Principles for risk and uncertainty analysis and management, in a production assurance setting Roger Flage PhD student on the RAMONA project (research.

Slides:



Advertisements
Similar presentations
Operation & Maintenance Engineering Detailed activity description
Advertisements

Engineering Diploma Level 2 Unit 7 Application of Maintenance Techniques in Engineering In this unit you will get involved with both maintenance procedures.
Treatments of Risks and Uncertainty in Projects The availability of partial or imperfect information about a problem leads to two new category of decision-making.
Presentation to Frozen Assets Limited Feasibility Study D.M.S Jehan Kanagasingham Lucian Keong Chris Nugent D.M.S.
Castellanza, 20 th October and 3 rd November, 2010 FINANCIAL INVESTMENTS ANALYSIS AND EVALUATION. Corporate Finance.
Case Study in Successful Risk Management – The Oil and Gas Industry in Norway Some critical reflections Terje Aven University of Stavanger, Norway.
 Life cycle costing, LCC, is the process of economic analysis to asses the total cost of ownership of a product, including its cost of installation,
Lecture(4) Instructor : Dr. Abed Al-Majed Nassar
VI-Economic Evaluation of Facility Investments 1. Project Life Cycle and Economic Feasibility 2.Basic Concepts of Economic Evaluation 3.Costs and Benefits.
Farm Business Planning Dr. Laurence M. Crane
GODFREY HODGSON HOLMES TARCA
ICP 14 Valuation Christina Urias Managing Director, International Insurance Regulatory Affairs National Association of Insurance Commissioners.
Scaling and Attitude Measurement in Travel and Hospitality Research Research Methodologies CHAPTER 11.
The Role of Accounting in Business Chapter 1
1 Engineering Economic Decisions Lecture No.1 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Chapter 14 Risk and Uncertainty Managerial Economics: Economic Tools for Today’s Decision Makers, 4/e By Paul Keat and Philip Young.
Maintenance Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
ACCOUNTING STANDARD (AS) 15 An Actuarial Perspective AICG ACTUARY INDIA CONSULTING GROUP.
A.S 3.3 Describe and illustrate resource allocation via the public sector to compensate market failure.
Introducing Accounting in Business
Financial Statements 2 Lecture 3
Role and Components of Project Evaluation
Steve Paulone Facilitator Financial Management Decisions The financial manager is concerned with three primary categories of financial decisions:  1.Capital.
Financial Stewardship For Organizations: An Overview.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
Accounting and Reporting on an Accrual Accounting Basis By: Associate Professor Dr. GholamReza Zandi
Property Plant & Equipment -
Normative Criteria for Decision Making Applying the Concepts
Slide 2.1 Accounting and Reporting on an Accrual Accounting Basis Chapter 2.
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Conceptual Framework u By the end of this class you should be familiar with …. u Activities of the firm u Major items in the Balance sheet and Income Statement.
In this module, you study the capital budgeting process and how cash flows are estimated. First, the general administrative structure that exists in most.
Oper. Decisions - 1 OPERATING DECISIONS. UNCOLLECTIBLE ACCOUNTS RECEIVABLE n When credit is extended, some amount of uncollectible receivables is generally.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions 1 What is Engineering Risk and Reliability? Why We Use It? Robert C.
1 Environment and Theoretical Structure of Financial Accounting Sid Glandon, DBA, CPA Associate Professor of Accounting.
Concepts - 1 The FASB’s Conceptual Framework of Accounting.
CHAPTER 10 DEALING WITH UNCERTAINTY. RISK Risk and uncertainty are similar in that they both present the problem of not knowing what future conditions.
An uncertainty management approach to a maintenance decision for an ageing system Thor Erik Nøkland Roger Flage Terje Aven.
1 Ch 7: Project Analysis Under Risk Incorporating Risk Into Project Analysis Through Adjustments To The Discount Rate, and By The Certainty Equivalent.
Maintenance McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Financial Accounting Fundamentals
Life-cycle cost analysis (LCCA)
ACTG 3110 Chapter 2 – Conceptual Framework Underlying Financial Accounting.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin BASIC FINANCIAL STATEMENTS Chapter 2.
Mgmt.101 ~ Introduction to Business Risk Management & Insurance.
Risk Analysis in Capital Budgeting. Nature of Risk Risk exists because of the inability of the decision-maker to make perfect forecasts. the risk associated.
Chapter 11 Contingency. Contingent 1.concept: past transactions or events of a situation, the results by the occurrence of uncertain future events occur.
Unit-3 Reliability concepts Presented by N.Vigneshwari.
Managerial Economics Uncertainty Aalto University School of Science Department of Industrial Engineering and Management January 12 – 28, 2016 Dr. Arto.
McGraw-Hill/Irwin Copyright © 2004 by the McGraw-Hill Companies, Inc. All rights reserved. Chapter 2 Objective and Risk Management.
1 CS-19 Risk Tools and Modeling - Risk Tolerances and Limits Russ Bingham Vice President and Director of Corporate Research Hartford Financial Services.
Capital Budgeting and Risk Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Chapter 4 Measurement PowerPoint Presentation by Matthew Tilling ©2012 John Wiley & Sons Australia Ltd.
Key Questions about Managing Risk on the Farm--Chap. 15 What are the sources of risk that farmers face? What strategies do farmers use to control risks?
International Atomic Energy Agency Implementation of a Risk-Informed Approach into the Legislative and Regulatory Framework SNRCU Annual Topical Meeting.
CHAPTER 1 AN INTRODUCTION TO FINANCIAL INSTITUTIONS, INVESTMENTS & MANAGEMENT ELEVENTH EDITION Basic Finance 1.
Ranjan kumar Assistant Manager CCL,Ranchi
Cost effectiveness Analysis: Valuing Health; Valuing Research!
Decisions Under Risk and Uncertainty
7 Capital Budgeting Decisions–Part I
PROFIT AND CONTINGENCIES (FIN-28)
Overview of the Financial Statements
IAS 16 Property Plant & Equipment
GODFREY HODGSON HOLMES TARCA
Concepts – Evolution of a Global Conceptual Framework
Costing and Finance P R Upadhyay.
Economics for Engineers Economic Decision Making
Concepts – Evolution of a Global Conceptual Framework
Lecture was elaborated with the help of grant project of Ministry of Education, Youth and Sports, FRVŠ n „Innovation of Subject Financing of Building.
Presentation transcript:

Principles for risk and uncertainty analysis and management, in a production assurance setting Roger Flage PhD student on the RAMONA project (research tasks 1 and 4)

2 Basis for this presentation Aven, T. & Flage, R. Use of decision criteria based on expected values to support decision-making in a production assurance and safety setting. Reliability Engineering and System Safety, to appear. Flage, R. & Aven, T. On treatment of uncertainty in system planning. Reliability Engieering and System Safety, to appear.

3 Expected value decision criteria How should we use the E[NPV] approach, with adjustments, in the decision-making process? NPVNet Present Value

4 The E[NPV] Expected cash flow at year t = E[B t ] – E[C t ] Analysis period Discount rate at year t B t benefits (revenues) at year t C t costs at year t

5 Uncertainty reduction in system planning Should we use predefined uncertainty interval categories to direct uncertainty reduction processes?

6 Uncertainty reduction structure Prediction interval categories Feasibility phaseConcept development phase Engineering phase E 1 [Y]± 40% Y ± 30% ± 20% E 2 [Y] E 3 [Y] Y Performance measure (e.g production downtime)

7 Uncertainty reduction structure Prediction interval categories Feasibility phaseConcept development phase Engineering phase E 1 [Y]± 40% Y ± 30% ± 20% E 2 [Y] E 3 [Y] Y Performance measure (e.g production downtime) Use with care

8 Some E[NPV] adjustments Risk-adjusted discount rate Downward revision of benefits, upward revision of costs Safety margin Negative safety margin Cut-off periods

9 Some E[NPV] adjustments Risk-adjusted discount rate Downward revision of benefits, upward revision of costs Safety margin Negative safety margin Cut-off periods Considerable arbitrariness

10 Wrong assumptions All aspects of risk and uncertainty have been taken into account in the formulae There is no need for seeing beyond the formulae

11 The main problem Risk and uncertainties are represented by probabilities, but probabilities are not perfect tools for expressing risks and uncertainties.

12 Decision situations 1.Known, “objective” probability distributions can be established 2.More or less complete ignorance 3.A situation between the two extremes 1) and 2)

13 Approaches to arriving at a good decision Decision criterionDecision Analyses Managerial review and judgement Decision Basis for the analyses Other concerns Analyses

14 Uncertainty reduction in system planning Should we use predefined uncertainty interval categories to direct uncertainty reduction processes?

15 Uncertainty reduction structure Prediction interval categories Feasibility phaseConcept development phase Engineering phase E 1 [Y]± 40% Y ± 30% ± 20% E 2 [Y] E 3 [Y] Y Performance measure (e.g production downtime)

16 Uncertainty reduction structure Prediction interval categories Feasibility phaseConcept development phase Engineering phase E 1 [Y]± 40% Y ± 30% ± 20% E 2 [Y] E 3 [Y] Y Performance measure (e.g production downtime) Use with care

17 Structural levels and planning guidance Structural level Plant or system System Subsystem, equipment and component

18 Structural levels and planning guidance Structural levelForm of planning guidance Plant or systemOverall ideal goals SystemRequirements related to expected performance Requirements related to uncertainty about performance Specifications related to design or operation Subsystem, equipment and component Requirements related to expected performance Requirements related to uncertainty about performance Specifications related to design or operation

19 Structural levels and planning guidance Structural levelForm of planning guidanceSpecific examples and examples of attributes Plant or systemOverall ideal goals“No production losses” SystemRequirements related to expected performance Throughput availability Demand availability Requirements related to uncertainty about performance Prediction interval limits Limit for variance of lost throughput Specifications related to design or operation Capacity Size and weight Operating temperature range Maintenance - Spare part needs - Manpower needs Subsystem, equipment and component Requirements related to expected performance Mean time to failure (MTTF) Mean time to repair (MTTR) Requirements related to uncertainty about performance Reliability/availability at a specified time Specifications related to design or operation Capacity Size and weight …

20 Structural levels and planning guidance Structural levelForm of planning guidanceSpecific examples and examples of attributes Plant or systemOverall ideal goals“No production losses” SystemRequirements related to expected performance Throughput availability Demand availability Requirements related to uncertainty about performance Prediction interval limits Limit for variance of lost throughput Specifications related to design or operation Capacity Size and weight Operating temperature range Maintenance - Spare part needs - Manpower needs Subsystem, equipment and component Requirements related to expected performance Mean time to failure (MTTF) Mean time to repair (MTTR) Requirements related to uncertainty about performance Reliability/availability at a specified time Specifications related to design or operation Capacity Size and weight …

21 Structural levels and planning guidance Structural levelForm of planning guidance Specific examples and examples of attributes “No production losses” Throughput availability Demand availability Prediction interval limits Limit for variance of lost throughput Capacity Size and weight Operating temperature range Maintenance - Spare part needs - Manpower needs Mean time to failure (MTTF) Mean time to repair (MTTR) Reliability/availability at a specified time Capacity Size and weight … Plant or systemOverall ideal goals SystemRequirements related to expected performance Requirements related to uncertainty about performance Specifications related to design or operation Subsystem, equipment and component Requirements related to expected performance Requirements related to uncertainty about performance Specifications related to design or operation Avoid unless a rationale can be given May be stated when level of detail in planning becomes high Do not treat as absolute limits “Optimisation” (in a broad sense) Feasibility and concept development phases Engineering phase

22 Conclusions Be careful in using adjustments of expected values to reflect risk and uncertainties Use predefined uncertainty interval categories with care

23 Situation 1 Known, “objective” probability distributions can be established Net benefit0110 Probability E[NPV] = 0.09 Net benefit Probability E[NPV] = safety concerns + environmental issues

24 Situation 2 More or less complete ignorance Net benefit Probability0.25 E[NPV] = 25 1.E[NPV] poor prediction  consider distribution 2.Poor basis for probabilities (knowledge based) 3.Even more extreme outcomes could occur 4.Uncertainties related to non-economic outcome dimensions e.g. health problems for workers in years Little is gained by introducing a specific formula reflecting uncertainty and risk aversion

25 Situation 3 A situation between the two extremes (1) and (2) How much weight to give to risk and uncertainties? The company’s attitude towards risk and uncertainty The frame conditions, for example defined through taxes, regulations etc. Compensation schemes (monetary or in kind) Insurance and liability Sustainability. Does the project assist in sustaining vital ecological functions, economic prosperity and social cohesion? Ethical concerns, for example related to equity and fairness Political concerns … A balanced perspective is required