1 Advances in stonedusting. 2 I will talk about and show footage relating to I will talk about and show footage relating to the basics about Stonedust.

Slides:



Advertisements
Similar presentations
Personal Protective Equipment (PPE)
Advertisements

COSHH ASSESSMENT TRAINING Essential Elements of a COSHH Form.
Barhale Procedure for Site Establishment
Lessons Learned from the Application of Risk Management in the Shipment of LNG.
QUEENSLAND AND NSW MINES RESCUE SERVICES Emergency Mine Entry/Re-entry and Knowledge Management Presenter Geoff Nugent.
HYDROCARBONS | MINERALS, METALS & CHEMICALS | INDUSTRIAL & INFRASTRUCTURE | POWER WATER & DEVELOPMENTS Bulk Materials Conveyor Dewatering.
© the Design and Technology Association Health and Safety Training Standards in Design and Technology S8HS PLANER/THICKNESSER MACHINE Specialist Extension.
Note To Management This training program is designed to inform management of the requirements of the Hazard Communication Program. This training program.
100% Natural – 100% Effective FOG Elimination Program.
OHIO STATE UNIVERSITY EXTENSION Ohio Pesticide Applicator Training Unit 3 Formulations.
NFPA ELECTRIC VEHICLE SAFETY FOR EMERGENCY RESPONDERS Module II : Basic Electrical Concepts And Hazards Module II : Basic Electrical Concepts And Hazards.
OVERVIEW AUSTRALIAN BLACK COAL MINING OPERATIONS Ken Cram Project Manager Coal Services Pty Limited.
Hazardous Substances Cleaning Agents or 1 1 Heath Hazard Safety Hazard.
Module 4: Storage and Dispensing Locations. 2 Objective Upon the successful completion of this module, participants will be able to discuss common and.
UTILIZATION OF BOOSTER FANS IN UNDERGROUND COAL MINES
Mine explosions Introduction Worst explosions Yearloss of livesPlace Germany Japan Japan India Yugoslavia USA.
Hunter Valley | Wollongong | Mackay Engineering | Protective Coatings | Mining | Equipment Hire | Rail ALFABS.
Dr. Kyle Perry, P.E. PEM Seminar – September 5, 2014.
Austar Coal Mine The Positive Pressure Chamber Austar Coal Mine & Joncris Sentinel Services Proactive: - Spontaneous & Combustible Gas Management - Seal.
Control and regulation of boiler operation Heat Engines & Boilers.
Chemical Handling/Hazards All Chemicals Are Hazardous PDO has 785 chemicals Rejected 22 Carcinogens 7 (e.g, Benzene, Crystalline Silica, Asbestos) A cigarette.
Standard 29 CFR Part Welding, Cutting and Brazing Training.
Coal Burning System.
Fundamentals of Information Systems, Second Edition
Preservation of Wood.
Module 4: Storage and Dispensing Locations
CENTENNIAL HYDRAULIC ISOLATION CONTROL SYSTEM (CHICS) Peter Bergin Trevor Hartley Centennial Newstan In conjunction with APT Training.
12 th U.S./North American Mine Ventilation Symposium John Ascuaga’s Nugget Casino Resort Reno, NV, USA June 11, 2008.
Lease Automatic Custody Transfer
Alarmline Linear Heat Sensor Typical Applications.
UN ECE Sectoral Initiative on Equipment for Explosive Atmospheres 7 September 2011 United States Department of Labor Mine Safety and Health Administration.
SITE SAFETY HAZARDS AND PROCEDURES. ELECTRICAL HAZARDS  Electricity is a serious workplace hazard.  Employees can be exposed to dangers such as : 
Metallurgy Mining of Ores Ore Concentration or Dressing Metal Extraction.
Personal Protective Equipment
You will work in groups All groups play…In turn…Out of turn Scoring (In Turn)…Right – 4 chips Wrong – loss 2 chips Help…50/ chips… Ask the Group.
How Force Directions were Determined Distortions of other structures such as Wire Mesh (shown here) were used to determine direction of forces. Severity.
Version One Naturally Occurring Radioactive Material Awareness Training Course.
BondChem TECHNICAL DATA Roll-a-crete ( Three Component Cementitious Waterproof Coating ) Page 1 / 2. DESCRIPTION BondChem’s Roll-a-crete is a three component.
Basic Isolations and Lock Out. Disclaimer  IMPORTANT: The information in this presentation is of a general nature, and should not be relied upon as individual.
Technologies and Equipment to Control and Improve UNDERGROUND MINE SAFETY Lunagas Pty Limited Beijing, CHINA, Beijing, CHINA, April 2004 Les Lunarzewski.
Lesson 5 November 5 th, Lightning Lightning storm safety begins by watching for towering cloud formations that signal developing storms. Lightning.
Dr. Joel J. Ducoste, North Carolina State University, 1 Importance of water “Water is life” Looking at water, you might think that it's the most simple.
To achieve a level 3 your work must show that: With some help you can gather information to help with designing your project You can draw suitable ideas.
DUST EXPLOSION PREVENTION RONALD C. JESTER University of Delaware, Extension Safety Specialist.
NEXT SLIDE. 06:26 am 1 st Left crew arrives at section switch.
I.C. ENGINES LECTURE NO: 08 (24 Mar, 2014). Combustion Formulas Combustion is a chemical reaction in which certain elements of the fuel combined with.
Control of Airborne Respirable Dust Hazards: A Training Program for Underground Coal Miners The Penn State Miner Training Program University Park, PA
Combustible Dust Preventing and Mitigating the Effects of Fire and Explosions Developed by Western Iowa Tech Community College This material was produced.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Water Pollution . 5 minutes – mark the roll
Penn State The Penn State Miner Training Program
Hazard Management Plans Moura Mine’s Highwall Mining Approach.
CKSFERTILIZERS. ABN pH Modifiers Internationally there are many acidifying agents or pH modifiers that act to bind or inhibit ammonia.
Mark J. Schultz, P.E. Chief, Environmental Assessment and Contaminant Control Branch Dust Division Mine Safety and Health Administration Pittsburgh Safety.
Mine Emergency Preparedness Training Mine Recovery.
Experience with Mining through Surface to Seam Large Diameter Boreholes. 26/11/14 Scott Dennis – Appin Mine.
1 Section 4: Health and Safety  Health and safety is the #1 Design Consideration All oxidants Site Information Oxidant-specific.
If you are providing respiratory protection you have, or will arrange face fit testing. You have undertaken a task specific risk assessment and determined.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
The C.I. Engines Fuel System  The C.I. engine demands that the fuel supplied is –  Timed to inject when the piston is near the end of the compression.
August 2005 EMS & Trauma Systems Section Office of Public Health Preparedness RADIOLOGICAL NUCLEAR EXPLOSIVE.
Excavation & Trenching Awareness Plus
Electronic Fuel Injection
Solutions Mining.
Who Wants to be a Miner? Sample Question You will work in groups
Rock Dusting in Coal Mines
Working in a Coal Mine By Stephanie & Rosita.
MINING.
Module 4: Storage and Dispensing Locations
Presentation transcript:

1 Advances in stonedusting

2 I will talk about and show footage relating to I will talk about and show footage relating to the basics about Stonedust the basics about Stonedust methane and coal dust explosions methane and coal dust explosions why previous wet dusting attempts failed why previous wet dusting attempts failed ACARP project C Advances in wet slurry dusting ACARP project C Advances in wet slurry dusting how the slurry additive process works how the slurry additive process works and look at the equipment involved in the process and look at the equipment involved in the process Some information within this presentation is well known by the coal industry. It has been included to provide a summary of how various elements interact. Some information within this presentation is well known by the coal industry. It has been included to provide a summary of how various elements interact.

3 Stone dust Stone dust or calcium carbonate is used in underground coal mines as a primary inerting agent, in the prevention of coal dust explosions. Stone dust or calcium carbonate is used in underground coal mines as a primary inerting agent, in the prevention of coal dust explosions. The application of dry stone dust creates large quantities of airborne dust along the ventilation circuit, requiring the extraction of inbye personnel. The application of dry stone dust creates large quantities of airborne dust along the ventilation circuit, requiring the extraction of inbye personnel. In a methane explosion, a pressure pulse travels through the immediate area of the mine. In a methane explosion, a pressure pulse travels through the immediate area of the mine. This wave raises any dust into suspension, both coal and stonedust. This wave raises any dust into suspension, both coal and stonedust. Areas treated with adequate quantities of stone dust, will render the dust cloud inert and a coal dust explosion will not occur. Areas treated with adequate quantities of stone dust, will render the dust cloud inert and a coal dust explosion will not occur.

4 Methane The ignition of methane in an underground mine is not common but does occur. The ignition of methane in an underground mine is not common but does occur. Friction sparks from continuous miner and shearer drum picks have provided ignition sources for methane gas. Friction sparks from continuous miner and shearer drum picks have provided ignition sources for methane gas. Other potential sources are cable flashes, belt friction, heating and open fires. Other potential sources are cable flashes, belt friction, heating and open fires. Given the right conditions a methane explosion itself is most explosive at 9% general body and has deadly consequences. Given the right conditions a methane explosion itself is most explosive at 9% general body and has deadly consequences. The following footage is a weaker explosion that compares to a typical 10 metre overdrive allowed to accumulate a methane concentration of only 7.5%. The following footage is a weaker explosion that compares to a typical 10 metre overdrive allowed to accumulate a methane concentration of only 7.5%. If an ignition source is present…………. If an ignition source is present………….

5 7.5% Methane Explosion

6

7

8 Coal dust Minimising the make of coal dust and reducing float dust is an ongoing challenge for all coal operations. Minimising the make of coal dust and reducing float dust is an ongoing challenge for all coal operations. Areas that were stone dusted once, if left unmaintained, accumulate coal dust deposits providing fuel for an explosion to propagate. Areas that were stone dusted once, if left unmaintained, accumulate coal dust deposits providing fuel for an explosion to propagate. Only 4-5mm of dry dust will be lifted in a weak methane explosion. The more float dust accumulated, the less of the underlying stone dust will be lifted. Only 4-5mm of dry dust will be lifted in a weak methane explosion. The more float dust accumulated, the less of the underlying stone dust will be lifted. We saw that a methane explosion creates a fire ball that travels behind the shock wave and hits the dust cloud. We saw that a methane explosion creates a fire ball that travels behind the shock wave and hits the dust cloud. Insufficient quantities of stonedust in suspension will allow the coal dust to ignite will obvious catastrophic consequences. Insufficient quantities of stonedust in suspension will allow the coal dust to ignite will obvious catastrophic consequences.

9 Coal dust explosion 1 kg

10 Coal dust explosion 75kg

11 Coal dust explosion 75kg

12 Wet stone dusting Wet dusting was always viewed as an opportunity to help overcome reductions in cutting times due to stoppages caused by stone dusting. Wet dusting was always viewed as an opportunity to help overcome reductions in cutting times due to stoppages caused by stone dusting. The onset of 7 day operations compounded the problem and attempts were made to apply stone dust as a slurry. The onset of 7 day operations compounded the problem and attempts were made to apply stone dust as a slurry. This allowed crews to continue production while wet dusting was carried out in the ventilation intakes of the panels. This allowed crews to continue production while wet dusting was carried out in the ventilation intakes of the panels. Wet dusting is a process of creating a stone dust / water slurry and pumping it onto the mines walls. Wet dusting is a process of creating a stone dust / water slurry and pumping it onto the mines walls. The intent was to replicate the conventional dry dusting without the need to withdraw inbye personnel. The intent was to replicate the conventional dry dusting without the need to withdraw inbye personnel.

13 Wet stone dusting

14 Why wet dusting does not work The application of wet dusting was proven however the final product failed to provide adequate inerting qualities. The application of wet dusting was proven however the final product failed to provide adequate inerting qualities. When stone dust comes in contact with water the particles partly dissolve. When stone dust comes in contact with water the particles partly dissolve. As the slurry dries, the dissolved solution moves between the stonedust particles forming a bonding bridge that locks the particles together. As the slurry dries, the dissolved solution moves between the stonedust particles forming a bonding bridge that locks the particles together. This is referred to as “The Caking Effect”. This is referred to as “The Caking Effect”. This caking reduces the amount of stone dust raised into suspension, creating enough doubt on its effectiveness as an inerting agent. This caking reduces the amount of stone dust raised into suspension, creating enough doubt on its effectiveness as an inerting agent. Inspectors in NSW and Qld rightfully issued directives restricting the use of slurry dusting Inspectors in NSW and Qld rightfully issued directives restricting the use of slurry dusting

15 ACARP project C16014 Australian Coal Association Research Program (ACARP) contracted Mining Attachments to research and develop a wet slurry treatment process that could overcome the caking effect. Australian Coal Association Research Program (ACARP) contracted Mining Attachments to research and develop a wet slurry treatment process that could overcome the caking effect. Applied Australia were requested to engineer an additive that would work but had to be end user friendly. Applied Australia were requested to engineer an additive that would work but had to be end user friendly. In 2006 the additive was ready to be trialled and tested on large scale. In 2006 the additive was ready to be trialled and tested on large scale. The 3 stage project spanned over two years. The 3 stage project spanned over two years. Surface full scale spray trials Surface full scale spray trials Underground spraying trials Underground spraying trials Full scale explosion testing Full scale explosion testing Industry monitors were required to assess each stage objectives were achieved, before advancing onto the next. Industry monitors were required to assess each stage objectives were achieved, before advancing onto the next.

16 Airo-Dust™ Additive Airo-Dust™ Additive has been designed with the primary focus of providing a safe product for use in the underground mining environment Airo-Dust™ Additive has been designed with the primary focus of providing a safe product for use in the underground mining environment The MSDS outlines all the health and safety requirements. The MSDS outlines all the health and safety requirements.  Non-combustible   Operators wear standard PPE  Classified Non-dangerous goods  Warnings in regards to skin, eyes, inhalation and ingestion are similar to those of concentrated household dishwashing detergent  pH of the additive is between 6-8 (water 7.0 neutral) The required dosage of 10 litres of additive is required to treat one tonne of stone dust. The required dosage of 10 litres of additive is required to treat one tonne of stone dust. Airo-Dust™ Additive is a trademark of Illinois Tool Works Inc.

17 Surface full scale trials

18 Surface full scale trials Samples were taken during the surface spraying trials and sent for particle size distribution. Samples were taken during the surface spraying trials and sent for particle size distribution. Results showed little change to the original particle sizes, supporting the anti caking ability of the process. Results showed little change to the original particle sizes, supporting the anti caking ability of the process. A simulated explosion demonstrated that the treated wet dust could be put into suspension. A simulated explosion demonstrated that the treated wet dust could be put into suspension. The project moved to Cook Colliery, one of many operations that supported the project. The project moved to Cook Colliery, one of many operations that supported the project. Mining Attachments fit for purpose equipment was mobilised onsite and the first underground trials began. Mining Attachments fit for purpose equipment was mobilised onsite and the first underground trials began.

19 Underground Trials

20 Underground Trials The experience gathered from the 6 months of trials allowed the necessary time to refine the process with dedicated personnel allowed to focus on achieving the projects aims. The experience gathered from the 6 months of trials allowed the necessary time to refine the process with dedicated personnel allowed to focus on achieving the projects aims. Industry monitors evaluated the underground trials, operating the equipment and viewing other areas of the mine previously dusted using the new slurry additive process. Industry monitors evaluated the underground trials, operating the equipment and viewing other areas of the mine previously dusted using the new slurry additive process. The project then moved into the final stages of conducting full scale explosion testing by third parties. The project then moved into the final stages of conducting full scale explosion testing by third parties. The new slurry additive process was named Airo-Dust. The new slurry additive process was named Airo-Dust. The CSIR explosion testing facility in Kloppersbos South Africa, hosted comparative Dry v’s Airo-Dust testing, facilitated by Skillpro Services. The CSIR explosion testing facility in Kloppersbos South Africa, hosted comparative Dry v’s Airo-Dust testing, facilitated by Skillpro Services.

21 Explosion Testing The testing facility comprises of a 200m steel pipe tunnel that has a methane mixing station and ignition centre one end and the other end is open. The testing facility comprises of a 200m steel pipe tunnel that has a methane mixing station and ignition centre one end and the other end is open.

22 Explosion Testing Trays were prepared prior to testing. Trays were prepared prior to testing. Prior to each test explosion, trays were weighed and secured into the tunnel. Prior to each test explosion, trays were weighed and secured into the tunnel. After the blast the loss of stone dust from each tray was recorded. After the blast the loss of stone dust from each tray was recorded. High and low speed video footage captured each blast. High and low speed video footage captured each blast.

23 Explosion Testing

24 Explosion Testing On average 40% more stonedust was lifted from the Airo-Dust trays compared to the stonedust lifted from the Dry dust trays. On average 40% more stonedust was lifted from the Airo-Dust trays compared to the stonedust lifted from the Dry dust trays.

25 Explosion Testing On average the depth of dust lifted by the explosions also varied. On average the depth of dust lifted by the explosions also varied. 4-5mm in the case of the Dry dust trays 4-5mm in the case of the Dry dust trays in most cases the Airo-Dust trays were empty (30mm) in most cases the Airo-Dust trays were empty (30mm)

26 Explosion Testing Full details of this project including all the results from the explosion and underground testing can be obtained on line by visiting Full details of this project including all the results from the explosion and underground testing can be obtained on line by visiting Project number C

27 How the Airo-Dusting process works Stonedust slurry is made by mixing two parts stonedust with 1 part water. Stonedust slurry is made by mixing two parts stonedust with 1 part water. The Airo-Dust additive is dosed into the pump out line which provides a protection barrier around the stone dust particles, minimising the caking effect. The Airo-Dust additive is dosed into the pump out line which provides a protection barrier around the stone dust particles, minimising the caking effect. Air is entrained into the line to create a foam. The product is highly vesicular, trapping millions of tiny air pockets or voids in the product as it dries. Air is entrained into the line to create a foam. The product is highly vesicular, trapping millions of tiny air pockets or voids in the product as it dries. From the explosion testing it was evident that a methane pressure wave is able to penetrate these voids, smashing through the surface and raising the stonedust into suspension. From the explosion testing it was evident that a methane pressure wave is able to penetrate these voids, smashing through the surface and raising the stonedust into suspension.

28 How the Airo-Dusting process works The equipment consists of a mixing tank and paddle, slurry pumps, additive pumps and the foam generation equipment. The equipment consists of a mixing tank and paddle, slurry pumps, additive pumps and the foam generation equipment. The system is non adjustable making the process less complicated and simple to use. The system is non adjustable making the process less complicated and simple to use. The additive is accurately dosed into the pump out line and delivers a steady stream of shaving cream like slurry to either a hand held nossel or machine spray bars. The additive is accurately dosed into the pump out line and delivers a steady stream of shaving cream like slurry to either a hand held nossel or machine spray bars. Existing equipment can be modified or new custom made Airo- Dusters can be supplied. Existing equipment can be modified or new custom made Airo- Dusters can be supplied. The Airo-Dust additive is supplied and serviced Australia wide by ITW’s Applied Australia or nominated overseas agent. The Airo-Dust additive is supplied and serviced Australia wide by ITW’s Applied Australia or nominated overseas agent.

29 Equipment

30 Equipment

31 Getting started A copy of the final ACARP report has been sent to both NSW and Queensland inspectors for review. A copy of the final ACARP report has been sent to both NSW and Queensland inspectors for review. The NSW DPI have assembled a review committee to firstly review the ACARP report and secondly participate in the initial underground trials in NSW. The NSW DPI have assembled a review committee to firstly review the ACARP report and secondly participate in the initial underground trials in NSW. This will allow the Airo-Dusting process to be viewed from both a technical and practical perspective. This will allow the Airo-Dusting process to be viewed from both a technical and practical perspective. Operations can now make application to the NSW DPI to use the Airo-Dusting process underground. Operations can now make application to the NSW DPI to use the Airo-Dusting process underground.

32 Current participating sites Grasstree Mine Grasstree Mine 1 x existing wet duster modified into an Airo-Duster 1 x existing wet duster modified into an Airo-Duster 2 x new Airo-dusters 2 x new Airo-dusters Greenside Colliery (South Africa) Greenside Colliery (South Africa) 1 x new Airo-Duster 1 x new Airo-Duster North Goonyella North Goonyella 1 x Hire Airo-Duster 1 x Hire Airo-Duster Centennial Coal (Mandalong, Clarence, Springvale) Centennial Coal (Mandalong, Clarence, Springvale) DPI application pending DPI application pending Vale (Integra Coal) Vale (Integra Coal) DPI application pending DPI application pending

33 Airo-Dusting