Supplier Development Kaizen Implementation Kit

Slides:



Advertisements
Similar presentations
Standardized Work Creating Continuous Flow
Advertisements

Total Productive Maintenance
Process Mapping. Why Flow Chart? To understand a process or system To (visually) depict all key steps in a process or system To compare existing and ‘ideal’
October 15, 2012 Jose Chavez Jr, Quality & Technical Services Engineer.
Chapter 14 Contemporary cost management. Cost management §Improvement of an organisation’s cost effectiveness through understanding and managing the real.
Modern Systems Analysis and Design Third Edition
MSE507 Lean Manufacturing
Material Handling Conventional. Operations Process (Flow) Chart Flow diagram is a plan of work area, indicating the position of machines, flow of materials.
IMPROVE Phase Consider these Improvement Initiatives! Six Sigma Simplicity.
Cellular Manufacturing and Plant Layout
Management is Essential
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
Chapter 6, Process-Flow Analysis
Value Stream Mapping.
Lean Training Standard Work. Agenda What is it? What’s it for? How does it work? When do you use it? What’s an example?
Process Improvement Strategies Takt Time Future State Value Stream Map
Session Pooja patnaik.
NORMA GOMEZ, MBA, MSN, RN, CNN Unique Challenges for the Nephrology Professional in Managing Change.
Lean Training through IMPLEMENTATION THE WORKSmart! DIFFERENCE.
How to Effectively Implement Set-up Reduction in Any Organization.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 8 Lean Systems McGraw-Hill/Irwin.
BASIC KAIZEN TOOLS TARGET PROGRESS REPORT STANDARDIZED WORK SHEET
Workshop A Performance Boosting Tools Reality Check: Are you a Lean, Mean Manufacturing Machine ? The Matrix: Performance Measurement System.
Perencanaan Produksi Harian Case #2 One Piece Flow Kuliah 4 LSiPro – FT Untirta Muhammad Adha Ilhami.
Ten Steps to Lean Production Steps to CIM 1.Re-engineer (revisit, replan) the manufacturing system Form U-cells to produce families of parts (clusters)
LEAN MANUFACTURING IMPLEMENTATION -- Lean Supply Chain
Greater Cincinnati Lean Improvement Consortium
Presented by: Beau Keyte, LEI Faculty APICS Greater Jacksonville Seminar December 5, 2002 Value Stream Mapping and Management.
Airbus Production System
LEAN TEAMS. Develop a Systematic process that consistently defines and solves problems utilizing Lean tools.
Continuous Improvement Story Cover Page The cover page is the title page Rapid Process Improvement Story Template O Graphics are optional This CI Story.
5S Workplace Audit Category Item Level Sort Store Shine Standardize
Quick Changeover/SMED Patrick Bye, President Dan Brook, General Manager 11/16/09.
Yellow Belt Training 10 Step Kaizen Process
“Without the Cost of Waste …”
Rapid Improvement Events Converting Philosophy to Action Original slides by Doug Fingles - MERC.
Freeleansite.com Kaizen (What is it ?) Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
1  Established in 1964  Located in Escondido, Ca Company Vision: To be the most dependable, diversified and efficient job shop, dedicated to unbeatable.
© 2009 BMA Inc. All rights reserved.  Capacity analysis provides an overview of how effectively you use time in each cell.  The time is categorized.
Process Characteristics
1 Lean Office - Pull Kanban, Just in Time, Standardized Work
Lean Production.
© BMA Inc All rights reserved. Decision Making.
5S and Visual We consider 5S and Visual Controls to be the foundation of Lean Manufacturing systems. 5S and Visual Controls are workplace organizational.
IT-465 Introduction to Lean part Two. IT-465 Lean Manufacturing2 Introduction Waste Walks and Spaghetti Charts Outcomes Understand what a waste walk is.
Standard Work (Sample Slides) Superfactory Manufacturing Excellence Series Lean Overview 5S & Visual Factory Cellular Manufacturing Jidoka Kaizen Poka.
© BMA Inc All rights reserved. Lean reporting & control Performance Measurements.
Manufacturing/Office Cells
1 Mix Model for Executives FMS 200 Series FBP-FMS288A.
Lean Manufacturing TT4290 L4S2. History of Manufacturing (1) Craft Manufacturing (2) Mass Manufacturing (3) Lean Manufacturing.
1 Observation of best / better practices The followings are “Some” of the best/better practices observed in the plant tour; Systems- House Lean to evaluate.
Value Stream Mapping The flow of your business from start to customer March 8, 2012.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
Enterprise / Production System Interface Expand Internally/Externally
Cellular Manufacturing and Plant Layout
Management is Essential
Management is Essential
Pull Manufacturing and Just In Time
Crafting Your Lean Transformation
LEAN ORGANIZATION SUMMARY
Enterprise Improvement LEAN Initiative Presentation
Name of Machine or Process Sub-title Name of Company
Value Stream Mapping (VSM) Training
Lean Healthcare Deployment and Sustainability Ch
Process Improvement Strategies Takt Time Future State Value Stream Map
Cellular Manufacturing and Plant Layout managementsupport
QE 107: Workshop Technology Section 5: Manufacturing Organisation
Work Measurement and Lean Application
Implementation of Lean at Rheem Manufacturing
LEAN PRODUCTION BY Alfredo Moran Johnny Rojas January, 2006.
Presentation transcript:

Supplier Development Kaizen Implementation Kit Rev. 3

Kaizen Implementation Kit Summary Kaizen Event Description Product Quantity Analysis Process Matrix Value Stream Map Takt Time Time Observations Operations and Operator Balance Charts Standard Work Combination Sheet Standard Work Sheet Capacity Study Setup Reduction Spaghetti Chart 5S Audit Machine Down Time Target Matrix Kaizen Newspaper Kaizen Principles Daily Outbrief Inbrief Presentation Outbrief Presentation Product Family Identification Tools Analysis and Improvement Tools Measures Communication

KAIZEN EVENT DESCRIPTION General overview of the Supplier Development process of conducting a Kaizen event. It includes an overview and description of the pre-event, the kaizen event week and the post event follow up. Please read the Kaizen Event Description before utilizing the Kaizen Kit tools and templates.

PRODUCT QUANTITY ANALYSIS Analyzes the relationship between products and quantity (production output). This will help evaluate the mix of products being produced. PROCESS MATRIX A Process Matrix will highlight which parts should be processed together in a cell and which parts should be reprocessed in order to match the flow of other parts.

VALUE STREAM MAP TAKT TIME Defines the flow of materials and information required to bring a product or service to a consumer and identify where there is waste in the process and help find ways to eliminate that waste. TAKT TIME Takt time is the pace of production required to meet customer demand. Since takt time is defined by the customer, it becomes a very important number in a lean environment and drives all floor shop decisions

OPERATIONS BALANCE CHART TIME OBSERVATION Calculates the standard time to complete each operation in a process. This time observation is then used to balance the line to meet Takt time. OPERATIONS BALANCE CHART Identifies the capacity of operations, opportunities for one piece flow, and the location for placement of standard work in process (SWIP) to maintain part flow. Identifies operations that may be combined and operations that do not meet TAKT time.

STANDARD WORK COMBINATION SHEET A form that visually charts the information from a time sheet observation. It provides a guide for the operator in the manufacturing of a part. It is used to illustrate the best combination of worker and machine. STANDARD WORK SHEET Graphically shows the pre-determined sequence of tasks for the best way to get the job done in the amount of time available (within takt time) while ensuring the job is done right the first time, every time.

CAPACITY STUDY SET UP REDUCTION Identifies process capacity limitations. This provides the baseline for improvement, primarily through waste reduction. SET UP REDUCTION Identifies waste, value add and tasks which may be done simultaneously and/or while the machine/process is in operation.

SPAGHETTI CHART 5S AUDIT Graphically illustrates the flow of product through the factory in an effort to highlight waste in the form of excess travel distance. 5S AUDIT Calculates the 5S score for manufacturing and office environments. Identifies the areas of improvement.

MACHINE DOWNTIME Identifies reasons and frequency of machine downtime and use this data to find corrective actions

TARGET MATRIX KAIZEN NEWSPAPER Identifies specific improvement targets during pre-Kaizen activities and track progress toward meeting the targets during the Kaizen event. KAIZEN NEWSPAPER Captures all the action items during a Kaizen event, assigns a person responsible to complete the open action item and sets target dates.

KAIZEN PRINCIPLES Used to assess a plant / factory / company on its adherence to Kaizen Principles that are key to Lean implementation.

DAILY OUTBRIEF INBRIEF PRESENTATION Shares daily successes and challenges with other groups and management during the pre-event and event. INBRIEF PRESENTATION Informs management, the Sensei and new team members of the opportunities identified during pre-event week and to establish the event week goals.

OUTBRIEF PRESENTATION Summarizes kaizen performance improvements achieved during event week and to identify future actions needed to fully realize event goals.