Data QA/QC Techniques. Copyright 2009. VIM Technologies, Inc. All Rights Reserved. VIM’s 10-Step Program To Compliance Success 2.

Slides:



Advertisements
Similar presentations
An Indispensable Quality Assurance Tool for Dairy Processing Plants.
Advertisements

Quality Assurance Program
Configuration management
Sustainability Implementing Sustainable Practices for Productivity Enhancement for Productivity Enhancement Presented by Ryte Byte, Inc.
Common Monitoring and Reporting Errors Louis Nichols Clean Air Markets US EPA March 2007.
MONEY BUDGET ISSUES, REPORTING ISSUES, THE AUDIT PROCESS, ACCOUNTABILITY ISSUES.
Sunday Business Systems Asset Tracking Database Control Calibrated Equipment Manage Preventive Maintenance Maintenance Tracking.
Checking & Corrective Action
General Monitoring Requirements and Options
Harmonization of Part 60 and Part 75 CEM Requirements Robert Vollaro
Harmonization of Parts 60 and 75
Preventing and Resolving Reporting Errors Using Monitor Data Checking Software (MDC) Louis Nichols Clean Air Markets Division.
RECLAIM Monitoring, Recordkeeping and Reporting (MRR)
CEMTEK CEMS Users Group Meeting and Forum September 24-25, 2009 Santa Ana, California RKI Specific DAHS Training and RECLAIM Updates Presented by Norm Iseri, RKI Engineering.
1 Proposed Rule: Amendments to the Protocol Gas Verification Program and Minimum Competency Requirements for Air Emission Testing Presented at May 12,
Cornerstone Base Station for Calibration Management Applied System Technologies, Inc N.W. 53rd Street, Suite 101 Fort Lauderdale, Florida
HACCP Manager Software™
GRC SUMMIT 2013 Apr 30 - May 1, 2013 | Mandarin Oriental, Las Vegas, NV © MetricStream, Inc. |All Rights Reserved ENGAGE | INSPIRE | TRANSFORM GRC SUMMIT.
Louisiana Department of EnvironmentalQuality LDEQ CAM Plan Overview LDEQ’s 27 th Annual Conference on the Environment Cajundome Convention Center Lafayette,
Cornerstone Cal Station for Calibration Management Applied System Technologies, Inc N.W. 53rd Street, Suite 101 Fort Lauderdale, Florida
Quality Management System
Calibration (Qualification) of Centrifuge
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
The Quality Improvement Model
Permitting, Fees, and Reports Cal Poly Lecture Tour Ron Scholtz Analog Devices, Inc.
Chapter 10 Information Systems Controls for System Reliability—Part 3: Processing Integrity and Availability Copyright © 2012 Pearson Education, Inc.
Made in United States of America EMIT SIM emit.descoindustries.com Rev:
Simplex Time Recorder’s PayBay Attendance System Product Description Copyright © 2010 Simplex Time Recorder.
© Copyright, Yorke Engineering, LLC 2008 SCAQMD Rule Compliance Steps and Strategies Judy Yorke and Bipul K. Saraf Yorke Engineering, LLC
Clean Air Markets Program Data
Results you can rely on What Is New/Updated in Air Quality? TRC Companies, Inc. August 2011 TRC Companies, Inc. August 2011.
Production Planning Processes EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2012.
Basics of OHSAS Occupational Health & Safety Management System
Implementation of US Cap and Trade Programs
Presenter: CIWQS – eSMR Redesign Presenter: Amy Tong, Darrin Polhemus and Akin Babatola 1.
From Research Prototype to Production
February 2007 Commercial Vehicle Drivers Hours of Service Module 24: Daily Log Audits.
Conditions and Terms of Use
1 Introduction to TankWorks Product Scheduling and Inventory Management for Liquid Terminal Operations.
1 Dec. 8, 1997 LEADS Quality Assurance Summary Robert Brewer (512) Monitoring Operations Division Network QA Manager.
 Maintains the Instrument Database  Generates the Calibration Schedules  Maintains Calibration Records  Provides Facility to enter All types of.
New Form Approval Process. Background New Process is effective April 1, 2014 Changes Chapter 4 in the Library Manual (the reissued 2014 manual will be.
© 2013 Fluor. All Rights Reserved. Process Data in SmartPlant Instrumentation Fluor’s SmartPlant Implementation Initiative By: John Dressel.
| Philadelphia | Atlanta | Houston | Washington DC Boiler MACT Compliance Plans: Failure to Develop Plans Is Planning to Fail Susie Bowden|
Software you can depend on.. O&M Software: The Solution to Data Management Presented by: B.J. Yoder Technical Support Specialist AllMax Software, Inc.
PA Department of Environmental Protection Continuous Source Monitoring Manual (Manual, Revision 8)
Electronic Reporting Tool Software to Standardize Source Test Planning, Reporting and Assessment and Assessment Measurement Technology Workshop 12/8/2010.
1-1 System Development Process System development process – a set of activities, methods, best practices, deliverables, and automated tools that stakeholders.
Control Chart Methodology for Evaluating CEMS Data
Update on Hg CEMS They’re here to stay … Jeffrey V. Ryan
Data Submittals to AQS Nate Herbst Southern Ute Indian Tribe.
John A. Coates, P.E., Administrator Wastewater Compliance Evaluation Section, Office of Wastewater Management Florida Department of Environmental Protection.
Laboratory Certification Update Part 2 Common Findings KWWOA Louisville April 15, 2015 Presented by Frank Hall, Laboratory Certification Coordinator.
Hardware Analyser vs Software Analyser
Principles of Computer Security: CompTIA Security + ® and Beyond, Third Edition © 2012 Principles of Computer Security: CompTIA Security+ ® and Beyond,
LEADS/EMS DATA VALIDATION IPS MeteoStar December 11, 2006 WHAT IS VALIDATION? From The Dictionary: 1a. To Make Legally Valid 1b. To Grant Official.
New Form Approval Process. Background New Process is effective April 1, 2014 Published in the March 2014 Cities and Towns Bulletin, pages 7 and 8 Changes.
Production Planning Processes EGN 5620 Enterprise Systems Configuration Fall, 2015.
Checking and Corrective Action EPA Regions 9 & 10 and The Federal Network for Sustainability 2005.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
WHAT IS THE CHEROKEE NATION? Cherokee Nation Air Quality Data Management Concepts for Quality Data Collection Ryan Callison.
Jump to first page Title V Reporting at Wasatch Energy Systems Bart Baker - System Manager at Wasatch Energy Systems Mike Fishman – EXELE Information Systems,
Lancom 4 In Power and Boilers Derek Stuart. Lancom 4 In Power and Boilers Derek Stuart Combustion Theory In order to maximize the heat capture (efficiency)
Copyright © 2010 Pearson Education, Inc. or its affiliate(s). All rights reserved.1 | Assessment & Information 1 Online Testing Administrator Training.
Copyright © All rights reserved. Presented By: System Design Reports A quick look under the hood. System Design reports display.
Control Chart Methodology for Evaluating CEMS Data
Auditing Information Technology
Test Upgrade Name Title Company 9/18/2018 Microsoft SharePoint
Analyze Spending Chain Procedures (Payment Process)
Presentation transcript:

Data QA/QC Techniques

Copyright VIM Technologies, Inc. All Rights Reserved. VIM’s 10-Step Program To Compliance Success 2

Copyright VIM Technologies, Inc. All Rights Reserved. Step 1 Identify Compliance Parameters Determine compliance averages:  NSPS, Permit, Local District Rules, Part 75, etc. Define operating conditions:  Is it in the permit?  SU/SD – duration, mode change, fuel type Define (and document!!) compliance averages:  How to calculate a valid hour, 3-hr roll, 24-hr, etc.  See example provided in handout 3

Copyright VIM Technologies, Inc. All Rights Reserved. Step 2 Review emissions data Print out automatically each morning Configure and review the following types:  Hourly operational data (raw and calculated)  Hourly compliance data (downtime and EE)  Daily calibration Verify values fall within acceptable ranges for source type Verify operating conditions 4

Copyright VIM Technologies, Inc. All Rights Reserved. Step 3 Track and Triage Alarms Eliminate nuisance alarms! Do alarms show a pattern of systemic trouble? (i.e., does analyzer x fail the cal check every morning?) Is a trouble alarm issued every night on component y? Does the startup cal check always fail? 5

Copyright VIM Technologies, Inc. All Rights Reserved. Step 4 Identify and Perform Ongoing QA Testing Fuel analysis and sampling  Part 60 vs. Part 75 vs. Custom Fuel Schedules Fuel meter tests (P75)  Primary element, flow meter accuracy and transmitters CEM related tests  RATA, Linearity, CGAs, Flow to Load  Part 60 vs. Part 75 (see handout)  Flow probe leak checks ( Δ p probes) 6

Copyright VIM Technologies, Inc. All Rights Reserved. Step 5 Schedule and Perform Hardware Preventive Maintenance Develop a schedule based on manufacturer’s recommendations (modify based on experience) Record the schedule in the QA Plan  Along with Spare Parts list! Implement the schedule as developed Follow EPA’s Recertification and Diagnostic Testing Policy 7

Copyright VIM Technologies, Inc. All Rights Reserved. Step 5, continued Be sure you’ve covered these maintenance activities (if appropriate for your installation):  Opacity 3-filter checks  Analyzer zero checks  Calibration & sample line cleaning Have a procedure in place for managing the gas cylinders and the certification sheets 8

Copyright VIM Technologies, Inc. All Rights Reserved. Step 6 Generate and Evaluate Part 75 Reports Does data pass the “red face” test  Do hourly averages and calculations look reasonable?  Do you have data for every hour of operation?  Do you have a cal check for every day of operation?  Does PMA transition properly? Can you account for every period of missing data with a maintenance log entry? Have all tests been completed and reported? 9

Copyright VIM Technologies, Inc. All Rights Reserved. Step 7 Generate and Evaluate Part 60 Reports Does data pass the “red face” test  Do hourly averages and calculations look reasonable?  Are all Downtime and EE Events accounted for? Can you account for every period of missing data with a maintenance log entry? Were proper notifications made for EE events? Do alarm events for excess emissions translate to an entry on the EER? 10

Copyright VIM Technologies, Inc. All Rights Reserved. Step 8 Compliance Tools Use DAHS or export data to MS Excel and graph key reporting elements  See Trend Analysis and CO 2 control chart Track all (non-daily) QA events required and performed  See QA Status report 11

Copyright VIM Technologies, Inc. All Rights Reserved. Step 9 Submit reports & organize paperwork Maintain emission reports, evaluations and submittal transactions in same place Organize and file QA test field sheets Confirm submissions took place  Part 75 – by reviewing the submission log and the submission receipt (i.e. make sure it’s loaded on the EPA host!!)  Part 60 – return receipt 12

Copyright VIM Technologies, Inc. All Rights Reserved. Step 10 Stay ahead of the curve Schedule QA tests to maximize operational flexibility and minimize monitor downtime Watch EPA CAMD’s “what’s new page”  PQA’s ECMPS Support website – register to get announcements EPA applicability determination index Conduct internal audits (using Part 75 field audit manual) Vendor newsletter and announcements 13

Copyright VIM Technologies, Inc. All Rights Reserved. Resources EPA Field Audit Manual PQA ECMPS Support Website and Blog:  Client Tool software downloads and tutorials  Monitoring Plan, QA/Certification, and Emissions Reporting Instructions Policy Manual 14