Certificate of Occupancy - Minimum Requirements

Slides:



Advertisements
Similar presentations
Special Inspections
Advertisements

General Permit for Low Hazard Potential Impounding Structures By Robert J. VanLier, P.E. Regional Dam Safety Engineer 900 Natural Resources Drive, Charlottesville,
DEPARTMENT OF DEVELOPMENT SERVICES BUILDING DIVISION Ronald L. Lynn, Director/Building Official Gregory J. Franklin, Assistant Director Neil Burning, Manager.
Ted “Smitty” Smith  I have included in the following slides some key sections from each of the codes you will primarily encounter on the test. I recommend.
Ron DeJuliis, Commissioner of Labor and Industry Rob McGeeney, Program Manager Larry Kreseski, Chief inspector Department of Labor, Licensing, and Regulation.
Sprinkler Retrofit Requirements Section 5 of Chapter 304 Acts of 2004 MGL c.148, s26G1/2.
Project Closeout Issues A Review of Critical Tasks Required During the Closeout Process.
Form I-9 Process An Online Training for Supervisors and Designees Presented by Human Resources Revised November 2009.
Project Close Out CTC-470.
Building Codes Violation of building codes and regulations can cause injury to building users and expose architects to legal liability and the possible.
Retirement Home Regulated under the Retirement Home Act, 2010.
A Guide to Fire Alarm Service and Maintenance Requirements.
ESSENTIAL SAFETY MEARURES IN BUILDINGS PRESENTED BY: BRUCE HOWIE.
Copyright 2008, International Code Council 2012 IECC ® for SERBCA Based on the 2012 International Energy Conservation Code.
Emergency Action Plans
FDA shall issue a certification for those FDA licensed establishments applying for amendment during the validity of their Licenses to Operate. This certification.
Road Map to a Green Tag Paperwork=Time=Money. Questionnaire If you could change any one major thing inside the Fire Community Services process what would.
© 2012 Ted “Smitty” Smith  This slide show contains multiple timed questions. All questions can be answered using the International Fire Code and the.
Module 7: Construction Phase
CONTROL OF HAZARDOUS ENERGY LOCKOUT/ TAGOUT PROGRAM.
Process Safety Management
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Governmental Constraints on Construction Chapter 2.
Federal Aviation Administration Southern Region FAASTeam CFI Special Emphasis Program Pilots Airworthiness Responsibilities Presented by: Mark L. Laughridge.
1 Canadian Fire Alarm Association The Perspective from a Municipal Building Department Wednesday May 5, 2010 Presented by:Mike Seiling, CET, CBCO, Chief.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
Idaho Solid Waste Facility Record Keeping June 20, 2006 Idaho Department of Environmental Quality.
2010 Florida Building Code: I nterpretation P rocess O verview.
1 Ensuring the protection of bidders’ rights.  The Federal Law of № 94-FZ "On placing orders for goods, works and services for state and municipal.
Updates to Title 8. Anticipated Timeline… July - December 2013 Ideas Compiled Research and Drafting January 2014 Planning Commission Worksession Review.
Building Permits for Solar Domestic Hot Water Systems Ted Van Vliet Toronto Building October 1 st, 2008 Presented at Solar Neighbourhoods Contractor Workshop.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Maine State Fire Marshals Office1 Laws and Codes Relating to Existing Apartment occupancies in the State of Maine Mark Stevens CFI-II, CFPS, CFPE Inspections.
C U S T O M E R D R I V E N. B U S I N E S S M I N D E D. Department of Licensing & Regulatory Affairs Bureau of Construction Codes Keith E. Lambert, P.S.,
Design and Structural Specifications. Foreword For the protection of public life and property, the design of structures and the preparation of structural.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Firefighter Emergency Escape Systems New York State Department of Labor Public Employee Safety and Health (PESH)
Planning Task Force March 31, 2016 Zoning & Building Compliance Certification (LDC 346 Zoning Compliance Permit) Presented by: Nicole M. Knapp Planning.
May 4, 2011 Jenefer Youngfield Utah State Office of Education Utah K-12 Public School Construction Education and Training.
International Existing Building Code. Please turn off your phone or set it to vibrate. If answering a call or texting is necessary please step out of.
Ontario Building and Fire Code Overview Presentation for the Downtown Revitalization Committee May 4, 2016 Jack Tosta, Chief Building Official Andrew McPherson,
RESPONSIBLE CONTRACTOR LAW Presented by Susan Groth, September 11, 2014.
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
Fire Protection Systems Chapter 9 IBC 9th Edition Amendments
CITY OF HARARE EMERGENCY SERVICES
Cross Connection Survey Training
Inspector's Role and Responsibilities
Enforcement of Floodplain Management Regulations
The Responsible Person
Inspector's Role and Responsibilities
Fire Alarm Systems for Emergency Operations of Elevators
Global Connections Day Building Safety Service Provider
Department of Buildings
Inspector's Role and Responsibilities
Goodyear Napanee Contractor Safety
Outreach Training Program Requirements
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
Code Review: Existing Building Code
What is the UL QFCP? FCIA Webinar Presenters:
General Requirements of NFPA 101
City of Marathon Vacation Rental Training Session
City Council Meeting November 14, 2016
Denver Fire Depart. License Fire Alarm Practice Test # 12
Presentation transcript:

Certificate of Occupancy - Minimum Requirements September 2013

Agenda Basic C of O Concept/Criteria – Part 1203 Information Required on C of O Certificate of Occupancy “Checklist” & Statement of Certification Temporary & Conditional Certificates & Conditions of Revocation Certificate of Compliance Conclusion & Questions

Basic Concept of C of O NO building erected, enlarged or altered, subject to the Uniform Code & Part 1203 Shall be used or occupied, unless a code compliance certificate or temporary approval for occupancy is issued, except: Work exempted from permit requirements of Section 1204.7 (a)

Basic Concept of C of O Based on Title 19 NYCRR Part 1203 Does municipality really “Certify” buildings? Certification that … Is it a legally constructed building with a C of O? Required for all work which: Requires a building permit Acknowledges a change of occupancy

Basic Concept of C of O Devices used to restrict use of a building or structure to a specific type of use or occupancy Acknowledges construction is complete & is used for intended purpose Protection and Liability Rights of tenant & owner with Certificate

Basic Criteria for Issuance Verification of submittals - Records of: Approved building permit/change of occupancy Appropriate field inspections were made Changes to documents were accepted Special Inspection Reports HVAC manuals and certification Fire protection system testing Record drawings (“as-builts”)

Basic Criteria for Issuance Final inspections per local Code Officials Provide punch-list, as applicable Final inspections performed by others Special Inspections Fire Marshal (joint inspection with Code Official) Third-party inspections (i.e.-fire-stopping, elevators, electrical, fire alarm, fire sprinkler, hood systems) No outstanding code compliance violations

Local Municipality Options Local governments have option to: Expand requirements for C of O’s to include situations not specified in min. standards of Part 1203: Where local governments requires additional permits Require renewal of a C of O for multiple dwellings at the time of resale. (renewal not new C of O) Tie Operating Permit to the issuance of a C of O

Local Municipality Options con’t TEMPORARY CERTIFICATE OF OCCUPANCY Issue temporary C of O’s to buildings or portions thereof that are sufficiently complete Period shall not exceed 1 year (may be renewed) May place special conditions, to ensure safety & to protect interest of local municipality (clearly state) Agreed to by the property owner (signature)

Agenda Basic C of O concept/criteria – Part 1203 Information required on C of O Certificate of Occupancy “Checklist” & Statement of Certification Temporary & Conditional Certificates & Conditions of Revocation Certificate of Compliance Conclusion & Questions

Minimum Information on C of O Date and # of building permit Property identification Approved occupancy classification(s) Main occupancy(ies) Accessory spaces Fire protection equipment provided Required or voluntary

Minimum of Information on C of O Occupant loads for all occupancies and spaces Determine occupant load based on use of the space Multiple occupancies within the same use group should be indentified by size and/or location Assigning square footage to different occupancies provides a specific record of what was approved Posting of loads

Additional Information on C of O As applicable: Special use permit (local zoning law) Construction type Version of Code the building was constructed under.

Additional Information on C of O As applicable: Operating permit: Hazardous materials or processes Use, operation or repair of fire protection equipment Buildings with one or more areas of public assembly Potential higher public safety hazard buildings (i.e.- amusement buildings, temporary assembly, etc.)

Additional Conditions for C of O As applicable: Control areas: Hazardous occupancies/materials Fire Safety Plans Evacuation Plans

Record Keeping Maintain adequate records of: System for issuance of Certificates of Occupancy or compliance, Documents applying to C of O issuance

10 Minutes BREAK

Agenda Basic C of O concept/criteria – Part 1203 Information required on C of O Certificate of Occupancy “Checklist” & Statement of Certification Temporary & Conditional Certificates & Conditions of Revocation Certificate of Compliance Conclusion & Questions

Certificate of Occupancy “Checklist” Final inspection by Building Official Final inspection by Fire Marshal Third Party written inspection reports Special Inspection final reports Hazardous materials reports Compliance with planning & zoning

Certificate of Occupancy “Checklist” Completion of site work Fire Service Features, access roads, hydrants, fire service connections access, Conditional permits, if weather restrictions Verification of handicap accessibility features Installed/provided as designed Verify slope and cross slope along accessible route Verify door pull and clearances when furnature has been placed.

Certificate of Occupancy “Checklist” Acceptance testing of fire protection equipment Premises identification Plainly visible and legible from street or road fronting property Approved signage Fire department access, interior Electrical service, fire sprinkler room, equipment rooms, hazards identified Truss signage

Certificate of Occupancy “Checklist” Operating permits Lease plan (for covered malls) Operating & maintenance manuals (for commercial HVAC systems) Certification of commissioning of systems Balancing reports Owner training, as applicable

Statement of Certification Statement of Municipality (inspected to verify that ______ was constructed in accordance with approved plans) Signature of Building Official Signature of Fire Marshal Statement of authorized applicant (constructed in accordance with approved plans) Signature of authorized applicant

Agenda Basic C of O concept/criteria – Part 1203 Information required on C of O Certificate of Occupancy “Checklist” & Statement of Certification Temporary & Conditional Certificates & Conditions of Revocation Certificate of Compliance Conclusion & Questions

Temporary & Conditional Certificates Limiting language Require files on adequate information and detailed statements of work to be done Functional fire protection equipment (all systems fully operational) All exiting for occupied areas maintained Limiting time period Relative to anticipated construction schedule

Temporary & Conditional Certificates Provisions for penalties Not a guarantee that a permit for entire building is or will be granted Minimum criteria should be set for the continuation of work Phased Projects Phases clearly identified Required fire watches during system shutdowns Re-inspection of fire-stopping on common walls

Conditions for Revocation All work shall stop until approved documents, resolution has occurred & permit is given Exception: directed work to remove violation or unsafe condition

Conditions for Revocation Construction not in accordance with approved submittals Construction shall be per approved design, in accordance with codes Any changes during construction shall be submitted for approval prior to work done Certificates issued in error

Not Constructed in Accordance with the Approved Plans?

Not Constructed in Accordance with the Approved Plans?

Conditions for Revocation Work performed without required permit All new work requires a building permit, with exceptions (per local code and/or Part 1203) Expiration of Certificate Temporary C of O Operating Permit

Conditions for Revocation Property maintenance Unsafe structures and equipment Occupancy or use modified without permit Failure of testing & maintenance of required fire protection equipment Unsafe or hazardous conditions Building fire or collapse

Revocation Process Local Law should provide a process for revocation of a Certificate of Occupancy or Certificate of Compliance. Requires Due Process and Appeal provisions. Typically includes a hearing and action by Legislative body or Court action.

Unsafe Condition

Unsafe Conditions

Unsafe Conditions

Unsafe Conditions

Agenda Basic C of O concept/criteria – Part 1203 Information required on C of O Certificate of Occupancy “Checklist” & Statement of Certification Temporary & Conditional Certificates & Conditions of Revocation Certificate of Compliance Conclusion & Questions

Certificate of Compliance Certificate of Compliance is applied, issued, administered and can be revoked the same as a Certificate of Occupancy. When is it appropriate to issue a Certificate of Compliance? How do they differ from a Certificate of Occupancy?

Certificate of Compliance When is it appropriate to issue a Certificate of Compliance? When the building or area will not be occupied When the building permit is issued for a building shell At the completion of the installation of new equipment, systems, repairs, replacements Modifications to approved site improvements that impact existing fire service features

Certificate of Compliance How do they differ from a Certificate of Occupancy? How are they similar? The Certificate of Compliance does not authorize the occupancy of a building or space They both close out the permit process They provide a record of the limitation of approval granted by the municipality They both carry the weight of the law and they both can be revoked with cause

New Certificate of Occupancy?

Contacts – DOS Regional Offices Buffalo – (716) 847-7611/2: Kumar Vijaykumar Andrew Hvisdak  Finger Lakes Office – (315) 586-4563: Currently Vacant Syracuse – (315) 428-4434: Jim King > Adirondack Office – (518) 441-1895: - Whitney Russell

Contacts – DOS Regional Offices Capital Office – (518) 477-7497: www.dos.state.ny.us  Joseph McGrath Kingston Office – (845) 334-9378: Dan Nichols Long Island Office – (631) 952-4915/09/12: Courtney Nation Richard Smith

Contacts – DOS Regional Offices Peekskill Office – (914) 734-1347: Erika Krieger Southern Tier Office – (585) 437-5534: Charles Bliss Utica Office– (315) 793-2526: Tom Romanowski Binghamton – (607) 721-8759: Currently Vacant

Questions? T.Y. Lin International would like to thank the New York State Fire Marshals and Inspectors Association for the opportunity to participate in this educational school and present this program