Moving Armor Target (MAT) Track Jacob Feist Cleon Stanley Thomas Hutton Sladana Lazic 03/30/2006.

Slides:



Advertisements
Similar presentations
Water Penetration Testing Device
Advertisements

Dhara Amin, Michael Brennan, Eric DiBlasi, Andrew Smith
Team Members: Jon DixonMatt SacksDarrin BeamNathan Murray
Mast Storage Rack NNSY Sean Ellis, Philip Crist, Max Carpenter, Gershom Obeng.
Parts of typical slab formwork
SPL Intercavity support Conceptual design review 04/11/ A. Vande Craen TE/MSC-CMI.
A New Launcher for University Sounding Rockets
Enu-LIFT Sheet-Follower A Product of Enutron Automation.
Bending Moments A bending moment exists in a structural element when an external force is applied to the element so that the element bends (or wishes to.
Structural Collapse Technician Training
Center of gravity and Centroids Part 2 MET 2214
PROJECT 100. PROJECT 100 DESIGNED TO BE: Cost Effective Compact Strong Simple Light Reliable.
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
Team Flying Sheep Engineering Analysis Mark Berkobin John Nevin John Nott Christian Yaeger Michelle Rivero.
EQUILIBRATE SYSTEM UPGRADE Systems Design Review.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
P11310: Parabolic Dish Autopoint Solution Project Family Team Leader: Trae Rogers (ME) Project Engineer: Pat Ryan (EE) Kyle Norlin (ME) Chris Reed (CE)
By: Joseph Martinez University of Michigan Supervisor: Dave Pushka, NuMI Project 3Q120-M Quadrupole Magnet Transport.
Manufacturing Work Cell Redesign for Sentry Group of Rochester (02001) Kyle HagadornJacob Feldman Julie AllenChris Isaacson Carolyn StrockErik Tracy.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
COMPOSITE BODIES Today’s Objective:
Improved Honeycomb Expander Levi Gordy Karl Grabczewski Andy Olenderski Stephanie Swain Team Alcore.
Home Work #7 Due Date:29 April, 2010 (Turn in your assignment at the mail box of S581 outside the ME general office) The solutions must be written on single-side.
Michael Brantley 2, Ryan Ferm 2, Nadia Siddiqui 2, Jason Newton 1, Reginald Scott 1 1 Department of Mechanical Engineering, Florida State University, Tallahassee,
Wheelchair Design in Developing Countries: Redesigning the Trike Frame Fiona Hughes, Gina Policelli, Ashley Thomas, and Jodie Wu; Massachusetts Institute.
SofaKing: The Lazy-Man Futon Chris Wooldridge Loren Hankla Ankur Desai JT Stukes Barrett Evans John Pendley.
Vision Integrated Electric Wheelchair Kit (VIEW Kit) Team Wheelchair Visionaries (12) Siddharth Kuncham, Douglass Roman, Peter Arriaza, Neil Zhang Team.
EDMUND FINLEY TRISHA LOWE NICK MENCHEL ANNA SLEETER BOLIVIA BRIDGE: FINAL DESIGN.
Applications Involving Rational Equations Sec. 2.8b.
ET 493 Instructor: Dr. Koutsougeras By Rhett Falcone and Scott Dauzat Advised by Dr. Mitra.
STATE WIDE SIGN GUIDE This guide will demonstrate various sign mounting products and procedures for construction and maintenance.
COMPOSITE BODIES (Section 9.3) Today’s Objective: Students will be able to determine the location of the center of gravity, center of mass, or centroid.
Calculating Components. Vector Projections It often becomes necessary to find the projection of one vector across the length of another. When this is.
How much wood is in that tree? How much is that tree worth?
NCSX Modular Coil Turning Fixture FDR. Background Modular Coil winding forms are cast structures which provide the foundation on which the coils are constructed.
Engineering 309: Machine Design I Instructor: Dr. Min Lu Presented by: Mike Kraft Thanh Nguyen.
Sustainable (Backpack) NIMS Interns: Dor Yisrael Ashur (UCSD) Aerospace Engineer Olmo Fabian Maldonado Gomez (UTSA) Electrical Engineer Week 5: WPM, Overview,
Specifications for JOOLZ 409- based on the current prototype (as taken by AOK)
EXAMPLE 4 Find the height of an equilateral triangle Logo
Easel 5000 New Adjustable Easel. Overview  Introduction  Project Description  Market Analysis  Similar Patents  Preliminary Designs  Optimal Design.
Group 10 Anthony Muller Gerald Tyberghein Joshua Wood.
P13458: Dresser-Rand Compressor Assembly Line Team Members: Lauren Kraft –Project Manager, Nick Feng – IE Cole Bowden – ME, Shawn Moseley – ME Jordon Boggs.
MAST STORAGE RACK Philip Crist Max Carpenter Sean Ellis Gershom Obeng.
Frame Overview A36 Steel square tubing and plate Frame will rest on four wheels or two air skids 90” Long, 30” wide- outside CG envelope Two carts for.
Shield Module Design Considerations Adam Carroll Van Graves July 3, 2014.
Engineering/Failure Analysis
1 MC Assembly over the VV FPA Station 3 FDR Review July 13, 2007 T. Brown.
Model Rocketry Saturn Phase
Front Suspension Design Final Report Solomon Metcalf Kevin Beckford Jumaane Palmer Daniel Atsyor.
Garage Door Design Analysis
Engineering Analysis October 23, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher Sampson Michael Widerquist.
Standout Technical Designers MAE 416: ME Senior Design Sponsored by Cooper Hand Tools Brian SearsNate Ouellette Pooria Javidi Nathan Mize Chris EvansJustin.
Front Suspension Design Final Report Solomon Metcalf Kevin Beckford Daniel Atsyor.
ASD Beam Design Bending – – lateral stability – unbalanced combination of laminations (gluelam) Shear – Deflection – Bearing (for a rectangular beam)
WyoBaja 2011 SAE Mini Baja Competition Team Leader Suspension Frame
Measure Phase Automated Palm Pruner Presented by: Obie Abakporo Bill Carpenter William Craig Juan Antonio Rojas Christopher Xavier Smith Sarah Trayner.
Engineering Analysis & Updated Layout Drawings SofaKing 9 March 2005.
STRAW TRACKER SYSTEM CAD STATUS :
End of Line “Pass Through” Conveyor
Solenoid Yoke Door-Barrel Connection
Escalator Installation
Equilibrate System upgrade
P08002-Automated Parallel Bars
ActivRAC® 7M Mobilized Storage System
COMPOSITE BODIES Today’s Objective:
Structures & Buckling Developed by: Lane Azure Bob Pieri Chad Ulven.
COMPOSITE BODIES Today’s Objective:
SAE Mini Baja: Powertrain
Moonbuggy ME Capstone Design Project SP 2006
Presentation transcript:

Moving Armor Target (MAT) Track Jacob Feist Cleon Stanley Thomas Hutton Sladana Lazic 03/30/2006

Agenda: Project Scope Project Scope Review of Initial Designs Review of Initial Designs Review Final Design Review Final Design Assembly Assembly Problems and Solutions Problems and Solutions Final accomplishments Final accomplishments

Project Scope Portable and lightweight Portable and lightweight Use Commercial Off The Shelf (COTS) items Use Commercial Off The Shelf (COTS) items Interlocking parts that can be transported in a commercial truck Interlocking parts that can be transported in a commercial truck Reduced cost through reduced labor and maintaince Reduced cost through reduced labor and maintaince Mount on any soil base with minimum preparation Mount on any soil base with minimum preparation

Project Specifications Length of Track 1000 ft – 1800 ft Elevation of Track Up to 20 inches Minimum Radius of Track 430 ft Slope Grade of the Track -5 to +5 degrees Maximum Weight of Track Components 150 lbs MAT Weight 2100 lbs MAT Dimensions 7 ft by 22 ft MAT Speed 55 ft/s

Review of Initial Designs Base Design Elevation Design Main Frame Design

Review of Initial Designs Insert Rail interlocking

Final Design Final concept is a fusion of previous ideas. Final concept is a fusion of previous ideas. Angled side supports are used to add stability to the design. Angled side supports are used to add stability to the design. Crossbars are moved in order to adjust the height of the rails. Crossbars are moved in order to adjust the height of the rails.

Final Concept: Primary Components Crossbar: Main Support:

Final Concept: Primary Components Breaking Support: Side Arm:

Assembly Assemble the Main Base Supports Assemble the Side Angled Supports

Assembly Add Crossbars to the Main Base Supports Add Side Angled Supports

Assembly Connect the Main Rails to the Crossbars using the insert Repeat the steps above and add to the first part

Assembly Final Assembled View

Calculations: Main Rail Weight: Less that 150 lbs, the max weight as set by sponsor Less that 150 lbs, the max weight as set by sponsor 90 lbs should be easy to move and handle 90 lbs should be easy to move and handle

Calculations: Main Rail Bending Stress: The total stress in the beam is less than the yield stress The total stress in the beam is less than the yield stress Gives a Factor of Safety of 2.4 Gives a Factor of Safety of 2.4 This shows that the main rail will support the total weight of the test cart This shows that the main rail will support the total weight of the test cart

Calculations: Main Rail Deflection: Rail bends downward with most weight expected Rail bends downward with most weight expected Displacement approximately 1/8 inch Displacement approximately 1/8 inch Some deflection expected, 1/8 inch small enough to be tolerated Some deflection expected, 1/8 inch small enough to be tolerated

Problems and Solutions Design Design Cost/Budget Cost/Budget Order stalled due to financial difficulties Order stalled due to financial difficulties Storage of material Storage of material Transportation of material Transportation of material Machining Machining Assembly Assembly

Final Accomplishments Easier assembly: Easier assembly: Simple collar-pin design; minimum tools Reduced assembly time: Reduced assembly time: one section: ~5min 34sec full track: ~22hrs Smaller assembly team: Smaller assembly team: three people Mobility: Mobility: all part weigh less than 150 lbs Height and terrain adjustable Height and terrain adjustable

Questions