Www.csiro.au Back to Components High Capacity Underground Coal Mining (L15) A joint project (Scoping Study) between CSIRO Exploration & Mining and University.

Slides:



Advertisements
Similar presentations
ASSESSMENT & PLANNING FOR POST-DISASTER RECOVERY OF COMMUNITY INFRASTRUCTURE United Nations Development Programme Bureau for Crisis Prevention & Recovery.
Advertisements

The Role of Environmental Monitoring in the Green Economy Strategy K Nathan Hill March 2010.
Stormwater harvesting – standards, regulations and Industry practice Presentation to Recycle Water May 2013
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Course: e-Governance Project Lifecycle Day 1
Prior activities of FEWE Under the bilateral and multilateral co-operation, several projects to support the rational energy use in different sectors.
Research Update Automated Bolting and Meshing Project - C17018.
Good Evaluation Planning – and why this matters Presentation by Elliot Stern to Evaluation Network Meeting January 16 th 2015.
DEMİR EXPORT – FERNAS JV
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
Development Taskforce Presentation
The Potential for Retrofitting Green Roofs in the Central Business District The 16 th Annual European Real Estate Society Conference, Stockholm June.
Process Industries Benchmarking Professor Munir Ahmad School of Science and Engineering Teesside University NEPIC Presentation.
Austar Coal Mine The Positive Pressure Chamber Austar Coal Mine & Joncris Sentinel Services Proactive: - Spontaneous & Combustible Gas Management - Seal.
Design Optimization of Longwall Chain Pillars
ACARP Australian Roadway Development Improvement Project CM2010 IMPLEMENTATION STRATEGY August/September 2009 Guy Mitchell, BMA Coal Bob Miller, Centennial.
Support to the Development of Greenfield investments in Lithuania “Marketing and promotion of the industrial parks” Training session leader: Paul Baker,
Outburst Workshop A new operator’s perspective Scott Langley BHP Billiton Illawarra Coal.
Life Cycle Analysis and Resource Management Dr. Forbes McDougall Procter & Gamble UK.
1 Anglian Water - Sewernet David Singerton, Innovation Projects Manager Evolving an Extreme Rainfall Management system Sewernet proposals 20 th November.
Highwall Mining. Presentation outline l Highwall mining systems l Geotechnical issues & rating l Guidance Control l Failures and causes l Conclusions.
Development & Implementation of Strata Control Practices
ACARP Project C14036 Development of a New Shearer Scrubber System for Dust Control Brian Plush EnviroCon Ting X Ren and Rao Balusu Exploration and Mining.
Industrial Technologies MINAM 2.0 Paving the ground for the second generation of a highly effective, application oriented Micro-Nano Manufacturing.
Pike River Coal Mine ACARP Presentations August 2008 Peter Whittall – General Manager, Mines PIKE RIVER COAL.
Energy Management Proposed At KTPS. Objectives for Energy Management Generate energy at lowest possible price Manage energy use at highest energy efficiency.
Control of Airborne Respirable Dust Hazards: A Training Program for Underground Coal Miners The Penn State Miner Training Program University Park, PA
City of Edmonton Strategic Approach to Environmental Management Office of the Environment.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
16 Beltana Development ACARP Roadway Development Operators Workshop Sept
An Introduction to AlarmInsight
Adaptation & Technology Gaps Anne Olhoff Head of Programme Climate Resilient Development UNEP Risø Centre UNEP Adaptation Knowledge Day V, Bonn, 9 June.
Research Update Automated Bolting and Meshing Project.
Sedimentology & Stratigraphy:
ROADWAY DEVELOPMENT IMPROVEMENT PROJECT
Advanced Technology for Progressing India's Underground Coal Mining Lisa Duncan August 2014.
ROAD TRANSPORT RESEARCH, TECHNOLOGICAL DEVELOPMENT AND INTEGRATION (2003 Call)
FEHRL’s Vision and the Common Approach to Automotive and Infrastructure Research Steve Phillips, FEHRL.
Opting for “Long Term Operations” Technical, economic and regulatory considerations MARC Conference June 8, 2010 Sean Bushart, EPRI Sr. Program Manager.
Evaluating the Effectiveness of the 1750 Tonne Shields at Moranbah North Mine Kelly Martin Mehmet Kizil Ismet Canbulat.
Technologies and Equipment to Control and Improve UNDERGROUND MINE SAFETY Lunagas Pty Limited Beijing, CHINA, Beijing, CHINA, April 2004 Les Lunarzewski.
Ground Improvement Issues & Techniques
ACARP Australian Roadway Development Improvement Project Strategy Workshop April 2007.
Profile Solutions Ltd. In Partnership with it’s Clients SIMCAP® Capacity Simulation and Business Modelling.
OBTAINING QUALITY MILL PERFORMANCE Dan Miller
1 ACARP Roadway Development Operator Workshops March 2009 Modelling of Gateroad Development Ernest Baafi – UOW Geoff Gray – SMS Ian Porter – UOW Osvaldo.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Presentation and review of TTA-report: Exploration and Reservoir Characterisation Summary Background Project Proposal.
ACARP Roadway Development Operator Workshop No 7 A Systems Approach to Roadway Development Mick Kelly, BMA Coal.
CM2010 IMPLEMENTATION STRATEGY
1 Improvement of Industrial Energy Efficiency in Nigeria Presented by UNIDO.
Environment SPC 24 th June 2015 New Climate Change Strategy.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
Advanced Lighting Control Systems (ALCS) Energy Estimation Tool Pacific Gas & Electric Company Dave Alexander.
T172 Tutorial 2. Maths Day school for Technology Students Saturday 27 March Regional Centre, Manchester (Details to be sent in post) The day school clashes.
Kathy Corbiere Service Delivery and Performance Commission
Sloping Tube Coal Separator – KNS Innovative solutions in coal preparation 2009.
A Strategic Plan for Pavement Engineering NCHRP 20-7(223) AASHTO Joint Technical Committee on Pavements Dan Dawood, P.E. Pennsylvania Department of Transportation.
COAL MINE PROJECT OPPORTUNITY NALAIKH MINE POWER GENERATION AND HEATING PROJECT TSAGAAN SHONKOR HOLDING COMPANY NALAIKH DISTRICT, MONGOLIA OVERVIEW OF.
Reaching New Heights Tools and Data for air quality planning in the Intermountain West Intermountain West Data Warehouse Presenter: Agency: Contact Information:
Council Improvement Plan Council Meeting 1 June
Overview of Sustainability Policy Issues CMAP Board of Directors October 10, 2007.
Road Investment Decision Framework
Life Cycle Assessment Assessing local impacts María del Mar Pintor
Session 1 – Area 2* Nanotechnologies and advanced materials in EeB
Innovate. Improve. Grow. WEAVER: HEXAPOD ROBOT WITH 5DOF LIMBS FOR NAVIGATING ON UNSTRUCTURED TERRAIN.
Nick Kelly, Jon Hand, Aizaz Samuel
The SWA Collaborative Behaviors
Chapter RESOURCE ACCESS AND DEVELOPMENT
Chapter PREDICTION AND ASSESSMENT OF RESOURCES
Presentation transcript:

Back to Components High Capacity Underground Coal Mining (L15) A joint project (Scoping Study) between CSIRO Exploration & Mining and University of Queensland’s Sustainable Minerals Institute (SMI)

Back to Component s Scoping Study Objectives Benchmark current practices and determine what is needed to achieve a high capacity underground coal mine (15Mtpa) and optimisation of existing operations Report on strategic research directions needed to support future high capacity mining. Identify specific, high impact research and development projects to facilitate high capacity mining. Identify opportunities for operational, technical and postgraduate training in areas relevant to high capacity coal mining

Back to Component s Process Develop a predictive model (15Mtpa coal mine) on which comprehensive research proposals would be dependent. Incorporates LW productivity, utilisation, seam characteristics, development requirements, sensitivities and cost model. Considerations included: 1.8 – 4.5m seam thickness; LTCC and multi-seam operation Segregate the overall strategy into 7 sub-categories for further study, under the respective objectives Provide separate reports addressing the requirements of the scoping study

Back to Component s 15Mtpa model identified key issues Criticality of system uptime High shearer speed/power to deliver tonnages Support hydraulics for rapid support cycle times Optimise cutting cycle – uni-di; bi-di; half web Development rate increase Improved coal clearance for minimal bottlenecks

Back to Components Coal Resources and Deposit Delineation

Back to Component s Coal Resources and Deposit Delineation Update of UNSW thick seam database from public sources (113 mines-330 point source data)

Back to Component s To create confidence that a deposit will be able to host a 15Mtpa operation requires integrated analysis of geologic data across company boundaries at the district scale, similar to that in the ACARP Supermodel 2000 project High tonnage longwall operation will require enhanced interpretation of structure and interburden characteristics Multi-scale modeling of fault geometries and simulation of behaviour under variable rock mass, stress and mining methods Research Direction

Back to Components Geological and Geotechnical Assessment and Support

Back to Component s Current Status Greater propensity for stability problems in thick seams operations Geotechnical downtime generally occurs comparatively more frequently on the face (a shift from gateroads) Geophysical methods of rock mass characterisation are preferred but there is a lack of experienced people to interpret the information Typically 1-2 normal faults per panel

Back to Component s Research Direction Implementation of real-time face and gate road “Smart” monitoring which includes interpretation and control measures Determination of interaction between cutting height and operational characteristics Interaction of seams in multi-seam operations Enhanced fault detection and definition for mining through in-panel faults – possibly utilising microseismic technology

Back to Components Roadway Development Systems

Back to Component s Current Status Later generation, best practice mines with good conditions could attain 15Mtpa mines without major developments in mining equipment and systems Infrastructure limitations will constrain older mines from making major improvements in mine capacity, while adverse conditions generally associated with depth pose additional productivity challenges to these mines (and to later generation mines as they mature) Technology developments are currently underway that are likely to address a number of key process constraints in the short to medium term, thus providing the potential to improve system capability across all mines

Back to Component s Specific Research Projects Extensible (monorail mounted) face services (e.g. ventilation, power, water, compressed air, pump out) Integrated development mining system Extensible, self advancing coal clearance system Alternative skin reinforcement and confinement measures Complementary technology developments including automation and robotics, machine guidance systems, light weight materials, face pumping systems, roadway construction and consolidation

Back to Component s Projected Gains

Back to Components Gas and Ventilation

Back to Component s Longwall Gas Emissions Related to Face Production

Back to Component s Research Direction Gas Drainage Extensive pre-drainage of gas including optimisation of MRD gas holes for pre-drainage/deep gas drainage technology and stimulation Coordination and cooperation with petroleum and gas developers to utilise/reduce gas reservoir Optimise goaf inertisation strategies for operational use – including exclusion foams

Back to Component s Research Direction Spontaneous Combustion Development of low impact inertisation systems Heat Development of heat extraction techniques for fixed and possibly mobile plant Dust Optimise coal seam water injection techniques prior to mining

Back to Components Water Management

Back to Component s Current Status Water Consumption Highest users have the highest losses; lowest users have the lowest losses Water Inflow Typical inflows range from 3-5 Ml/day; some up to 15Ml/day Water use ML/Mtpa Water loss ML/Mtpa Range55 – – 180 Average13090

Back to Component s Strategic Research Directions Reduction in water consumption and variability through integration of research into water usage, management and technology Integrated approach to hydro-geology and geotechnical aspects Underground water recycling and reuse technology

Back to Components Longwall Face Equipment and Coal Transport

Back to Component s Current Status Current equipment is capable of delivering at or about the 15Mt target Average production from the top 5 mines based on the last 3 years was 4,647,660 tonne The average cutting hours per year calculated from the 8 mines studied over the last 3 years was 2745 hours The average output per hour from the longwall faces was 1693 tonne

Back to Component s Current Status Longwall faces cut for only 31% of the total time in a year Breakdown maintenance outweighs planned maintenance by 4 to 1 The shearer, panel belt and AFC, respectively, are the largest contributors to down time totalling over 50% Planned maintenance effort does not reflect the downtime statistics and is ad-hoc

Back to Component s Downtime Breakdown

Back to Component s Research Directions Further development and implementation of face automation Effective analysis of monitoring data on a real time basis for maintenance purposes Real-time maintenance prioritisation system New sensors and systems for condition monitoring

Back to Components Licence to Operate

Back to Component s Specific Research Projects Assessment, prediction and validation of the impact of increased mining height and width on local and regional water resources and catchments Development of realistic and achievable engineering controls for dust, noise and heat management Assess and validate current subsidence prediction methodologies for high capacity contexts