Www.eurescom.eu FIA 2014 – 19.03.14 - Athens Dr. Didier Bourse Director European Research Cooperation Alcatel-Lucent - Bell Labs EC H2020 5G Infrastructure.

Slides:



Advertisements
Similar presentations
The role of NESSI in the Future Internet Frédéric Gittler, HP Labs NESSI SC Chairman NEXOF-RA Chief Architect.
Advertisements

Organisation: Botnia Living Lab hosted by Centre for Distance- spanning Technology ( Location: Luleå, Sweden Contact details:
Advanced 5G Network Infrastructure for the Future Internet From IoT to U-HDTV, ubiquity Restless Pressure on bandwidth, spectrum crunch Complex traffic.
Internet of Things and Platforms for Connected Smart Objects European Commission DG CONNECT Brussels. 23 rd October 2013.
Research and Innovation Research and Innovation Enabling & Industrial Technologies in Horizon 2020 Enabling & Industrial Technologies in Horizon 2020 Research.
FP7 from a large firm’s perspective EPP-ED Group Hearing on FP7 European Parliament, Brussels, September 22, 2005 Dr Jan van den Biesen MBA VP Philips.
European Network Technologies Connecting the Digital Society Future Networks EU Research for the ubiquitous ultrafast Internet of the future enabling every.
Telefonica I+D Our vision of a joint effort Fernando Fournon (President. Telefónica I+D) May 2011.
Slide title 70 pt CAPITALS Slide subtitle minimum 30 pt Opportunities for SME’s in the new Internet Landscape Dr. Fiona Williams
Digital public services and innovation
Stakeholder meeting on the SHIFT²RAIL Strategic Master Plan Manuel Pereira, IST Lisbon ERRAC Vice Chairman 20 th June 2014, Brussels 1.
International Cooperation International cooperation will be a cross-cutting issue in H2020; The approach will be similar to FP7 practice and may include.
Enhancing internationalization and innovation capacity through effective cooperation partnerships. Antonis FYSEKIDIS Innovation and Smart Specialisation.
Co-creating Living Labs Slide 1 An Introduction to the Living Labs Initiative and European Network of Living Labs Bring Science and Innovation.
1 Ideas About the Future of HPC in Europe “The views expressed in this presentation are those of the author and do not necessarily reflect the views of.
Jj/mm/yyyy An introduction to NESSI Frédéric Gittler HP Labs NESSI Steering Committee Vice-Chairman.
Research and Innovation Research and Innovation Research and Innovation Research and Innovation Research Infrastructures and Horizon 2020 The EU Framework.
HORIZON 2020 Budget and financial instruments Dr. E. Kakaras Prof. NTUA.
Delivering practical solutions
Agile Manufacturing Industries From Mechatronics to Collaborative Supply Chains Industrial Technologies Aarhus, 19 June Dr. Massimo Mattucci Session.
ICT 7: Advanced cloud infrastructures and services ICT 8: Boosting public sector productivity and innovation through cloud computing services Jorge GASOS.
The New EU Framework Programme for Research and Innovation EXCELLENT SCIENCE HORIZON 2020 Peter Fisch DG RTD A.5.
Environmental Compliance Assistance Programme for SMEs – and beyond Imola Bedő DG Environment C1 – Sustainable Production and Consumption Unit.
Policy Research and Innovation Research and Innovation SPIRE PPP in Horizon 2020 – What Impact ? Clara de la Torre DG Research and Innovation Director.
GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)
Director, DG RTD, Directorate International Cooperation
Open APIs for Open Minds Nuria de Lama, Atos Research & Innovation Future Internet Public Private Partnership in EU FI-WARE: Overview.
Mercè Griera i Fisa Smart Cities & Sustainability DG CONNECT – European Commission Smart Cities & Communities.
Research Obj.: ICT 26 – 2014: Photonics KET What are you looking for? Photonics: Major S&T and R&I progress to sustain competitiveness & leadership in.
ICT policies and the Lisbon Agenda Baltic IT&T 2005 Riga, 7 April 2005 Frans de Bruïne Director “Lisbon Strategy and Policies for the Information Society”
András Siegler - ERTRAC National Platforms Workshop, Budapest, 5/9/2008 The role of Technology Platforms in European Research ERTRAC National Platforms.
“The NESSI Strategy: The Way Ahead” BCI´07 Jose M. Cavanillas Vice-chairman NESSI Steering Committee Director Atos Origin – Research & Innovation.
1 ETP4HPC Background and Future ‘Building a Globally Competitive HPC Technology Industry in Europe’
Фондация ГИС Трансфер Център г. Sofia Лектор: Kostadin Kostadiov Проект: EURESP+, ENT/CIP/10/D/
ATTRACT – From Open Science to Open Innovation Information Sharing Meeting Brussels, June 19, 2014 Markus Nordberg (CERN) Development and Innovation Unit.
NHS European Office Accessing EU structural funding Michael Wood, European Policy Manager 25 July.
Policy Research and Innovation Research and Innovation HORIZON 2020 The EU Framework Programme for Research and Innovation NMBP part of Horizon 2020 Nicholas.
The 2012 European Cloud Computing Conference Brussels, 21 March 2012 Building the European Cloud Computing Strategy Carl-Christian Buhr (All expressed.
EU Projects – FP7 Workshop 6: EU Funding –What’s Next? Carolina Fernandes Innovation & Funding Manager GLE Group.
Photonics A Key Enabling Technology of Europe Berit Wessler Strategic Technology Cooperation OSRAM AG Board of Stakeholders, Photonics21.
The European Union R&D Landscape The Israel-Europe R&D Directorate For EU FP6 Rehovot, July 2006.
The EU framework programme for research and innovation.
Introduction to our reality
China July 2004 The European Union Programmes for EU-China Cooperation in ICT.
STOA Meeting Technology Transfer February 29, 2012 Dr. Gernot Klotz Cefic Research & Innovation.
NCP Info DAY, Brussels, 23 June 2010 NCP Information Day: ICT WP Call 7 - Objective 1.3 Internet-connected Objects Alain Jaume, Deputy Head of Unit.
Project overview Virtual Integrated Partnering (VIP) for SME service, technology and information providers in the European maritime sector Grant agreement.
Overview on European e-Infrastructure Augusto Burgueño DG CONNECT Porto, 18 June 2015 – GÉANT General Assembly.
5G PPP Stakeholders event From Phase 1 to Phase 2
UK Interest & Input to the Factories of the Future Horizon 2020 Roadmap. © ActionPlant 2011.
Phase 2 Pre-structuring Model
This project has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under.
IoT: Manufacturing Factories of the Future Patrick Kennedy.
ICT 25 Generic micro- and nano-electronic technologies Marc Boukerche DG CONNECT, A.4 Components.
NMBP : Cross-cutting KETs for diagnostics at the point-of-care co-funded by LEIT-NMBP (DG RTD) and LEIT-ICT (DG CONNECT) Opening 20 Sep 2016 Closing.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
Evaluation and Impact Assessment of European FP for R&D :
THE EU FRAMEWORK PROGRAMME
Public procurement of innovation
FET Plans FET - Proactive 1.
ICT NCP Infoday Brussels, 23 June 2010
EU Research and Innovation: Horizon 2020
Horizon 2020: Key Enabling Technologies R&I for industrial leadership
Dr. Didier Bourse PPP FR Info Workshop Paris
Platforms for Connected Smart Objects
Innovation in H2020 Net Futures
The roadmap towards the implementation of 5G in Europe
Juan Gonzalez eGovernment & CIP operations
ICT 29 : Development of novel materials and systems for OLED lighting
Director «Components & Systems»
Presentation transcript:

FIA 2014 – Athens Dr. Didier Bourse Director European Research Cooperation Alcatel-Lucent - Bell Labs EC H2020 5G Infrastructure PPP Overview

Commissioner Kroes called industry at Mobile World Congress 2013 in Barcelona “… And today I call on EU industry and other partners to join us in a Public-Private partnership in this area. An open platform that helps us reach our common goal more coherently, directly, and quickly. European 5G is an unmissable opportunity to recapture the global technological lead. And I hope you will be able to support and join us. …” 2 Source: EC Neelie Kroes Communication during MWC 2013 in Barcelona - Speech: Smashing barriers and thinking big ( ) EC Neelie Kroes Communication: Mobile communications: Fresh €50 million EU research grants in 2013 to develop '5G' technology ( ) G Infrastructure PPP History and Context (1/2)

Document “Industry Proposal” targeted in Spring 2013 “Stakeholders Group” (29 organizations) supported by Net!Works ETP and ETNO Association Series of letters sent in April 2013 to different associations and ETPs: ARTEMIS, Business Europe, DIGITALEUROPE, ENIAC, EPoSS, ETNO, GSMA, ISI, NEM, NESSI, Photonics21 Net!Works ETP used for public consultation on PPP “SRA” / Industry Proposal Section 2 ( ) Industry Proposal document communicated to EC Neelie Kroes Cabinet on Version completed on considering Assessors feedbacks on Industry Proposal received in July 2013 Work on potential Programme / Projects structuring since June 2013 Setting up of « New Net!Works » (Net!Works + ISI) ETP on Setting-up of the 5G Infrastructure Association in December 2013 Signature event of the EC H2020 PPP contracts on in Brussels 3 5G Infrastructure PPP History and Context (2/2)

5G Infrastructure PPP Website 4

Faster, More Powerful and More Energy Efficient Solutions for integrated High Capacity Access and Core Networks for a Wider Range of Services Wireless Networks Optical Networks Automated Network Organisation - Network Management and Automation Implementing Convergence Beyond the Access Last Mile Re-Designing the Network Information Centric Networks Network Function Virtualisation Software Defined Networking Networks of Clouds Ensuring availability, robustness and security Ensuring efficient hardware implementations 5 5G Infrastructure PPP R&I Strategy Source: Annex to 5G Infrastructure PPP Contractual Arrangement.

PPP Programme that will deliver solutions, architectures, technologies and standards for the ubiquitous 5G communication infrastructures of the next decade Programme Ambitions: Key Challenges / High level KPIs Providing 1000 times higher wireless area capacity and more varied service capabilities compared to 2010 Saving up to 90% of energy per service provided. The main focus will be in mobile communication networks where the dominating energy consumption comes from the radio access network Reducing the average service creation time cycle from 90 hours to 90 minutes Creating a secure, reliable and dependable Internet with a “zero perceived” downtime for services provision Facilitating very dense deployments of wireless communication links to connect over 7 trillion wireless devices serving over 7 billion people Enabling advanced User controlled privacy 6 5G Infrastructure PPP Key Challenges & KPIs (1/2) Source: Annex to 5G Infrastructure PPP Contractual Arrangement.

Business-related KPIs Leverage effect of EU research and innovation funding in terms of private investment in R&D for 5G systems in the order of 5 to 10 times Target SME participation under this initiative commensurate with an allocation of 20% of the total public funding Reach a global market share for 5G equipment & services delivered by European headquartered ICT companies at, or above, the reported 2011 level of 43 % global market share in communication infrastructure Performance KPIs Providing 1000 times higher wireless area capacity and more varied service capabilities compared to 2010 Reducing the average service creation time cycle from 90 hours to 90 minutes (as compared to the equivalent time cycle in 2010) Very dense deployments to connect over 7 trillion wireless devices serving over 7 billion people Secure, reliable and dependable Internet with a “zero perceived” downtime for services provision Societal KPIs Enabling advanced User controlled privacy Reduction of energy consumption per service up to 90 % (as compared to 2010) European availability of a competitive industrial offer for 5G systems and technologies New economically-viable services of high societal value like U-HDTV and M2M applications Establishment and availability of 5G skills development curricula in partnership with the EIT 7 5G Infrastructure PPP Key Challenges & KPIs (2/2) Source: Annex to 5G Infrastructure PPP Contractual Arrangement.

8 5G Infrastructure PPP Gouvernance Gouvernance source: Annex to 5G Infrastructure PPP Contractual Arrangement.

 PPP is an ambitious Programme with ambitious KPIs  More than a group of standalone projects working together through Concertation & Clusters meetings and activities  Pre-structuring Model  Ensuring that the right set of projects will work together  Model focused on projects not proposals as such  Possible set of projects scopes, their interfaces and the possible cross-issues between projects  Example of Energy Efficiency to be seen as “by design”  Possibility to have proposals submitted according to the model (“guideline”)?  Possibility to then have EC reviewers making their best selection to fill one project with the best corresponding proposal (“guideline”)?  Avoiding duplication (“hype”) and gaps issues?  Association Working Document (version 1.0)  Consultation to be organized by the Association and incl.  5G Infrastructure PPP session during FIA 2014 on in Athens  Info Day on in Issy Les Moulineaux (Orange) 9 5G Infrastructure PPP Pre-structuring Model

Complementary PPPs Progress on services (e.g. Future Internet PPP) is accelerating the already high pressure for improved Infrastructure(s) Need to advance networks (e.g. 5G Infrastructure PPP) to ensure the optimal user experience and EU Leadership SMEs role in Future Internet and 5G Infrastructure PPP 10 Source: EC NetSoc CSA - FI and 5G PPP - Poster 5G Infrastructure PPP EC PPPs and SMEs

Current analysis of possible 5G Infrastructure PPP experimentation, pilots, demonstrations What can be existing EC FP7 basis / foundation (Network Technologies, FIRE, eInfrastructures)? SMEs engagement 5G Infrastructure PPP 20% KPI Solid SME momentum in the ETP SB and Association (6 Members) New Net!Works ETP SME Working Group Act as representative / interlocutor of SMEs in the ETP and PPP Reinforce the SME impact and RoI in projects participation Reinforce the SME network by connecting SMEs actions at EC level (e.g. in the context of Future Networks inc. PPP) and at National levels (e.g. in the context of National (competitive) Clusters) Cross-PPPs action 11 5G Infrastructure PPP FIRE and SMEs Perspectives