F.G. Garcia X37981 chopper Linac cable tray Cable penetration Overall View from the Linac Bridge Beam direction.

Slides:



Advertisements
Similar presentations
MERIDIANS AND PARALLELS
Advertisements

Tribal Tata ACE Branding - Pictorial Representation.
Finding Latitude and Longitude
Altitude Azimuth 3 rd Coordinate System Your zenith Your zenith 180 degrees from you zenith is Nadir directly on the other side of earth 180 degrees from.
MTA Installation Progress Report June 8, MTA Installation Web Page F.G. Garcia AD/Proton.
In The Name of ALLAH Project Of Chapter 1 Diving Deception Pass WELCOME.
Finding Your Way in the World
Temporary shielding for the 20" vertical penetration Igor Rakhno November 17, 2008.
A. Bross MTA RF WS August 22, Welcome MTA RF Workshop.
CAMPAN VALLEY RESIDENTIAL LAYOUT PROJECT PHOTOS-FEBRUARY 15 th 2015.
Elevations.
How can you find an exact location of a place?
Position and Motion Section 1.1.
Accident scenarios for MTA beam line Igor Rakhno June 8, 2007.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
Noise analysis- operations 6 ft. panel on west side of guide way 4 ft. panel on east side of guide way.
Location September 2011.
20 Minute C-11, 10 Minute N-13 and 2 Minute O-15 Gas Emissions from BLIP Collider-Accelerator Department Take 5 for Safety.
Building Plans.
Recent BTH West Vibration Study for LCLS-II James L. Turner and Alev Ibrahimov February 07, 2012.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
MC Beamline Tom lackowski L1 Manager. Project Organization Jan. 2013T. Lackowski - MC Beamline2.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
V.Dzhordzhadze1 The Tunnel Background Source Study Vasily Dzhordzhadze University of Tennessee Trigger Upgrade Meeting BNL, April 12, 2004.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
 Learn about some of the elements of a map. You will be able to identify and define the following elements: Longitude Latitude Prime Meridian Equator.
Latitude and Longitude Theme 1: Location. Test Your Knowledge  T or F: Lines of latitude run from east to west.  T or F: Lines of longitude run from.
Canada and Mexico What country does this map represent?
Chapter Review. 1. Two forces are applied to a stump by two tractors. One is a 150 N force to the east. The other is 100 N in a direction 35°
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
L-band test stations in End Station B Richard Swent.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
MTA Installation Meeting March 7, 2007 Agenda 1)Progress report (Fernanda) 2)Water skid discussion (Maurice) 3)Alignment needs (O’Sheg + all) 4)AOB Key.
Latitude measures the vertical axis, which describes how far north or south a location is. The zero point for latitude is the equator. To the north, the.
Physics 2D Motion worksheet Selected question answers.
Using Graphs to Show Information
MTA Installation Meeting February 21, 2007 Agenda 1)Progress report (Fernanda+Carol) 2)Floor Plan layout (Fernanda+Larry) 3)AOB Key Red – critical Orange.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Mrs. King Pre-Calculus Applications of Right Triangles.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
 Grid Systems -how to locate places on a map. Alphanumeric Grid  This type of grid system uses letters and numbers to identify squares in a grid pattern.
Framing Vocabulary Stud: upright beams in the framework of a building
Longitude & Latitude Grid Maps.
Desirable BCM Performance
Where is Saint Lucia Located?
What type of angle is it?.
How to Use Longitude and Latitude
Latitude and Longitude
Latitude and Longitude
Reaction Forces and Moments
Potential Use of PEP-II Magnets by Project X
Objective- To find the slope of a line given
Map Skills.
Question & Suggestions March 17th
Latitude and Longitude
8.5: Angles of Elevation and Depression
Latitude and Longitude
Shadows Page E101.
مديريت موثر جلسات Running a Meeting that Works
Drawing Walls for a Room
Math 180 Packet #9 Related Rates.
Weight hangs motionless
Latitude and Longitude
Latitude and Longitude
TOPIC: - GRID REFERENCE
LOCATION.
Rack Placement Chopper Workshop
Presentation transcript:

F.G. Garcia X37981 chopper Linac cable tray Cable penetration Overall View from the Linac Bridge Beam direction

F.G. Garcia X37982 Standing East side and looking South Cable penetration from Linac Lower level Linac cable tray ~36ft from ½ Q74 quad to bypass wall Chopper Bypass wall

F.G. Garcia X37983 penetration ~4in (?)

F.G. Garcia X37984 Future MTA cable tray/LCW header path ~36ft horizontal run from ½ Linac Q74 up to wall ~10ft vertical run ~ 15.5 ft horizontal run from East to West bypass walll

F.G. Garcia X37985 Future MTA cable tray/LCW header path ~ 15.5 ft horizontal run from East to West bypass walll

F.G. Garcia X37986 Path for future cable tray LCW water ~ 62 ft horizontal run from bifurcation wall to shielding wall