Principles of Managerial Accounting Chapter 10. Standard Costs Set to encourage efficient operations – management by exception. Quantity Standards A benchmark.

Slides:



Advertisements
Similar presentations
Standard Costs and Variances
Advertisements

Chapter 11 Standard Costs and Variance Analysis
CHAPTER 10 The Need for Standards Standards Are common in business They are often imposed by government agencies (and called regulations) Standard costs.
Standard Costing and Variance Analysis
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 10 Standard Costing, Operational Performance Measures,
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Eleven Standard Costs and the Balanced Scorecard.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA McGraw-Hill/Irwin.
Standard Costs and the Balanced Scorecard
Chapter 22 Cost Control Using Standard Costing and Variance Analysis
Managerial Accounting
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Standard Costs and the Balanced Scorecard Chapter Ten.
Standard Costs 11/16/04 Chapter 10. © The McGraw-Hill Companies, Inc., 2003 McGraw-Hill/Irwin Standard Costs Standard Costs are Predetermined. Used for.
Standard Costs Pertemuan 7. © The McGraw-Hill Companies, Inc., 2003 McGraw-Hill/Irwin Standard Costs Standard Costs are Predetermined. Used for planning.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Standard Costs and Variance Analysis Chapter Ten & Eleven.
Standard Costs and Balanced Scorecard
Standard Costs and Operating Performance Measures
Standard Costs and Operating Performance Measures.
CHAPTER 8 Performance Evaluation. The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-2 Learning Objective LO1 To describe flexible and static budgets.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
CHAPTER © jsnyderdesign / iStockphoto 6 PERFORMANCE EVALUATION VARIANCE ANALYSIS.
1 Module 22 Standard Costs and Variance Analysis.
Chapter 25-1 Chapter 25 Standard Costs and Balanced Scorecard Accounting Principles, Ninth Edition.
Standard Costs and Operating Performance Measures
Performance Evaluation Through Standard Costs
11-1 Islamic University of Gaza Managerial Accounting Standard Costs and Balanced Scorecard Chapter 6 Dr. Hisham Madi.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 24-1 STANDARD COST SYSTEMS Chapter 24.
© 2010 The McGraw-Hill Companies, Inc. Standard Costs and Operating Performance Measures Chapter 11.
McGraw-Hill /Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 8 Standard Costs.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
1 Chapter Eleven Standard Costs and Variance Analysis.
THE BUDGET PLAN FOR 4 TH QUARTER Sell in 4 th quarter: 70,000 pants 25,000 jerseys 9,000 award jackets Control inventory Manage cash.
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
Chapter 9 Standard Costing: A Functional-Based Control Approach
Chapter 10. Are standards the same as budgets? A standard is the expected cost for one unit. A budget is the expected cost for all units. Standards vs.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 10 Standard Costing, Operational Performance Measures,
Standard Costing System Chapter 4 Managerial Accounting Concepts and Empirical Evidence.
ACC3200 STANDARD COSTING.
9-1 Standard Costs Standards are benchmarks or “norms” for measuring performance. In managerial accounting, two types of standards are commonly used.
Chapter 10 Standard Costs and the Balanced Scorecard.
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Standard Costs and Variances
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Standard Cost Systems Chapter 23.
Direct Cost Variance and Management Control Lecture 17 1 Readings Chapter 10,Cost Accounting, Managerial Emphasis, 14 th edition by Horengren Chapter 5,
Chapter 8 © The McGraw-Hill Companies, Inc., 2007 McGraw-Hill /Irwin Standard Costs.
Chapter 17 Inventory & Control What we will cover: n Standard costs n Variance Analysis.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Ten Standard Costs and the Balanced Scorecard.
25-1 Both standards and budgets are predetermined costs, and both contribute to management planning and control. There is a difference:  A standard is.
8-1 PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright © 2016 by McGraw-Hill.
MANUFACTURING FIRMS USE STANDARD COSTS AND STANDARD QUANTITIES TO BUDGET FOR AND ANALYZE PRODUCTION Standard Cost Variance Analysis.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Cornerstones of Managerial Accounting, 5e
Standard Costs and Variances
Pertemuan 7 Standard Costs.
Standard Cost Chapter Eleven
Foundations and Evolutions
Standard Costs and Variances
Topic Six by Dr. Ong Tze San
Standard Cost Chapter Eleven
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Variance Analysis–A Tool for Cost Control and Performance Evaluation
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Standard Costs and Operating Performance Measures
Standard Costs and the Balanced Scorecard
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Presentation transcript:

Principles of Managerial Accounting Chapter 10

Standard Costs Set to encourage efficient operations – management by exception. Quantity Standards A benchmark to measure performance Direct Materials – units of raw materials Direct Labor – time to convert Cost Standards Identifies how much each unit of input should cost. (eg. unit of raw material standard cost compared to actual cost)

Setting Standard Costs Ideal standards – allow for no machine breakdowns or work interruptions, and require that workers operate at peak efficiency 100% of the time. Practical standards – Tight, but attainable. Allow for normal machine downtime and employee rest periods.

Setting direct material standards Standard price per unit for direct materials Reflect delivered cost of the materials, net of discounts Standard quantity of direct materials per unit of output. The amount of material going into each unit of finished product, many companies include an allowance for unavoidable waste.

Setting Direct Labor Standards Standard rate per hour of direct labor Includes hourly wages plus fringe benefits and other labor-related costs. Standard direct labor-hours per unit of output. Time allowed to complete a unit of product, includes allowance for coffee breaks, clean-up time and machine downtime.

Setting variable manufacturing overhead standards Usually expressed in terms of direct labor-hours or machine-hours.

Standards vs budgets Standards are generally expressed in a unit amount. Budgets generally reflect to total costs.

Variance Analysis A variance is the difference between standard prices or quantities and the actual prices or quantities. Price variance – the difference between the actual quantity of inputs at the actual price and the actual quantity of inputs at the standard price. Price (rate) variance = AQ (AP-SP) Or (AQ x AP) – (AQ x SP)

AQ = Actual quantity of inputs purchased (or used) AP = Actual price per unity of inputs purchased SP = Standard Price per unity of input SQ = Standard input allowed for the actual output

Variance analysis (cont) Quantity variance The difference between the actual quantity of inputs used at the standard price and the standard quantity of inputs allowed for the actual output at the standard price. Quantity (efficiency) variance = (AQ x SP) – (SQ x SP) or SP (AQ-SQ)

Responsibility for variances Materials price variance Generally the responsibility of the purchasing manager. Variance should be recognized immediately rather than wait until the materials are placed in production. Materials variance Generally the responsibility of the production manager, unless the inferior materials are purchased by the purchasing manager.

Responsibilities (cont) Labor rate variances: Production manager would be responsible for the mix of workers (lower vs higher paid employees) or overtime Labor efficiency variance: Causes – poorly trained workers, poorly motivated workers, poor quality materials which require more labor time or processing, faulty equipment, poor supervision Most often it is changes in demand for the product.

Variable overhead variances Spending variances when expressed in direct labor hours: Actual overhead cost – (Actual input hours x Variable overhead rate) Efficiency variance when expressed in terms of direct labor hours: (Actual hours – Standard hours allowed) x Variable overhead rate

Potential problems with using standard costs Usually prepared on a monthly basis rendering the information useless in many situations. Management may use an unfavorable variance as a “club” and morale may suffer. JIT strategy may be ignored to meet established standards. Meeting standards may over-ride other objectives eg. Improving quality, on-time delivery, customer satisfaction.

Characteristics of a balanced scorecard Scorecard should provide motivation and feedback for improving. Should emphasize continuous improvement rather than just meeting standards. Some of the performance measures may be non-financial which are usually better understood by employees. Scorecards should contain only those performance measure the individual (or department) can actually influence.

Internal business process performance measures Delivery cycle time – total elapsed time between when an order is placed and the product is shipped to the customer. Throughput (manufacturing cycle) time – total elapsed time between when an order is initiated into production and when it is shipped to the customer. Manufacturing cycle efficiency – the ratio of value-added time (process time) to total throughput time.

Assignment: Ex 3 Pr 10, 11, 12