TCP Training Traffic Control Person Training
TCP Training Agenda !Course Introduction !Complying with Regulations and Standards !Using Traffic Control Equipment !Setting Up Work Zones !Basic Traffic Control Skills OH 1-1 Day 1
TCP Training Agenda !Recap !Working Around Construction Equipment !Building on Basic Traffic Control Skills !Course Review !Wrap Up OH 1-2 Day 2
TCP Training Parts of a Work Zone OH 4-1 Termination Area Work Area Buffer Space Transition Area Advance Warning Area
TCP Training Planning a Work Zone ! Duration or type of job ! Road configurations ! Traffic variations ! Environmental conditions ! Work site variations ! TCPs required OH 4-2 Consider
TCP Training Setting Up a Work Zone ! Review traffic plan or work zone layout ! Check availability and condition of traffic control devices ! Select traffic control devices ! Place the devices starting with the advance warning area OH 4-3 Procedures
TCP Training Work Zone Set-up: Two-lane, Two-way Roadway OH 5-1
TCP Training Crawler Tractor OH 6-1
TCP Training Grader OH 6-2
TCP Training Articulated Dump Truck OH 6-3
TCP Training Dump Truck OH 6-4
TCP Training Roller OH 6-5
TCP Training Wheeled Crane OH 6-6
TCP Training Excavator OH 6-7
TCP Training Loader OH 6-8
TCP Training Skid Steer Loader OH 6-9
TCP Training Paving Machine OH 6-10
TCP Training Aerial Lift Vehicle OH 6-11
TCP Training Auger Truck OH 6-12
TCP Training Tow Truck OH 6-13
TCP Training Line Painting Truck OH 6-14
TCP Training Wood Chipper OH 6-15
TCP Training Emergency Procedures l Transportation of Dangerous Goods l Hazardous Spills l Broken Gas Lines l Broken Sewer Lines l Broken Gas Mains l Downed or Broken Power Lines OH 7-1
TCP Training Intermittent Moving Work OH 7-2
TCP Training Two-lane, Two-way Intersection OH 7-3
TCP Training Controlling Traffic with One TCP OH 7-4