Scherrer Institut
THE DIGITAL REVOLUTION. Wir schaffen Wissen – heute für morgen 15. Apr. 2013PSI, Paul Scherrer Institut The fully digital PSI accelerator control room.
Wir schaffen Wissen – heute für morgen Babak Kalantari, PSI MRF workshop, Prague, Eli Beamlines Paul Scherrer Institut Synchronous DAQ using.
Operational experience of high-power RF at Diamond Light Source
R. Krempaska, October, 2013 Wir schaffen Wissen – heute für morgen Controls Security at PSI Current Status R. Krempaska, A. Bertrand, C. Higgs, R. Kapeller,
Slide: 1 MORE THAN 50 SYNCHROTRON LIGHT SOURCES AROUND THE WORLD APS SPRING 8 ESRF AMMW2013 I. LECONTE – P. ROUSSELY – OPERATION Group.
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut Timo Korhonen Improvements to Indexing Tool (Channel Archiver) ‏ EPICS Meeting, BNL 2010.
Bad Zurzach, 1-4 December 2014 Stéphane Sanfilippo p. 1 Stéphane Sanfilippo, Paul Scherrer Institut Accelerator activities at PSI Wir schaffen Wissen –
The machine status and operating mechanism of BEPCII CAO, Jianshe Institute of High Energy Physics, CAS April 16, 2013 The 4th Accelerator.
ARW 2013 Opening Melbourne, Australia, 15 April 2013 Dr Mark Boland Principal Scientist Accelerator Physics Australian Synchrotron ACAS Deputy Director.
Wir schaffen Wissen – heute für morgen PSI, March 2013 Paul Scherrer Institut PSI / DESY / KIT Mini-Workshop on Longitudinal Diagnostics for FELs.
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut Introduction du PSI Workshop Precision Particle Physics Prof. Dr Joël Mesot.
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut Synchrotron Light Sources at the Paul Scherrer Institute at the 20th ESLS workshop at BESSY.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: RF system group Paolo Craievich :: RF Section :: Paul Scherrer Institut SwissFEL.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Transition to user operation Didier Voulot :: Paul Scherrer Institut SwissFEL Commissioning Workshop, 22 March2016.
Tailoring the ESS Reliability and Availability needs to satisfy the users Enric Bargalló WAO October 27, 2014.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Intra Pulse Phase Control Manuel Brönnimann :: Paul Scherrer Institut LLRF Workshop 2015.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: Low Level RF system group Thomas Schilcher :: Paul Scherrer Institut SwissFEL.
Andreas Lüdeke, Trieste, 24. Sep., WAO '07 Operation Information Management at the Swiss Light Source Andreas Lüdeke of the Swiss Light Source at the Paul.
Montse Pont ARW 2013 Operation and Reliability at ALBA Montse Pont.
ISIS operational update
umbrellaID: Shibboleth 3 and Attribute Authority
The LEP Superconducting RF system has reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons in In 2000, this system,
CALIPSOplus JRA2 Kickoff: Task 6 – Authentication + Identity
PETRA III, Status and Upgrade
umbrellaID: New Website
Budget JRA2 Beneficiaries Description TOT Costs incl travel
Do you believe in Operation Statistics
SNS Status Report Karen S. White 10/15/08.
MPE-PE Section Meeting
Uppsala Commitment to ESS and FREIA Planning
M. Calvi & Th. Schmidt :: Insertion Device :: Paul Scherrer Institut
GFA Controls IT Alain Bertrand
LIPAc Control System Reliability improvements
Steps towards beam commissioning: Magnet power supplies
Analysis Software for Neutron Imaging
Mirjam van Daalen, (Stephan Egli, Derek Feichtinger) :: Paul Scherrer Institut Status Report PSI PaNDaaS2 meeting Grenoble 6 – 7 July 2016.
PSI’s high intensity proton accelerator – an overview Mike Seidel, PSI
A Superconducting Proton/Electron Linac
Björn Erik Abt :: Paul Scherrer Institut
Mirjam van Daalen, (Stephan Egli, Derek Feichtinger) :: Paul Scherrer Institut Status Report PSI PaNDaaS2 meeting Grenoble 12 – 13 December 2016.
WELCOME TO SOLEIL Amor Nadji On behalf of Synchrotron SOLEIL
BEPCII Background Issues: Collimators and Masks
umbrellaID: OpenIRIS & Umbrella
Roger Ruber for the FREIA team 11 June 2013, Uppsala
Presentation transcript:

Wir schaffen Wissen – heute für morgen Do you believe in Operation Statistics? Presented at the Accelerator Reliability Workshop 2011 Andreas Lüdeke Paul Scherrer Institut

Paul Scherrer Institute (PSI), Switzerland PSI: Swiss national research center 1300 employees Proton facility: 1 MW cw beam – Spallation neutron source PSI West: Large Research Facilities Proscan SC cyclotron – Cancer therapy Swiss Light Source (SLS) – e - storage ring – 400mA, 2.4 GeV Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 1

Swiss Light Source Operation Swiss Light Source is In operation since 2001 A user facility with 19 beam-lines in operation Providing ~ 5000 hours beam to users per year Users need to apply for beam time Just 30% of the proposals are accepted Accepted users need to wait about 6 month for beam time One important metric to judge machine quality Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 2

3 rd Generation Synchrotron Light Sources: Availability Availability [%] Year Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 3

Availability: "Concours des Alpes" Availability [%] Year Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 4

Availability: "Concours des Alpes" Availability [%] Year Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 5

Metrics of the Swiss Light Source (SLS) Availability definition: “Delivered_Beam_Time” = “Beam_for_Users” during “User_Time” “User_Time" = “Scheduled_User_Time" + "User_Reserve_Time” Example for 2005: Uncompensated Availability Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 6

Elettra Metrics for Availability Thunderstorms are excluded from failure statistics at Elettra Example from 2005: Availability including outages from thunderstorms: Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 7

Availability: "Concours des Alpes” corrected Bare Availability [%] Year Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 8

Special Events: ESRF 2005 and the Crotch Absorber ● In March 2005 ― A water-to-vacuum leak ― Five days of user operation lost  120 hours downtime ● ESRF statistics 2005 ― Availability 97.6%, ― Total User Operation 5496 hours  131 hours downtime How can that be? ― All users of 5 days re-scheduled ― Not counted as downtime Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 9

What can we learn from this? ● Availability statistics not proportional to system reliability ● But large effort spend to compile downtime statistics ● Accurate failure data exists, but kept internal. Why? ● If that would be public, what could it be used for? Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 10

RF arcing at the Swiss Light Source Background SLS has 60 to 100 beam outages per year About 20 outages were caused by RF arcs Inquiry Asking around at the EPAC’08: “What is your experience with arc detectors?” Answer: arc detectors are often unreliable! Action We are replacing detectors with arc-coincidence detectors Result No arc interlock from any upgraded detector! Single diodes still show arcs, but do not cause interlocks Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 11 Conclusion We had in 10 years 200 unnecessary beam losses!

What can we do? Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 12 What we do now – We do your own mistakes – Sometimes we share selected insights during workshops What we should do – Learn from the failures of others – Create a database of all outages of many facilities! How to do that? – Define a simple document format – Provide a web-platform to publish downtime event data I’ll start, will you join? Participate in the Friday morning discussion!..

Acknowledgements My thanks to – Laurent Hardy, for not stopping me to use the example incident at the ESRF – Erhard Huttel, for sharing his experiences on RF arc detection