Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments.

Slides:



Advertisements
Similar presentations
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
Advertisements

WIYN Planning Meeting, February 28, 2013 Wisconsin, Indiana Yale, NOAO 0.9m Half Degree Imager – First Light.
Progress report to SAC for the GISMO -- Gladders Image-Slicing Mutlislit Option for IMACS -- A. Dressler Basic mechanical/optical assembly -- Feb ‘07 1.
Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.
G D Interferometer Status LSC Meeting, Ann Arbor, June 4, 2005 Daniel Sigg.
PALM-3000 Instrument commissioning schedule Antonin Bouchez Team Meeting #7 27 February, 2008.
Interfaces with the SNS Project for the ARCS Instrument Doug Abernathy ARCS Hardware Project Manager ARCS Construction Project Review DOE Germantown Aug.
LIGO-G L Peter Fritschel & Michael Zucker PAC18 meeting LIGO Livingston Observatory 18 May 2005 S5 Run Performance Goals.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments Facility instruments User (P.I.) Instruments Clean Room.
Magellan f/5 Planning and Status Andrew Szentgyorgyi Magellan SAC Meeting Pasadena/17 Mar 2012.
Technical manager’s report September Telescope activities Primary mirror hardpoint repair New mirror actuator controls Collimation analysis F/5.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments Committees.
Mark Bowen Acting Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 14 October 2010 Australia Telescope Users Committee.
SSSC 02/18/2010 P. Marcum Science Utilization Policies SOFIA SCIENCE UTILIZATION POLICIES Pamela M. Marcum SOFIA Project Scientist SSSC Feb 19, 2010.
Magellan Director Report Personnel Observing Statistics Instrument Commissioning Instrument Development Fast Internet Connection Publications (A. Uomoto)
TSIP (Telescope System Instrumentation Program) proposal February, 2005 Carnegie submission, on behalf of Magellan Consortium: “A Second, More Sensitive.
Magellan F/5 System Status A.Szentgyorgyi/SAO/25 Sept 2004.
Magellan Telescopes Observatory Report Accomplishments Problems Work in Progress Network f5 mirror coating.
LIGO-G M Management of the LIGO Project Gary Sanders California Institute of Technology Presented to the Committee on Programs and Plans of the.
Christmas 2015 Resourcing August Update. Christmas 2015 Resourcing Goals To deliver an integrated, seamless, end-to-end resourcing and payroll process.
Status Review Dec. 1, 2003 Mark Hunten MONSOON Project Manager NOAO MI Program.
Report from Subaru Advisory Committee The main issues of the current SAC: ・ Extensive (strategic) program of Subaru telescope ・ International collaborations.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
LBT Q Engineering and Software Review ENGG Engineering General.
MWA Operations Management Plan (OMP, v. 3) Ron Remillard (MIT); MWA Project Meeting, June 6, 2011.
6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 6-7 October.
Managing Under a Six-Nation Partnership Gemini Observatory soon to be Five.
Magellan technical updates, Pasadena April 2006 – September 2006.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments Existing instruments Future Instruments.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
May 17, 2004SSWG - PFIS Shared Risk1 PFIS Commissioning, Shared Risk, and Transition to Operations.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
Magellan Telescopes Instrumentation: A Critical Assessment of Current Status.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
Magellan F/5 Status Eavesdropping PISCO Andrew Szentgyorgyi 25 Apr 2011/Pasadena 4/25/111Magellan SAC/Pasadena.
Planning for Operations SKA Engineering Meeting 2015 Prof. Gary Davis 10 th November 2015.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
9/24/05MagE Update SAC meeting Developments with MagE Complete layout of Spectrograph structure and camera by B. Bigelow –Structure will be all anodized.
SAC Report Povilas Palunas 2/23/ Primary Mirrors Primary Aluminizing Schedule back on track –Baade aluminized in Jan after 4 years. 3% gain over.
Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.
Magellan Telescopes Observatory Report Personnel Network/Systems Administration Observing Statistics.
Pasadena Updates March February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.
Magellan Telescopes Observatory Report Personnel Accomplishments Observing Statistics Common Problems Work in Progress.
1 FLITECAM December 11, 2008 Ian McLean (Principal Investigator) UCLA Infrared Laboratory University of California, Los Angeles.
1 FLITECAM April 28, 2009 Ian McLean (Principal Investigator) UCLA Infrared Laboratory University of California, Los Angeles.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
SALT Board Meeting #19: May 2006 Board Meeting #19: 8-9 May Astronomy Operations Now 3 SOs: Fred, Sandisa, Lucian (Francois resigned), with Charl.
18-19 May 2007Mosaic-II Update, SAC Meeting Mosaic-II Progress Tyson Hare, Ian Thompson, Greg Burley, Christoph Birk, Alan Dressler, Alan Uomoto.
Operations Good –Telescope downtime is low –Important repairs accomplished –Observer satisfaction is high Bad –Maintenance is deferred –Unfinished work.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
MagIC Upgrade for High-Speed Photometry Jim Elliot, MIT Magellan SAC
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
Technical resources schedule
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
October 2006, LIGO Hanford Observatory
PLC-based control systems at SOLEIL - ICALEPCS 2017
Operations Concept Simon Radford and Operations Committee
Integration & Commissioning
Magellan Status Report March 19, 2016 Carnegie Observatories
Magellan Telescopes Observatory Report
User instrument policy
EVLA Advisory Committee Meeting
EVLA Operations Jim Ulvestad
Student Administration and Support Programme and Project Timelines
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments

Personnel Telescope Engineer Scientist: In mid-December, Povilas Palunas accepted the position of Magellan Telescope Scientist Povilas and his family arrived in La Serena to take up residence on February 27 Before joining Magellan, Povilas was a Research Scientist at the McDonald Observatory He has considerable experience working with large telescopes, and was the top choice of the search committee

Personnel (cont.) Magellan Mechanical Engineer in Pasadena: Charlie Hull will be transitioning to work full time for the GMT project by July 1 Fortunately, Charlie is interested in maintaining contact with the Magellan project, and we hope to continue to draw on his experience from time to time A search for Charlie’s replacement will be organized soon

Personnel (cont.) Magellan Telescope Controls Programmer: José Miguel Soto has recently informed us that he will be taking a job with Gemini South beginning in mid-April José is our most experienced DOS programmer, and will be difficult to replace on a short timescale One of the principal reasons that he gave for leaving Magellan was the more attractive benefits package offered by Gemini With the Magellan budget frozen for the next 2 years, it would not be surprising if other key Magellan Operations staff are tempted to leave

Baade Telescope Instrumentation Usage: 9 Feb Aug Aug Mar 2008 IMACS74%65% PANIC26%32% MagIC--3% Observing Statistics Clay Telescope Instrumentation Usage: 9 Feb Aug Aug Mar 2008 MIKE56%41% MIKE fibers--7% LDSS-332%45% MagE--7% MagIC12%--

Baade + Clay Telescopes Instrumentation Usage: 9 Feb Aug Aug Mar 2008 IMACS34%32% MIKE25%20% LDSS-320%22% PANIC13%16% MagE--4% MIKE fibers7%4% MagIC1%2% Observing Statistics

Observing Statistics: Instrument Usage

22 Aug Mar 2008: Observing Statistics BaadeClay % Open87.2%88.4% % Lost to Weather11.1%10.8% % Lost to Telescope0.9%0.7% % Lost to Instrument0.7%0.1% % Lost to Computer0.1% % Total Downtime1.7%0.9%

Instrument Downtime: 9 Feb Aug Aug Mar 2008 MIKE0.0% MIKE fibers2.8%0.0% MagIC0.0% LDSS-30.5%0.2% IMACS0.4%1.0% PANIC1.6%0.2% MagE--0.0% Observing Statistics

Observing Statistics: Downtime

Commissioning of Instruments IMACS -- commissioned MIKE -- commissioned PANIC -- uncommissioned (and never will be) MagIC -- almost commissioned? MagIC and its new cable wrap were mounted on the FP2 port of Baade in early-Nov Engineering carried out in Nov 2007 and Jan-Feb 2008 SITe CCD is functioning and is available for science usage EEV CCD is operable but currently suffers from strong pattern noise; further engineering is scheduled To complete comissioning requirements for SITe mode: Mount vacuum pump on telescope (MIT) Software upgrades and on-sky tests of EEV CCD (MIT) Complete Users Manual and Mountain Support Manual (MIT) Finish Support Agreement (MIT, Magellan Ops)

Commissioning of Instruments MagE -- almost commissioned MagE was installed at FP2 of Clay telescope Nov 2007 Two successful engineering runs in Nov 2007 and Jan 2008 Instrument now being used routinely for science observations A Support Agreement has been drafted by the instrument team, and reviewed by the Magellan Operations staff Commissioning report to be delivered at this meeting

Commissioning of Instruments (cont.) LDSS3 -- an uncommissioned Magellan instrument No further progress in completing commissioning process Ian Thompson continues to support detector system; Christoph Birk continues to maintain the instrument control software Alan Uomoto headed up effort to improve shutter reliability, and to allow all three VPH gratings to be in the instrument at the same time A scientist is needed to serve as the Instrument P.I. An institution is needed to take over maintenance of the mechanical systems A support agreement is needed I’ve been saying all of this for over a year now! Agreement with Durham ends early next year…