Set Aside Treatability Guidelines Brent Means U.S. Office of Surface Mining.

Slides:



Advertisements
Similar presentations
PREDICTION AND ASSESSMENT OF IMPACTS – SURFACE WATER ENVIRONMENT (SWE)
Advertisements

Internal Assessment Your overall IB mark (the one sent to universities after the IB test) in any IB science course is based upon two kinds of assessments.
HIPAA Security Presentation to The American Hospital Association Dianne Faup Office of HIPAA Standards November 5, 2003.
Introduction to Concurrency Management. What is Concurrency? Chapter , F.S. requires Comprehensive Plans to adopt a concurrency management system,
School Leadership that Works:
The role of information in water-related decision making.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Status of Pennsylvania’s AMD Set-Aside Program By Pam Milavec Bureau of Abandoned Mine Reclamation Bureau of Abandoned Mine Reclamation.
1 Vendor Evaluation: Selecting for Success Dana McCormick Wells Fargo Home Mortgage Delivery Services Baltimore PCC Education Seminar April 27, 2007.
REGULATORY ACCEPTANCE OF POST-CLOSURE CARE INNOVATION Mr. Charles G. Johnson Colorado Department of Public Health and Environment Hazardous Material and.
9.Monitoring Plan + 10.Implementation Plan + 4. LAs* 5. WLAs* 6. MOS* 7.Seasonal Variation* 8.Reasonable Assurance + TMDL Process 1 Problem Understanding.
BRC Storage & Distribution Safety and Quality Management System Training Guide
Chapter 15 Application of Computer Simulation and Modeling.
Solid Waste Systems Planning Develop Scenarios for future Solid Waste Management Create a review process for the TAC Organize the Subgroup proposals to.
The ISO 9002 Quality Assurance Management System
Challenge Question: How would I like my performance on the job to be evaluated ? Self-Test Questions: 1.Why are some types of skills better assessed through.
WM Software Process & Quality Generic Processes - Slide #1  P. Sorenson SPiCE Reference Model - how to read Chapter 5 Capability Levels (process.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Scaling and Attitude Measurement in Travel and Hospitality Research Research Methodologies CHAPTER 11.
Classroom Assessment A Practical Guide for Educators by Craig A. Mertler Chapter 5 Informal Assessments.
Conducting the IT Audit
Enhancing assessment capacity For teachers of Authority and Authority-registered subjects.
Data Mining CMPT 455/826 - Week 10, Day 2 Jan-Apr 2009 – w10d21.
ORGANIZATIONAL STUDY Is concerned with HOW and By WHOM the project should be executed and operated so as to established RESPONSIBILITY and ACCOUNTABILITY.
9 Closing the Project Teaching Strategies
Performance Measurement and Analysis for Health Organizations
An Update on the Development of Mine Drainage Treatability and Project Selection Guidelines for SMCRA Title IV Funded Projects Ramada Inn Conference Center.
Ten years of Evaluability at the IDB Yuri Soares, Alejandro Pardo, Veronica Gonzalez and Sixto Aquino Paris, 16 November, 2010.
STANDARDS FOR THE PRACTICE RECREATIONAL THERAPY (ATRA, REVISED 2013) HPR 453.
Classroom Assessments Checklists, Rating Scales, and Rubrics
Risk Assessment. Risk As defined by Kaplan and Garrick, risk analysis consists of answering three specific questions: what can happen? what is the chance.
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
Presented by: Meg Boyd The Blue Mountains Drinking Water System: DWQMS Overview.
The aim / learning outcome of this module is to understand how to gather and use data effectively to plan the development of recycling and composting.
Evaluating a Research Report
Classroom Assessment A Practical Guide for Educators by Craig A. Mertler Chapter 7 Portfolio Assessments.
© 2011 Underwriters Laboratories Inc. All rights reserved. This document may not be reproduced or distributed without authorization. ASSET Safety Management.
CCSSO Criteria for High-Quality Assessments Technical Issues and Practical Application of Assessment Quality Criteria.
1 Survey of the Nation’s Lakes Presentation at NALMS’ 25 th Annual International Symposium Nov. 10, 2005.
Chapter 12 Evaluating Products, Processes, and Resources.
University of Palestine Dept. of Urban Planning Introduction to Planning ( EAGD 3304 ) M.A. Architect: Tayseer Mushtaha Mob.:
CONDUCTING A PUBLIC OUTREACH CAMPAIGN IMPLEMENTING LEAPS IN CENTRAL AND EASTERN EUROPE: TRAINERS’ HANDBOOK Conducting a Public Outreach Campaign.
Programme Objectives Analyze the main components of a competency-based qualification system (e.g., Singapore Workforce Skills) Analyze the process and.
Session 9 & 10. Definition of risk assessment and pre condition for risk assessment Establishment of clear, consistent agency objectives. Risk assessment.
1) Establish & Identify Scheme 5) Evolve Scheme 4) Review & Modify Scheme Deliverables 3) Operate the Framework 2) Manage Performance Assurance Scheme.
Copyright Keith Morrison, 2004 CURRICULUM DESIGN AND DEVELOPMENT.
Fair Value Measurement By: Feras Alghamdi Shawneen Kelly Austin Tullos Meredith Whitaker.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
N ational Q ualifications F ramework N Q F Quality Center National Accreditation Committee.
CEM CEM – 520 Measuring the Effectiveness of Materials Management for Industrial Construction Projects in Saudi Arabia Thesis By Ali Al-Darweesh.
Prepared By: Razif Razali 1 TMK 264: COMPUTER SECURITY CHAPTER SIX : ADMINISTERING SECURITY.
Swedish Risk Management System Internal management and control Aiming to Transport Administration with reasonable certainty to.
Logical Framework Approach 1. Approaches to Activity Design Logical Framework Approach (LFA) – Originally developed in the 1970s, this planning process.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Selection Criteria and Invitational Priorities School Leadership Program U.S. Department of Education 2005.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Qualifications Wales Update. -To ensure that qualifications and the qualification system in Wales are effective for meeting the reasonable needs of learners.
Beach Modelling: Lessons Learnt from Past Scheme Performance Project: SC110004/S Project Summary.
Development of Assessments Laura Mason Consultant.
Group 1 Pages
Classroom Assessments Checklists, Rating Scales, and Rubrics
Maintenance BC - NZTA assessment in TIO
The UK Quality Code and Chapter B9
Classroom Assessments Checklists, Rating Scales, and Rubrics
What to do with legacy designs?
Treatment – Plant Design
TRTR Briefing September 2013
Principal Investigator ESTCP Selection Meeting
Internal Control Internal control is the process designed and affected by owners, management, and other personnel. It is implemented to address business.
Principal Investigator ESTCP Selection Meeting
Presentation transcript:

Set Aside Treatability Guidelines Brent Means U.S. Office of Surface Mining

Introduction The SA program is ~ 14 years old The AML reauthorization provides an opportunity and reason to perform a review of the SA program The workgroup was formed to produce guidelines that would form the basis for future project selection The guidelines contain both project selection and treatability criteria

Project Selection and Treatability Document: Guiding Principals SA program should be expanded to consider any type of treatment (not just passive) Achieving and maintaining restoration is most important Restoration should be done in a “comprehensive” manner

The goal of the criteria is to ensure the proposed treatment or abatement strategy is an appropriate match for the water quality and site conditions Treatability Criteria The treatability scoring is based on three evaluations: 1. A “Proven” evaluation: focused on evaluating whether the proposed scenario is proven to provide treatment 2. A “Reliability” evaluation: an operational evaluation 3. A “Predictable” evaluation: a maintenance evaluation The proposed treatment project is evaluated against the criteria for each of the three assessments, resulting in an overall score for the Treatability section of the document

1.is successfully used at numerous locations under treatment scenarios similar to the proposed project; Proven Evaluation 2.is sized or manufactured using a science-base approach that can be evaluated 3.has a data-supported performance record A “proven” technology is a treatment or abatement technique that:

1.Can achieve the treatment/abatement goals > 90% of the design life; A “reliable” treatment or abatement technology is one that: Reliable Evaluation 2.Can be operated and maintained to consistently achieve treatment/abatement goals; 3.Can be manipulated to achieve treatment/abatement goals under varying flow, chemistry, and operational conditions;

1.contains troubleshooting capacity; Predictable Evaluation A “predictable” treatment or abatement technology is one that: 2.can be maintained or rehabilitated if the treatment/abatement goals are not being achieved; 3.has maintenance flexibility built into the treatment scheme;

Set Aside projects are arranged into 6 Categories 1. Active Treatment 2. Passive Treatment of Net Alkaline discharges 3. Passive Treatment of Net Acidic discharges using ALD 5. Innovative Technology 6. Abatement projects All SA projects fit into one of these categories and evaluated against the “Proven”, “Reliable,” and ‘Predictable” scoring criteria 4. All other types of Passive Treatment for Net Acidic water

Example using Active Treatment Proven Evaluation: ** Can automatically receive a high proven score if it is commonly used to achieve water quality based standards in similar situations 1.is successfully used at numerous locations under treatment scenarios similar to the proposed project; 2.is sized or manufactured using a science-base approach that can be evaluated 3.has a data-supported performance record 4.Other factors that affect the “Proven” evaluation

Example using Active Treatment Reliable Evaluation (deals with operational issues) : 3.Evaluate whether the proposed system can be manipulated to achieve treatment/abatement goals under varying flow, chemistry, and operational conditions 2.Evaluate whether the proposed system can be operated and maintained to consistently achieve treatment/abatement goals; 1.Evaluate the likelihood that the recommended system can achieve the treatment/abatement goals > 90% of the design life; 4.Evaluate whether the proposed system be operated to achieve varying degrees of treatment  Ability to continue treatment during desludging  Ability to achieve treatment goals under the range in hydrologic and geochemical conditions characterized at the site  Ease of operation 5.Other factors that affect “Reliability” evaluation:

Example using Active Treatment Predictability Evaluation (deals with maintenance issues) :  Sludge handling  Time frame between chemical replenishment 3.Evaluate whether the proposed system contains maintenance flexibility built into the treatment scheme; 2.Evaluate whether the proposed system can be easily maintained or rehabilitated if the treatment/abatement goals are not being achieved; 1.Evaluate the whether the proposed system contains the capacity to easily troubleshoot operational problems; 4.Other factors that affect the “Predictability” evaluation  Time frame between desludging events  Longevity of sludge storage volume

1.Active Treatment - covered Treatability Evaluation 4.All other types of passive treatment for Net Acidic discharges using passive Treatment 3.Passive Treatment of Net Acidic Discharges using ALDs 2.Passive Treatment of Net Alkaline Discharges  Scoring is affected by sludge handling, sludge storage volume, addresses the effects of temp., etc.  Promoted by automatically receiving a high “proven” score  Ease of troubleshooting system, sludge handling, rehabilitation plan

Treatability Evaluation 4.All other types of passive treatment for Net Acidic discharges using passive Treatment Proven Evaluation:  Discharge characteristics are compared against risk matrix to obtain a score  Risk Matrix was developed on the premise that passive treatment (e.g. VFP) best performs (longevity, maintenance) on low-loading discharges  The intent of the risk matrix is to provide a structured approach for project selection that would be continuously refined as projects are completed and performance is field-validated

All other Passive Treatment on Net Acidic water Reliability Evaluation: 3.Evaluate whether the proposed system can be manipulated to achieve treatment/abatement goals under varying flow, chemistry, and operational conditions 2.Evaluate whether the proposed system can be operated and maintained to consistently achieve treatment/abatement goals; 1.Evaluate the likelihood that the recommended system can achieve the treatment/abatement goals > 90% of the design life; 4.Evaluate whether the proposed system be operated to achieve varying degrees of treatment  Ability to control flow into the system  Ease of treatment operation  Ability to continue treatment during desludging or rehabilitation events 5.Other factors that affect “Reliability” evaluation:

All other Passive Treatment on Net Acidic Water Predictability Evaluation (deals with maintenance issues) : 3.Evaluate whether the proposed system contains maintenance flexibility built into the treatment scheme; 2.Evaluate whether the proposed system can be easily maintained or rehabilitated if the treatment/abatement goals are not being achieved; 1.Evaluate the whether the proposed system contains the capacity to easily troubleshoot operational problems;  Time frame between rehabilitation events  Ability to monitor the progression of plugging 4.Other factors that affect the “Predictability” evaluation  Ease of troubleshooting treatment system  A plan to dispose of compost or limestone

Treatability Evaluation 5.Innovative Technology  AML money is not permitted for “research” activities  Innovative Technologies would be subject to a “proven, reliability (operation), and predictability (Maintenance) ” evaluations 5.Abatement Projects  Abatement Projects would be subject to a “proven, reliability (operation), and predictability (Maintenance) ” evaluations  The background data should be sufficient enough to show the cause/effect relationship between the mining feature and the affected water resource

THE END