CDF CDF Operations Steve Hahn February 7, 2005 All Experimenters ’ Meeting.

Slides:



Advertisements
Similar presentations
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Advertisements

Steve Hahn, CDF Meeting - October 7, CDF Operations Summary Shutdown progress  Work finishing up in west and east bores COT  Loose cables SVX 
CDF Operations Bob Wagner, ANL May 09, 2005 All Experimenters’ Meeting.
Bob Wagner, ANL Dec 15, 2005 CDF Weekly Meeting
CDF Steve Hahn January 13, CDF Operations Summary Thurs. Fri. Sat. Mon. Tues. Wed. Stores long enough for accounting in bold Don ’ t believe! Generally,
Far Detector Data Quality Andy Blake Cambridge University.
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
Lukens - 1 Run IIb Project Motivations Integrated luminosity or duration of the run motivates us to  Replace the silicon detector - Radiation damage to.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
3/24/2003CHEP'03, La Jolla, USA Object Database for Constants: The common CLEO Online and Offline solution Hubert Schwarthoff Cornell University With N.
25-May-03 jadzia warchol, ext. 8341, phone Calibration of FPD detector Content Page General2 Calibration 3 Taking data (Calibration or Pedestal.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Jennifer Thompson Western Michigan University Fermi National Accelerator Lab PST Program July 29, 2008 Mentors: Steve Hahn and JJ Schmidt.
FNAL Users’ Meeting, 06/02/03, p. 1 Top and Electroweak Results from CDF Igor Volobouev LBNL for the CDF Collaboration.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
Level 3 Trigger Leveling D. Cutts(Brown), A. Garcia-Bellido(UW), A. Haas(Columbia), G. Watts(UW)
Time Meeting 3/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
D. Still-FNAL/Tevatron HALO '03 Tevatron Collider II Halo Removal System Dean Still Fermilab Tevatron Department 5/21/2003 Motives for the Collider Run.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
Accessing PBeast and monitoring the L1 trigger Emily Thompson.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 1/13 CDF  Stato del Tevatron  Stato del rivelatore  Upgrades in corso  Richieste finanziarie.
Arnd Meyer (RWTH Aachen) July 18, 2003Page 1 Data Taking July 11 – 18 Store # BeginLumDuration 2774Thu 15:373.3E hrs 2780Fri 20:403.6E hrsTRF4.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
Nov 1, 2002D0 DB Taking Stock1 Trigger Database Status and Plans Elizabeth Gallas – FNAL CD (with recent help from Jeremy Simmons, John Weigand, and Adam.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
Online Monitoring System at KLOE Alessandra Doria INFN - Napoli for the KLOE collaboration CHEP 2000 Padova, 7-11 February 2000 NAPOLI.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
Dmitri Denisov D0 Weekly Summary: May 4th to May 11th  Delivered Luminosity and operating efficiency u Delivered 7.3pb -1 u Recorded 6.3pb -1 (86%) 
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
Vienna Group Discussion Meeting on Luminosity CERN, 9 May 2006 Presented by Claudia-Elisabeth Wulz Luminosity.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
LAV thresholds requirements Paolo Valente. LAV answers for Valeri’s questions (old) 1.List of hardware to control (HV, LV, crates, temperatures, pressure,
All Experimenters MeetingDmitri Denisov Week of December 23 to December 30 D0 Summary  Delivered luminosity and data taking efficiency u Delivered: 5.8pb.
Online Consumers produce histograms (from a limited sample of events) which provide information about the status of the different sub-detectors. The DQM.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
1 Run IIb Event Builder upgrade Director’s Review Jan Steve TetherRon RechenmacherMarkus KluteBruce Knuteson MITFNAL/CDMITMIT RonSteve Motivation.
Overview of EMU Software Rick Wilkinson. Slice Test DAQ We succeeded in using Slice Test DAQ code to take test beam data, combining chamber and trigger.
News and Related Issues Ted & Kirsten May 27, 2005 TDWG News since last meeting (April 29th) Organization Issues: how to improve communication Future Plans:
Arnd Meyer (RWTH Aachen) July 21, 2003Page 1 Data Taking July 14 – 20 Day∫L dt (del)∫L dt (rec)Efficiency Mon 956nb nb % Wed 111nb nb.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
Controlling a large CPU farm using industrial tools
Commissioning of the ALICE HLT, TPC and PHOS systems
Kevin Burkett Harvard University June 12, 2001
Status of the TOF Detector
Tracker Software Status
Mini Tower Preliminary Results
Presentation transcript:

CDF CDF Operations Steve Hahn February 7, 2005 All Experimenters ’ Meeting

CDF 2 Store Summary (01/31–02/07) Store Start Date Duration (hours) Initial Instantaneous Luminosity (10 30 cm -2 s -1 ) Delivered Integrated Luminosity (nb -1 ) Live Integrated Luminosity (nb -1 ) / % / % / % / % / % / % Total %

CDF 3 CDF Operations *Difficult trigger problems being resolved  VRBs (data concentrators) take data from multiple front-end crates. Multiple VRBs in a crate send data through the crate ’ s SCPU (scanner CPU) to ATM switch and then EVB (event builder) for assembly into full-blown events  This is downstream of L1 and L2 decision. Any logjam here results in “ busy ” deadtime. Problems we were seeing were large total deadtimes with a large fraction (up to 90%) due to “ busy ” deadtime.  Problem appears to be due to problem in VRB crate. After swapping VRBs and power cycling crate, deadtime decreased. After swapping out SCPU, deadtime may be normal. At L =1.13  10 32, initial deadtime was 25% and L3 rate was 400 Hz, as good as before problems started. Appears to be SCPU was taking longer to read out, but need to pinpoint source of problem. äIn process of debugging, developed more detailed diagnostics for VRBs, SCPUs, EVB, and L3. Will become part of routine monitoring. äNow can get back to working on trigger budget to be ready for higher luminosities.

CDF 4 CDF Operations  “ CSL pointer space ” äChange in number of trigger bits has to be implemented in hardware EVB, software (calibration) EVB, CSL (consumer server logger), online consumer code, offline production code, online calibration consumer code. Latter was last step preventing implementation. äIn process of updating online calibration consumers, rebuilt many that were very old since last build. Tested all calibrations through to calibration DB and histograms. äNext big push for new TDC DSP code and data format for faster readout time. *Efficiency (~80%) larger than we would like: äStill taking many test runs  Larger rate of muon arch “ miniskirt ” trips – perhaps due to water spill on chambers  Larger rate of beam loss related problems (our guess) — HV power supply µ P problems (SVX and plug), FRAM contents scrambled (shower max), and COT TDC problems, despite beam losses near beampipe  Many runs adds downtime due to 5 – 10 minute run initialization

CDF 5 CDF Operations *Store 3953 (Monday) äDeadtime at worst 18% after F. Chlebana swaps VRB14 before this run *Store 3956 (Tuesday) äLong run (2.11 nb-1) marked bad due to SMX LUT table failure (beam losses?) at end; definite candidate for recovering much data with run sections  Replaced SW CEM Gamma HV bulk power supply with new Gamma – drifting V continuously *Store 3958 (Thursday) äShort store due to quench  Initial deadtime at L =1.13  is 25% with L3 trigger rate of 400 Hz — good! *Store 3962 (Friday)  One SVX ladder removed – ladder previously known to give problems äSVX D-mode calibration *Store 3968 (Sunday) äSVT board replaced after 2 hours downtime äPulsar tests at end of store *Store 3969 (Sunday) äCOT TDC crate needs expert help to recover

CDF 6 CDF Run IIB Detector

CDF 7 CDF Run IIB Detector (inner)