HBD HV Control and Monitoring System A Gain vs. HV study throughout Run-9 – PART 2 – Manuel Proissl HBD Meeting 06/23/2009.

Slides:



Advertisements
Similar presentations
HBD HV Control and Monitoring System HV, P/T and Gain Variations Manuel Proissl HBD Meeting 04/06/2010.
Advertisements

Copyright © Cengage Learning. All rights reserved. 16 Quality Control Methods.
FUNCTIONS AND MODELS Chapter 1. Preparation for calculus :  The basic ideas concerning functions  Their graphs  Ways of transforming and combining.
Software Quality Control Methods. Introduction Quality control methods have received a world wide surge of interest within the past couple of decades.
GLAST LAT Project IA weekly meeting, February 3, 2006 ACD subsystem Alex Moiseev 1 ACD Pedestals ACD Team at Goddard: Alex Moiseev Dave Thomspon Bob Hartman.
TB & Simulation results Jose E. Garcia & M. Vos. Introduction SCT Week – March 03 Jose E. Garcia TB & Simulation results Simulation results Inner detector.
In order to acquire the full physics potential of the LHC, the ATLAS electromagnetic calorimeter must be able to efficiently identify photons and electrons.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
Statistical Process Control
Copyright © Cengage Learning. All rights reserved. 1 Functions and Limits.
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 17-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 17.
1 HBD HV Commissioning Itzhak Tserruya, HBD meeting, February 27, 2006.
Analyzing the Requirements with Formal Specifications Vienna Development Method Specification Language (VDM-SL) Book: Formal Software Development From.
Cube Measurements Tent Crew. Scintillation BNL 241 Am Semi- collimated  Spectralon Diffuse UV Reflector SBD  -Trigger Scint. Light Poisson.
Preliminary Results from a Trial Beam Test of the Small HBD Prototype at LEGS Bob Azmoun BNL HBD Working Group Meeting May 10, 2005.
HBD HV Control and Monitoring System A Gain vs. HV study throughout Run-9 – PART 1 – Manuel Proissl HBD Meeting 06/16/2009.
Copyright © Cengage Learning. All rights reserved. 1 Functions and Their Graphs.
HBD HV Control and Monitoring System INSTALLATION Manuel Proissl HBD Meeting 11/18/2008.
HBD HV Control and Monitoring System PHENIX Manuel Proissl HBD Meeting 12/09/2008.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL, April 11, 2007.
1 HBD Update Itzhak Tserruya DC meetingJune 10, 2009 June 10, 2009.
FUNCTIONS AND MODELS 1. The fundamental objects that we deal with in calculus are functions.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 09/30/2008.
June 17, 2004 / Collab Meeting Strategy to reduce uncertainty on a  to < 0.25 ppm David Hertzog University of Illinois at Urbana-Champaign n Present data.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
1 Sasha Milov DC meeting... March 7, 2007 HBD status Sasha Milov March 7, 2007.
MEASURE : Measurement System Analysis
HBD CDR Gas System and Monitoring Craig Woody BNL DC Upgrades/EC Meeting March 9, 2005.
HBD Status for Run 10 C.Woody For the HBD Group Collaboration Meeting January 15, 2010.
HBD HV Control System Development Manuel Proissl HBD Meeting 09/18/2007.
Triple GEM Beam Test within PHENIX DC Upgrades Meeting 4/14/04 B. Azmoun PHENIX Brookhaven National Lab.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
1 Stony Brook Update: Another Frustrating week... However difference is isolated: CF 4 T.K. Hemmick for the Tent Crew.
Jeffery T. Mitchell (BNL) – Quark Matter The Evolution of Correlation Functions from Low to High p T : From HBT to Jets Quark Matter 2005 Jeffery.
UM PPS Lab Activities Mid-size Panel Tests PPS meeting January 15, 2012 Claudio, Curtis, Dan, Ethan, Riley.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
, Dan Peterson Apparent inconsistencies and other issues in the xBSM measurements of IBS Scans We have studied the pinhole and CodedAperture.
HBD HV Control and Monitoring System RESISTORS, CALIBRATION & CO. Manuel Proissl HBD Meeting 12/23/2008.
2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt 5 pt 1pt Like fractions Adding unlike fractions.
HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 03/04/2008.
RPC Operation Jilei, Qingmin, Changguo, Ningzhe 2013/4/3.
1 HBD Update Bill and Ted’s Excellent Adventure T.K. Hemmick for the Wyld Stallions.
N. Saoulidou, Fermilab1 Study of the QIE Response & Calibration (Current Injection CalDet & Development of diagnostic tools for NearDet N.Saoulidou,
Update on Diffractive Dijets Hardeep Bansil University of Birmingham 12/07/2013.
Stem-and-Leaf Plots, Histograms, and Circle Graphs Objective: To graph and analyze data in many different ways.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
HBD HV Control and Monitoring System RUN-9 UPDATE Manuel Proissl HBD Meeting 04/08/2009.
Copyright © Cengage Learning. All rights reserved. 1 Functions and Limits.
Recent Gain Changes C.Woody HBD Meeting March 23, 2010.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
HF PMT Issues HF PMT Choice: Hamamatsu R7525 Main Properties Operating Conditions Gain Choice Criteria – lifetime – saturation – timing – SPE monitoring.
Investment Management
Charles F. Maguire Vanderbilt University
MEASURE : Measurement System Analysis
Functions and Their Graphs
Trip Generation Case Studies Residential & Employment
Copyright © Cengage Learning. All rights reserved.
NanoBPM Status and Multibunch Mark Slater, Cambridge University
Analysis of the WLTP EU in-use database with respect to RDE-like trips, update of the presentation from by H. Steven , modified
Devon & Cornwall Police Authority Performance Management Committee
Devon & Cornwall Police Authority Performance Management Committee
1 FUNCTIONS AND MODELS.
Analysis of the WLTP EU in-use database with respect to RDE-like trips, update of the presentation from by H. Steven , modified
Module Recognition Algorithms
Stability of Calibration Data
Analysis Drift velocity of the SDD Detector
Fig. 5 Stability of the Q parameter.
Presentation transcript:

HBD HV Control and Monitoring System A Gain vs. HV study throughout Run-9 – PART 2 – Manuel Proissl HBD Meeting 06/23/2009

GENERAL NOTES  Entire gain and HV data from Run-9 has been processed and is written to the gain tables in hvdb for future reference.  Several (first) sections of this data have been analyzed and are presented below.  Although gain fluctuations are studied based on parameters we’re aware of having direct effect on the gain, incl. P/T measurement and Applied GEM voltage; a solid overall conclusion of its real behavior cannot be given at this point, as the following results indicate. HBD HV Control & Monitoring System Manuel Proissl Page 2 of 11 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 23 rd, 2009

NO HV CHANGE :: CHANGE IN GAIN HBD HV Control & Monitoring System Manuel Proissl Page 3 of 11 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 23 rd, V 2500V HV activity while no PHYSICS running Gain increases by ~ 50% During a PHYSICS running “downtime” of 4 hours, the detector was at Standby.

NO HV CHANGE :: CHANGE IN GAIN HBD HV Control & Monitoring System Manuel Proissl Page 4 of 11 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 23 rd, 2009 During the entire inspected runtime, the P/T varied by 0.25% and stayed within its bin: Torr /K During a PHYSICS running “downtime” of 4 hours, the detector was at Standby.  Gain changed even though no change in voltage nor acceptable P/T within ±10% window. RUNS PROCESSED: WITHIN P/T BIN: T1

HV CHANGE :: CHANGE IN GAIN HBD HV Control & Monitoring System Manuel Proissl Page 5 of 11 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 23 rd, 2009 Gain increases by ~ 96% During a PHYSICS running “downtime” of 2 hours, the detector was brought to Standby and then ‘Quad- tripped’ before the SA1 recovered it to a new P/T HV setting… the gain jump appears. QUAD-TRIP

HV CHANGE :: CHANGE IN GAIN HBD HV Control & Monitoring System Manuel Proissl Page 6 of 11 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 23 rd, 2009 Gain increases by ~ 22% During a PHYSICS running “downtime” of 2 hours, the detector was brought to Standby. STANDBY

HV CHANGE :: CHANGE IN GAIN HBD HV Control & Monitoring System Manuel Proissl Page 7 of 11 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 23 rd, 2009 During the ENTIRE runtime, P/T has been rising (~ 1%) without any change in gain until it passed the boundary, which is when we adjusted the voltage… The software did what it was supposed to do! However, the idea is to keep the gain STABLE by adjusting the HV if the gain raises or falls respectively! T1/T2 BOUNDARY T1 T2 HV CHANGE Torr/K RUNS PROCESSED:

HV CHANGE :: “NO” CHANGE IN GAIN HBD HV Control & Monitoring System Manuel Proissl Page 8 of 11 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 23 rd, 2009 Before IR Access on June 10 th and after, the gain did not change, although the HV has been changed to the next P/T HV bin. shown above IR ACCESS

HV CHANGE :: “NO” CHANGE IN GAIN HBD HV Control & Monitoring System Manuel Proissl Page 9 of 11 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 23 rd, 2009 The P/T was changing quite a lot as well as the HV after the access. Nevertheless, the gain remained constant. T1 T2 T3 CONFIG CHANGE APPLY HV CHANGE shown above IR ACCESS GAS MIXING HOUSE PROBLEM RUNS PROCESSED:

GAIN STABILITY FOR ALL 200GeV runs HBD HV Control & Monitoring System Manuel Proissl Page 10 of 11 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 23 rd, 2009 One module from the East and West is plotted for the two most activate P/T sets throughout the entire 200 GeV run. Only Physics runs without virtual or hardware trips in ES3 or WN5 have been chosen. Overall stability of the gain can be seen for each individual set.

Entire P/T Variation for Run-9 HBD HV Control & Monitoring System Manuel Proissl Page 11 of 11 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: June 23 rd, 2009 A large fraction of the 500 GeV data shows lower P/T, corresponding to March 15 th to April 13 th.  mostly T1 & T2 bin activity. Unlike the overall 200 GeV run, showing several high peaks with a primary bin range of T2 to T GeV500 GeV