2 EXECUTIVE SUMMARY MACHINE DOWNTIME CD BAR YR 2014/2015 CD BAR YR 2013 by % FEB 14 MAC 14 APR 14 MAY 14 JUNE 14 JULY 14 AUG 14 SEPT 14 OCT 14 NOV 14.

Slides:



Advertisements
Similar presentations
USER MAINTENANCE.
Advertisements

Daikin Altherma™ Troubling Shooting
Purpose Body Making module is designed for bending the laminated foil film in the shape of a tube, for welding the side seam and for cutting bodies with.
Common Faults - Machinery Cover missing or not fitted correctly Action : replace or refit covers Nuts or bolts missing from covers Action : replace Seals.
Engineer Training XL1200 Mechanics. Engineer Training XL1200 Mechanics Confidential 2 The XL1200 is both a Roll to Roll and a Roll to Sheet Printing Machine.
Page 1 MDS Installation. Page 2 Contents  Introduction  Outdoor Unit Installation  Indoor Unit Installation  Refrigerant Pipe Work  Gas Charge 
1 I. Troubleshooting ◆ Troubleshooting of hydraulic machine FailuresReasonsCountermeasures Hydraulic driving motor can ’ t start 1)Fuse burnt 2)Electric.
38GXC(Q)/40GXC(Q) Service Training Sizes 18 and 24K.
Vibration Monitoring and Machine Protection Systems 1010 E. Main St., League City, TX Phone: Fax: /
© Unitec New Zealand 1 Faulty Starting System Symptoms No Cranking Slow Cranking Abnormal Noise Overheating of Cables.
Unwinding module is designed for unwinding of laminate tape, for its steering, for the cutting of the necessary width and for the easy feeding of material.
Oxygen Concentrators.
Line Efficiency     Percentage Month Today’s Date
Engineer Training Troubleshooting Theory TJ8300 / TJ8500 Troubleshooting Theory.
Section 4: Electric Motors
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Sunday, May 17, 2015 Pressure Booster Service. Sunday, May 17, 2015 Booster Service Basics Control Panel Components Setting a pressure switch Setting.
Overview The top seal mechanism consists of a foil unwinding and feeding mechanism and a cutting and welding mechanism. It is designed to cut out and weld.
One Corps Serving the Armed Forces and the Nation Navigation Lock and Dam Inspection and Emergency Repairs Workshop April 2006 Mel Price – Auxiliary.
HOW TO MAKE A CLIMATE GRAPH CLIMATE GRAPHING ASSIGNMENT PT.2.
Power Supply 24 VDC Pulse train Motor lines EtherCAT Electrical Schematic This system is used to drive the mechanisms that require accurate positioning.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
Vibration Monitoring & Machine Protection Systems Copyright 1999, Frank Howard, STI Vibration Monitoring, Inc. League City, Texas USA Reciprocating.
Water piping design.
Trouble shooting Before starting to work on a problem, first we have to understand the problem Once the problem is understood, we will try to “isolate”
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
Golden Valley Electric Assoc. Inc © 2012 GVEA. All rights reserved. GVEA BESS Expected and Actual Performance Dan Bishop Golden Valley Electric Assoc Fairbanks,
Virginia Employment Commission report to The Commission on Unemployment Compensation James Ellenberger, Deputy Commissioner Virginia Employment Commission.
Why Maintenance Tasks are Important Produced by Joe Marchese.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Paco Sanchez, RF Group, CELLS (Consortium for.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
ALL BELT CONVEYORS ARE SUPPORTED BY FREE BEARINGS 1. DRIVE PULLEY, 2. NON DRIVE PULLEYS 3. ROLLERS IN CARRYING AND RETURN SIDE.
Recycler/Ecool Shutdown Planning Meeting (6/4/2010)
Engineer Training XL1500 Mechanics. Engineer Training XL1500 Mechanics Confidential 2 The XL1500 is both a Roll to Roll and a Roll to Sheet Printing Machine.
18/March/2008OP-days S.Mataguez / O.Hans1 Hardware Problems in the PS complex LINAC 2 BOOSTER PS AD Thanks to all that helped and provided information,
TROUBLESHOOTING ELECTRIC MOTORS
delivered with the compressor
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
1 ) Infrastructure consolidation (TS/FM and TS/CE groups)
Safety matters needing attention
Small Sites Planning & Scheduling
Teleconference ACS – FREIA 31st October 2017
Fans & Heaters technical seminar
PLANNED MAINTENANCE ACTUAL CASE STUDY AMKOR / ANAM
Baltimore.
COSMO Priority Project ”Quantitative Precipitation Forecasts”
Fuel Supply System Service
Average Monthly Temperature and Rainfall
13-block rotation schedule
CORPUS CHRISTI CATHOLIC COLLEGE – GEOGRAPHY DEPARTMENT
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
PBIS Update December 2005.
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
HOW TO DRAW CLIMATE GRAPHS
Agricultural Marketing
Agricultural Marketing
Agricultural Marketing
Agricultural Marketing
Case study 3: SEASONAL ARIMA MODEL
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Agricultural Marketing
Correct Procedures for Changing, Storing, and Maintaining Saw Blades
Teleconference ACS – FREIA 19th June 2017
Confidential Oilfree Scroll Compressor   Simplex/Multiplex SRL kW   Troubleshooting Hitachi Industrial Equipment Systems Co., Ltd. Air Compressor.
Agricultural Marketing
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
PBIS Update January 2006.
2015 January February March April May June July August September
Presentation transcript:

2 EXECUTIVE SUMMARY MACHINE DOWNTIME CD BAR YR 2014/2015 CD BAR YR 2013 by % FEB 14 MAC 14 APR 14 MAY 14 JUNE 14 JULY 14 AUG 14 SEPT 14 OCT 14 NOV 14 DEC 14 JAN 15 TARGET MC D/TIME ACTUAL % TARGET PM100 SCORE CARD PM SCORE SHEET TARGET 85% MC D/TIME TARGET 8%

EXECUTIVE SUMMARY CD BAR MACHINE DOWNTIME ANALYSIS REPORT Downtime by Hours & Category Major Downtime CauseActionStatus Shot Blast - Motor don’t move as usual. ( Belt problem), Bar not shine (clogged dust collector) - Motor not balancing ( belting drop) & Concussion machine - Change new belting, rotation motor & setting impeller 1,2,3 & 4 - Change new belting & impeller Done on 8 Jan 2015 Done on 21 Jan 2015 Crane - Trip ( wire pendant cable short)- Change new wireDone on 15 Jan MACHINE FEB ’14 MA C ’14 AP R ’14 MA Y ’14 JUN ’14 JUL Y ’14 AU G ’14 SE PT ’14 O CT ’14 NO V ’14 DE C ’14 JA N ’15 PAY OFF STAND PRE-STG SHOT BLAST DRAWING CARRIAGE V-H ROLLER SHEARING PINCH ROLLER ROLLER DELIVERY TABLE ECT 0.00 KLN SHEAR CUTTING DUST COLLECTOR 0.00 POINTING 0.00 CRANE LASTIC COMPRESSOR 0.00 Cooling Tower TOTAL

CD MAINTENANCE COST ANALYSIS 2014/2015 (TOTAL REPAIR & MAINTENANCE + CHARGE OUT SPARE PART) Charge out above 1 Year, Shall be charge under depreciation

(TOTAL REPAIR & MAINTENANCE + CHARGE OUT SPARE PART BY MACHINE)

CD BAR COST DRAWING Date Item 3 FEB 4 FEB 5 FEB 6 FEB 7 FEB 8 FEB 9 FEB 10 FEB 11 FEB 12 FEB 13 FEB 14 FEB 15 FEB 16 FEB 17 FEB 18 FEB 19 FEB 20 FEB 21 FEB 22 FEB Actual Quantity Production Working Hours Rate/ Hour 1.3/ Hour 1.2/ Hou r 0.8/ Hou r 1.8/ Hou r 1.2 / Hou r 3.4/ Hou r 3.5/ Hou r 0.4/ Hou r 1.5/ Hou r 1.1/ Hou r 3.3/ Hou r 1.75 / Hou r 0 1/ Hou r 1.1/ Hou r / Hou r 0 Cost Drawing/Hou r 612 Drawing Cost/ Hour Target RM 612

4 Major Downtime Cause (data by history card)ActionStatus 1 Drawing Carriage -Machine can’t run (Bearing problem) -Arm contactor ( cant adjust jaw ) - Carriage no.2 jerk ( Cylinder no.2 problem) - Machine can not clamp (arm bush uprooted), Power supply for IO card problem -Bar scratch. Valve air not opened, Machine not consistent (Jerk). -Sequence drawing table problem (setting problem), Machine can’t auto (cylinder drawing 1 current jammed). Bar stuck at shooter pipe (have 2 bar in shooter pipe & Cylinder jammed (screw at cylinder loose) - Alignment & bearing problem - Change arm contactor - Change solenoid valve, cylinder & encoder. - Repair arm & change new IO card - Open valve, Check wiring, troubleshoot, solder wire & change encoder - Adjust setting, Change cylinder & pull out bar from shooter pipe & checking valve, air pressure and part cylinder Done on Feb 14 Done on March 14 Done on May 14 Done October 14 Done on November 14 Done on December Roller - Oil does not come out - Upper roll position do not follow the setting (ERROR) – (servo controller out alarm encoder for upper roll angel) - Alarm ( inverter fault) - Machine can’t auto ( DC controller burn), Machine can’t on ( PLC AX41C broke) - Change belting & 1 set motor pump. - Reset PLC, Check encoder upper roll position. Call PLC contractor, setting all program, parameter upper roller position by operator. -Change new inverter, resistance breaker & dynamic breaker circuit - Change new DC Controller & PLC AX 41C) Done on April 14 Done on July 14 Done on Sept14 Done on November 14 3Pre-Straightener -Charge out spare part. Charge out spare part. 4 Shot Blast - Guide fracture. -Bar scratch (guide bar at shot blast machine - bar jammed, belting failure (pulley jammed), Quality problem (liner leak) - Bar not shine - Alignment. -Repair/welding guide no.2 & replace new guide no.3, Change new belting, liner, adjust cylinder gate & clean up at small door - Change new belting, rotation motor & setting impeller 1,2&3 Done on April 14 Done on December 14 Done on Jan 15 TOP 4 MACHINE BREAKDOWN

Sapura Machining Corp Sdn Bhd 8 HIGHEST MACHINE BREAKDOWN IN JANUARY 2015 LINE: CD BAR MACHINE: DRAWING CARRIAGE/MEASURING ROLLER TYPE OF DAMAGE: BAR CUTTING NOT CONSISTANT/BAR SCRATCH TOTAL PRODUCTION: AVERAGE 10 TONNES PER DAY SPEED 30m/s LineCategoriesDepart.IssueCauseImmediately Action Quantity/ Frequency Part Price Total Prod Output CD Bar Machine Measuring Roller Maintenance Length bar cutting long/short after shear Encoder measuring unit fault Replace new encoder (28/01/15) 10 TimesRM 3.6 K 10 Tonnes per day speed 30m/s CD Bar Machine Horizontal vibration Roller Maintenance Bar scratch after drawing Bar stuck with jammed roller at vibration roller Overhaul with SMC refurbish team, temporary action to ensure machine can run. (26/01/15) to fabricate new shaft & bearing housing reverse engineering action 15 Times Waiting Quotation 10 Tonnes per day speed 30m/s CD BarDrawing DieTool & Die Bending NG for dia & Bending NG > 1.5mm Trial run on 4/3/15 Fuji Dies, Japan visit 5/3/15 100%¥ 25, Tonnes for 2 model

AFTER TAKE ACTION, PRODUCTION CAN RUN AN AVERAGE OF 15 TONNES PER DAY SPEED 45M/S - 50M/S. 28 JAN 2015, PRODUCTION ACHIEVED 31 TONNES SPEED 45M/S FOR SB31 DIA. 24 WITHOUT DEFECT MACHINEBeforeAfter Machine Measuring Roller Machine Horizontal vibration Roller ACTION PLAN

Sapura Machining Corp Sdn Bhd 10 HIGHEST MACHINE BREAKDOWN IN FEBRUARY 2015 LINE: CD BAR MACHINE: DRAWING CARRIAGE/MEASURING ROLLER TYPE OF DAMAGE: BAR CUTTING NOT CONSISTANT/BAR SCRATCH TOTAL PRODUCTION: AVERAGE 10 TONNES PER DAY SPEED 30m/s LineCategoriesDepart.IssueCauseImmediately Action Quantity/ Frequency Part Price Total Prod Output CD Bar Machine Measuring Roller Maintenance Length bar cutting long/short after shear Encoder measuring unit fault Replace3 new encoder (measuring, speed motor and shearing motor) (27/02/15) 10 TimesRM 3.6 K 10 Tonnes per day speed 30m/s CD Bar Machine Horizontal vibration Roller Maintenance Bar scratch after drawing Bar stuck with jammed roller at vibration roller Overhaul with SMC refurbish team, temporary action to ensure machine can run. (26/01/15) to fabricate new shaft & bearing housing reverse engineering action 15 Times Waiting Quotatio n 10 Tonnes per day speed 30m/s CD BarDrawing DieTool & Die Bending NG for dia & Bending NG > 1.5mm Trial run on 4/3/15 Fuji Dies, Japan visit 5/3/15 100%¥ 25, Tonnes for 2 model CD Bar Shot blastMaintenanceUneven cd bar surface Too many dust in steel shot Welding shot peening internal body and to replace original dust filter 100%Rm 28.8k3600 ton