CRITICAL REPAIR OF KALAUPAPA DOCK STRUCTURES: HONORING THE PAST, PROTECTING THE FUTURE.

Slides:



Advertisements
Similar presentations
Hex Box Breakwaters On Potomac River at low tide. A pier is being built right up to the breakwater and using it to provide calm water for the dock.
Advertisements

ANTON VOREK Kunín 316, TEL FAX: Business premises Malá strana č.p. 234, , Suchdol nad Odrou
Deep ExperienceLocal Focus Widest Range of TechnologiesBroad Customer BaseGrowth Platform Global Scale SEE goes north of the polar circle Christian Sigmund,
Chemical Analysis of Water
Materials Used in Civil Engineering.
CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
The guide Carlos Cantú. First look the location…. East of London in the county of Kent. The major part of the area we will study lies within the Reculver.
Click to continue…. Railroad Track wetland Image Date: December 2003.
OCEN 201 Introduction to Ocean & Coastal Engineering Coastal Processes & Structures Jun Zhang
1 The Grain Drain Boston New York Washington, DC Miami Dune areas on the continental shelf caused by breaking waves are called sand bars. Waves pile up.
1 Armour Ranch Road Bridge Emergency Repairs SB County Project Number 01STRM R015 Storm Damage caused during March 5 th 2001 storm.
Subpart R Steel Erection. Workers of the past were sometimes referred to as “Dare Devils.”
Building Strong! IHNC SURGE BARRIER GIWW MRGO. Building Strong! Trestle Construction About 2000’ of trestle allows precision installation of piles and.

Shipyard Layout. Big Bigger Biggest Manufacturing Processes.
WAVE INDUCED SET UP, MARINA DI PISA, ITALY. For background see….. PDF Link: Pranzini & Farrell_ICS_2004.pdf.
TED 316 – Structural Design
Building Walls Have one main purpose, to support roofs and ceilings such walls most often have three or more separate components. In today construction,
Conwy Estuary Strategic Route Project Progress Photographs.
FOFFF.
COASTAL EROSION How can we prevent our beaches from washing away?
CURRENT PORT OPENING COMPANY DESIGN. PORT OPENING COMPANY MISSION: PROVIDE SPECIALIZED ENGR SUPPORT IN OPENING, REHABILITATING, MAINTAINING PORT FACILITIES,
MASONRY. Introduction Masonry→ construction of buildings units bonded together with mortar The building units →bricks, stones or precast concrete, Depending.
Types of Sea Defence These forms of sea defence are very expensive.
Chilmark Menemsha Harbor Phase 3. Menemsha Boathouse Fire July 2010.
Bridge Abutment Repair Old King’s Road Location; Old King’s Road N
A Combined Solution for Sediment Remediation and Waterfront Development A Combined Solution for Sediment Remediation and Waterfront Development John T.
Research and Development Inland Waterways Conference 7 March 2007 Improved Hydrodynamic Design/Detection and Evaluation of Scour at Dams John E. Hite,
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
Basic Hydraulics: Bridges. Definition & terminology Abutments Flow contraction.
Where In The World Is Fort McRee?. Fort McRee: Then….
Masonry Foundations 3/25/2011. What is a Masonry foundation Basically a Masonry Foundation is a foundation constructed of brick, block, or mortar and.
The building of structures from small individual units laid in and bound together by mortar Some common materials you ca find in this practice are brick,
AHU-18 replacement and AHU-16 & 17 restoration
Kitsap County SMP Work Group August 2, Shoreline Armoring - Outline Welcome – Introductions Background reading materials Existing Permit Process.
Building Materials Architecture Humanities Adkins.
Marine Dock Facilities. Marine Dock Facilities Project Experience  Design and inspection of construction of New Oil Docks – Port of CC  Rehabilitation.
Rebuilding the chimney next to the large group shelter.
David Smith, Project Manager GZA GeoEnvironmental, Inc. February 13, 2015 Blynman Canal and Stacy Boulevard Bulkhead Improvement Projects 1.
Museum of Islamic Art Project Package # 3 Site Logistics and Progress Presentation.
The Malahide Railway Viaduct Group 15: Harry Griffin & Carl O’Sullivan.
Professional Landscaping Company in Victoria, BC
RETAINING WALL STONE CONTRACTORS IN VICTORIA, BC.
بسم الله الرحمن الرحیم. Jet grouting.
Get in touch with the best Dry stack stone Contractor in Victoria BC | TimberHawkHomeBuilders.
Wrong installation of window frame Wrong installation of window frame.
Biological engineering and gabion constructions in coast protection
WEE WAH LAKE DAM AND POND No. 3 DAM REHABILITATION PROJECT
Coastal Erosion and Management
Using Superplasticizer in Masonry Grout
Coastal Erosion and Management
Grout and Other Reinforcement Module
Preserving Our Coastline and Ourselves with Architectural Advances
Mosaic Vocabulary 1) Mosaic- Is the art of creating images for decorative art or interior decoration with an assemblage of small pieces of colored glass,
L - Walls BEFORE AFTER DESCRIPTION:
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Organics Waste Processing Facility Construction Progress Update December 15, 2010
Prepared for - tusharhsonawane.wordpress.com
Gatchalian, Rein Edrian Hernandez, Diana Erika Ramos, Aira Coline
Introduction.
The Grain Drain ME Dune areas on the continental shelf caused by breaking waves are called sand bars. Boston Waves pile up large deposits of ocean sand.
Illinois Waterway 2020 Consolidated Closure

STREAM CROSSINGS Constructed crossings allow animals safe access to water and protect streambanks Place where animals like to cross. Use gravel, geotextile,
Lake 16 Dam Repair Presentation
Virginia’s Rock & Mineral Resources

The wonderful world of marinas
BUILDING CONSTRUCTION Foundation
Presentation transcript:

CRITICAL REPAIR OF KALAUPAPA DOCK STRUCTURES: HONORING THE PAST, PROTECTING THE FUTURE

Turbidity curtain installed to isolate low dock and bulkhead wall work areas, protecting the harbor and nearby waters from effects of construction.

Repairing extensive concrete damage on dock structural components.

Grouting voids in the bulkhead wall.

View of the completed project, with the construction barges still in the harbor. New armor stones can be seen protecting the breakwater, dock, and bulkhead wall.

Repaired breakwater: large voids in the concrete and rock masonry structure were grouted, and larger armor stones were placed to protect the wall from high seas.

Repaired concrete breakwater cap, and newly placed larger armor stones to protect dock and breakwater.