CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.

Slides:



Advertisements
Similar presentations
CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India HO-EDR Presentation, 10th June, 1999.
Advertisements

Prototype sPHENIX Calorimeters
Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
Victor KRYSHKIN 9th Topical Seminar Innovative Particle and Radiation Detectors, Siena, 24 May 2004 PRODUCTION AND QUALITY CONTROL OF CMS END CAP HADRON.
NLC – The Next Linear Collider Project Colorado Univ. - Boulder Calorimetry-Arlington Calorimetry Detector Study Plans at Colorado Uriel Nauenberg for.
Quartz Plate Calorimeter Prototype Ugur Akgun The University of Iowa APS April 2006 Meeting Dallas, Texas.
HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
Calorimeter1 Understanding the Performance of CMS Calorimeter Seema Sharma,TIFR (On behalf of CMS HCAL)
1 Study of the Tail Catcher Muon Tracker (TCMT) Scintillator Strips and Leakage with Simulated Coil Rick Salcido Northern Illinois University For CALICE.
KEK beam test H. Sakamoto. Purpose To optimize a concentration of the second dopant for scintillating fibers KEK beam test to study light yields for various.
02/10/2004 Minimum Bias Trigger Scintillator Counters (MBTS) for early ATLAS running M.Nessi ATLAS week, Freiburg.
Slide 1 Diamonds in Flash Steve Schnetzer Rd42 Collaboration Meeting May 14.
Application of Neural Networks for Energy Reconstruction J. Damgov and L. Litov University of Sofia.
Status of CLAS12 PCAL project
NuMI Schematic View of the MINOS Scintillator System 8 m Scintillator Module WLS Fibers Optical Connector Clear Fiber Ribbon Cable (2-6 m) Multiplex Box.
Study of response uniformity of LHCb ECAL Mikhail Prokudin, ITEP.
Beam test of scintillator strips Miho NISHIYAMA Shinshu University ・ scintillator strip calorimeter ・ Kuraray scintillator strips and KNU extruded ・ the.
Status of Projectile Spectator Detector A.Kurepin (Institute for Nuclear Research, Moscow) I. Introduction to PSD. II. Conception and design. III. Development.
Beam test results of Tile/fiber EM calorimeter and Simulator construction status 2005/03/05 Detector Niigata University ONO Hiroaki contents.
Proposal for participation in Si-PM testing and Upgrade work HEP Group Department of Physics Panjab University Chandigarh M. India-CMS meeting,
R&D on W-SciFi Calorimeters for EIC at Brookhaven E.Kistenev, S.Stoll, A.Sukhanov, C.Woody PHENIX Group E.Aschenauer and S.Fazio Spin and EIC Group Physics.
CALORIMETER system for the CBM detector Ivan Korolko (ITEP Moscow) CBM Collaboration meeting, October 2004.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
The Tungsten-Scintillating Fiber Accordion Electromagnetic Calorimeter for the sPHENIX Detector Craig Woody, for the PHENIX Collaboration Physics Department,
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Electromagnetic Calorimeter for the CLAS12 Forward Detector S. Stepanyan (JLAB) Collaborating institutions: Yerevan Physics Institute (Armenia) James Madison.
Upgrade of the CMS hadron outer calorimeter with SiPM’s
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
CMS Calorimeter HB- HB+ HE- HE+ HF- HF+ HO-2 HO-1 HO0 HO+1 HO+2
The ZEUS Hadron-Electron-Separator Performance and Experience Peter Göttlicher (DESY) for the ZEUS-HES-group Contributions to HES Germany, Israel, Japan,
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002.
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
January 21, 2007Suvadeep Bose / IndiaCMS - Santiniketan 1 Response of CMS Hadron Calorimeter to Electron Beams Suvadeep Bose EHEP, TIFR, Mumbai Outline:
08-June-2006 / Mayda M. VelascoCALOR Chicago1 Initial Calibration for the CMS Hadronic Calorimeter Barrel Mayda M. Velasco Northwestern University.
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
CBM ECAL simulation status Prokudin Mikhail ITEP.
Mechanics and granularity considerations of a Tile hadronic calorimeter for FCC hh barrel Nikolay Topilin/Dubna+ Sergey Kolesnikov/Dubna Ana Henriques/CERN.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Scintillator Strips DongHee Kim Kyungpook National University Daegu, South Korea.
P. Checchia ECFA-DESY Prague1 Status report of the tile-Si Lccal * project Prototype description Production Beam test results Future plans *
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Magnetized hadronic calorimeter and muon veto for the K +   +  experiment L. DiLella, May 25, 2004 Purpose:  Provide pion – muon separation (muon veto)
V. Korbel, DESY1 Progress Report on the TESLA Tile HCAL Option To be filled soon.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
LC Muon Detector Development Overview Hardware R&D Goals Hardware Configuration Design Issues Procurement, Engineering, Manpower Additional Development.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Strip Scintillator DongHee Kim Kyungpook National University Daegu, South Korea.
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
Geant4 Tutorial, Oct28 th 2003V. Daniel Elvira Geant4 Simulation of the CMS 2002 Hcal Test Beam V. Daniel Elvira Geant4 Tutorial.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
FT Prototype Test Purpose: test the prototype of the FT Calorimeter and Scintillator Hodoscope Technique: prototype is installed under the Hall B photon.
Performance of Scintillator-Strip Electromagnetic Calorimeter for the ILC experiment Satoru Uozumi (Kobe University) for the CALICE collaboration Mar 12.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
The ICD Project Alan L. Stone Louisiana Tech University All D0 Meeting - 7 September 2001.
P. Checchia LCWS02 Jeju1 Lccal * : an R&D project for the Electromagnetic barrel Calorimeter Design principles Prototype description Status of.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
Simulation and reconstruction of CLAS12 Electromagnetic Calorimeter in GSIM12 S. Stepanyan (JLAB), N. Dashyan (YerPhI) CLAS12 Detector workshop, February.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
India in CMS J.B. Singh Panjab University Chandigarh, India
Experimental Method: 2 independent detectors on both sides of IP
Scintillation Detectors in High Energy Physics
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Study of a Scintillating Digital Hadron Calorimeter Prototype
Rick Salcido Northern Illinois University For CALICE Collaboration
Experimental Method: 2 independent detectors on both sides of IP
The MPPC Study for the GLD Calorimeter Readout
Presentation transcript:

CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India

CMS Collaboration meeting, June 99 Need for HO  In the central region, HB is not thick enough to contain hadronic shower fully, particularly those fluctuated showers which develop deep inside the HCAL.  Need to extend HCAL outside the solenoid magnet and make additional sampling of the shower.  This part outside the magnet coil is referred as Outer Hadron Calorimeter (HO)

CMS Collaboration meeting, June 99 HO Location Geographically located just below the muon system and hence is constrained by the geometry of the muon system.

CMS Collaboration meeting, June 99 HO Coverage  HO covers the central rapidity region (  < 1.26) occupied by the five Muon Rings. ( numbered as -2,-1,0,1,2)  For Ring 0, there will be two HO layers ( Layer 0 & 1) on either side of the 18 cm thick tail catcher iron at R=3.82 m and 4.07 m  For Rings -2,-1,1 & 2, there will be a single HO layer ( Layer 1) at R= 4.07 m

CMS Collaboration meeting, June 99 Simulation Study  Use CMSIM Version 113 for CMS detector simulation  Use tracker geometry as in post-ECAL pre-Tracker TDR  Use ECAL geometry as in ECAL TDR  Barrel inner hadron calorimeter with 17 layers in front of the coil  HO consists of:  Two layers in ring 0 on either side of the tail catcher iron  One layer in rings 2,1,-1 & -2  Showers are generated using GEANT for electromagnetic and GHEISHA for hadronic component

CMS Collaboration meeting, June 99 Simulation Study Effect of leakage is visible from 70 GeV and increases with energy Effect of leakage is smaller at higher 

CMS Collaboration meeting, June 99 Simulation Study Energy resolution: The constant term improves after addition of HO Fraction of events having measured energies 3  below the mean value Leakage is < 1%

CMS Collaboration meeting, June Test beam results Energy Resolution Leakage

CMS Collaboration meeting, June 99 Simulation Study Effect of HBO on missing energy QCD events

CMS Collaboration meeting, June 99 Design Consideration  Basic Detector Elements should map the barrel hadron Calorimeter (HB) towers of granularity X in  &   Should be able to see MIPs as it is located at the tail end of the shower. MIP signal is also needed for calibration purposes. 10 mm thick Bicron BC408 scintillator to be used as the active element. Use 0.94 mm dia WLS Kuraray double clad fibers (in  shaped grooves), spliced to clear fibers to carry light to HPDs located on the outer edge of the muon system

CMS Collaboration meeting, June 99 HO Tile design  Light from individual tile is collected using WLS fiber.  Fibers are held inside the tile in keyhole type grooves  There will be 4 identical  shaped grooves per tile.  HO has 95 different tile dimensions, 75 for layer 1 and 20 for layer 0.  Total number of tiles

CMS Collaboration meeting, June 99 HO Tray Design  All the tiles in the same  slice of a ring will be packed as a single mechanical unit called the “tray”.  It will cover the entire length of a muon ring along Z.  Along , it will only be one tile wide ( 5 0 )

CMS Collaboration meeting, June 99 HO Tray Assembly  Tiles in a tray will be covered with tyvek and tedler.  Will be sandwiched between two plastic plates of 2mm and 1mm thickness for mechanical stability and ease of handling.  2mm thick plastic cover will have grooves to route the fibers from tiles to edge connector.  Additional groove for the source tube

CMS Collaboration meeting, June 99 Partial picture of a tray

CMS Collaboration meeting, June 99 Full Tray

CMS Collaboration meeting, June 99 Light collection  Clear fibers spliced to WLS fiber will transport scintillation light to an optical connector located at the edge of the tray.

CMS Collaboration meeting, June 99 Optical Cable Routing Optical cables made of 0.94 mm diameter clear fibers carry light from the tray connector to the HPDs located in a Decoder box outside the muon system

CMS Collaboration meeting, June 99 Pre Production Prototype Sector Aim: To test a small number of modules using test beam to establish the production procedure and to optimise the detector design: PPP1: Cover 20 0 in  and one half barrel ( 2 and 1/2 rings) in Z Need: 8 half length Trays ( 1.27 m) for ring 0 8 full length Trays ( 2.54 m) for rings 1 & 2 # of Tiles : 76 # of pigtails : 32 These Trays were exposed to test beams at CERN in the summer of 98 PPP2: Additional 8 trays made and transported to CERN this year to cover one  sector completely for this year’s combined run with HB and HE modules

CMS Collaboration meeting, June 99 Test Beam Modules PPP tile with 4  grooves visible Pigtial with connector Finished Tray

CMS Collaboration meeting, June Test Beam Setup

CMS Collaboration meeting, June 99 Test Beam Results Response of the HO tiles was measured  With Cosmic ray Muons (with PMTs) at TIFR  With muon beams at CERN  Using HPDs with D0 pre-amplifier electronics  Using HPDs with QIE prototype electronics ( Proof of principle)  Using radioactive wire source  Using X-Y scanner

CMS Collaboration meeting, June 99 Cosmic Test Setup

CMS Collaboration meeting, June 99 Test Beam Results Pedestal subtracted muon ADC signal from a ring 0 HO tower- (layer 0 and layer 1 combined) Signal = 34.7,  p = 9.4, S/N = 4 Pedestal subtracted muon ADC signal from a ring 1 tile ( Single layer). Signal = 18,  p =10, S/N = 1.8

CMS Collaboration meeting, June 99 Test Beam Results Fine scan of an HO tile ( Tile # 124) using 2 cm X 2cm beam spot to test tile uniformity

CMS Collaboration meeting, June 99 Test Beam Calibration LED data was used for calibration of individual channels.

CMS Collaboration meeting, June 99 Photo Electron yield due to MIP For HO tiles, we have estimated p.e. yields using test beam muon spectrum and the LED calibration data Ring 0 Tiles Ring 1 Tiles

CMS Collaboration meeting, June 99 Source Calibration HO trays have also been calibrated using wire source scanner as well as X- Y source scanner

CMS Collaboration meeting, June 99 HO with QIE + HPD Muons could be seen in HO with the QIE + HPD contained within 2 time slices of 40 MHz.

CMS Collaboration meeting, June 99 HO Status  Need for an Outer Hadron Calorimeter (HO) in the barrel region has been established. Simulations and test beam results show that HO will improve the energy resolution and is necessary for physics involving missing Et.  We have a detailed Engineering design for HO.  We have tested Pre-Production Prototype (PPP) Modules with HPD readouts using muon beam at CERN in Results show that we are sensitive to MIPs which is one of our design goals.  We have also tested these modules using radioactive wire source as well as using X-Y source scan.  Through the exercise of producing the PPP modules, we have developed all the tools and necessary procedures for QC/QA and are ready to enter the production stage.

CMS Collaboration meeting, June 99 HO Technical Board Within India-CMS collaboration we have a Technical Board to discuss and decide on various technical issues related to HO. Current Members of the Technical Board:  Naba K Mondal (Coordinator)  Atul Gurtu  M.R.Krishnaswamy  K.Sudhakar  J.B.Singh  R.S.Koppikar  S.N.Ganguli (India-CMS contact person)

CMS Collaboration meeting, June 99 HO Task Coordinators  Naba K Mondal : Technical Coordinator  M.R.Krishnaswamy : Incharge of overall Quality Control  J.M.Kohli : Incharge of the Chandigarh Center

CMS Collaboration meeting, June 99 Production Responsibilities  Machining of Scintillator tiles will be done at two centers  25% of tile grooving and the necessary QC will be done at Chandigarh  75% of tile grooving at Mumbai ( TIFR & BARC)  All the remaining jobs will be done at the Optics Centre, TIFR, Mumbai with participation from Chandigarh group  Procurement of all raw materials ( Scintillator sheets,WLS and Clear fibers, Tyvek and Tedler sheets, plastic sheets, cutters etc) will be done through the mumbai center.  Shipment of all the trays will be done through the Mumbai centre