Control procedures in polish public procurement law Public Procurement Office 2007.

Slides:



Advertisements
Similar presentations
______________________
Advertisements

National and External Control of Public Procurement Main Issues.
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DG “PROGRAMMING OF THE REGIONAL DEVELOPMENT” OPERATIONAL PROGRAMME “REGIONAL DEVELOPMENT” EVALUATION.
REPUBLIC OF ALBANIA PUBLIC PROCUREMENT AGENCY Introduction to the Albanian Public Procurement System Central Asia Regional Public Procurement.
Presentation of a real call for proposal from the point of view of the managing authority.
PAWEL MAGDZIAREK IRREGULARITIES DETECTED DURING IMPLEMENTATION OF THE REGIONAL OPERATIONAL PROGRAM FOR WIELKOPOLSKA REGION.
Public Oversight System in Poland. May 24, 2015Accounting Department Ministry of Finance 2 Public Oversight System in Poland Audit Oversight Commission.
Internal Audit reporting to CHU Evelin Pungas Head of Internal Control Coordination Unit Financial Control Department
8/8/20151 Presented By: B.RUGANINTWALI PASCAL President, National Independent Review Panel/Public Procurement REPUBLIC OF RWANDA.
ZHRC/HTI Financial Management Training
DATA PROTECTION ISSUES COMBINING OF PERSONAL DATA STORED IN DIFFERENT INSTITUTIONS 9th Meeting of Central and Eastern European Commissioners June 4-6 th.
Establishment and Development of the Internal Audit System for the Public Sector in Kyrgyz Republic INTERNAL AUDIT COMMUNITY OF PRACTICE ISTANBUL
Audit of Public Procurement
Public Procurement in the Republic of Cyprus By: Theodosis Tsiolas Public Procurement Directorate Treasury of the Republic.
2014 China-EU High Level Forum “China and EU Dialogue: Rule of Law” Subtopic reforming the System of law enforcement: development of administrative oversight.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
Romanian Court of Accounts years of existence.
Grosu-Axenti Diana Financial Inspection Director Financial Inspection vs External & Internal audit in Republic of Moldova.
Supervision and regulation of banking system duty is given to a autonomous organization called Banking Regulation and Supervision Agency. BRSA is public.
Good practices from and for the EU accountability process Irena Petruškevičienė Vilnius, 17 October 2006.
“Support to Local Government Units for More Effective & Accountable Public Financial Management” DCI-ASIE/2010/ PDF Working Group on Decentralization.
How SAIs influence Good Governance in the Public Administration: an experience of the Accounts Chamber of the Russian Federation The Accounts Chamber of.
Competitive selection in the civil service of Lithuania Civil Service Department under the Ministry of the Interior Rasa Tumėnė Advisor of the Division.
1 Polish SAI (NIK) experience in the field of EU funds Piotr Szpakowski Najwyższa Izba Kontroli Prague, 6-8 November 2006.
Supreme Audit Office (the NIK): Basic Facts Riga, 4 April 2012.
Public procurement audit - the Polish experience Batumi, June 2015 Krzysztof Kwiatkowski President Supreme Audit Office of Poland (NIK) Dr hab. prof. Andrzej.
Eliza Niewiadomska EBRD Legal Transition Programme Kiev, 19 May 2012 Building Confidence in Public Procurement Review Best practice for enforcing public.
Information on first level control, national eligibility rules and national co–financing provisions for European Territorial Cooperation programmes in.
T HE DEBT OF THE LOCAL GOVERNMENT UNITS IN P OLAND T HE DEBT OF THE LOCAL GOVERNMENT UNITS IN P OLAND Iwona Zyman, Director of the Regional Branch in Opole.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
1. common courts military courts administrative courts tribunals The Supreme Court The Supreme Administrative Court The Constitutional Tribunal and The.
Budget of Municipalities - Planning and Execution the Role of the Supreme Audit Office of Poland (NIK) Warsaw, October 2015 Iwona Zyman Director of the.
Publicity and Transparency in Local Government – the Role of NAMRB Guinka Tchavdarova Executive Director of the National Association of Municipalities.
Eastern African Association of Public Accounts Committees (EAAPAC) & Southern African Development Community Organisation of Public Accounts Committees.
New Pension System in Poland - How to Classify in Accordance with SNA 93 and ESA 95 Krzysztof Pater Undersecretary of State Ministry of Economy, Labour.
THE ROLE OF THE AUDITOR- GENERAL RP MOSAKA Business Executive: Parliamentary Services OFFICE OF THE AUDITOR-GENERAL.
EN EUROPEAN COMMISSION Budgetary Control Committee of European Parliament Budgetary Control Committee of European Parliament Brian Gray DG BUDGET Workshop.
Relationship of Internal Audit with Financial Inspection and External Audit mr.sc. Ljerka Crnković Ministry of Finance, Croatia.
EN DG Regional Policy & DG Employment, Social Affairs & Equal Opportunities EUROPEAN COMMISSION Luxembourg, May 2007 Management and control arrangements.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 32 – Financial control Bilateral screening:
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 15 – Energy – Upstream Hydrocarbons.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 6 – Company Law Bilateral screening:
Ministry of Finance Financial management and control of the Operational Programmes, co- financed under the Structural funds and the Cohesion fund of EU.
Civil Service Of Lithuania. Structure of employment in state sector CIVIL SERVICE DEPARTMENT UNDER THE MINISTRY OF THE INTERIOR Health service and social.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
National coordination of public procurement in Poland Ministry of Infrastructure and Development.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 5 – Public Procurement Bilateral screening:
1 The valorisation of human resources charged of the municipal finance management in Europe Grzegorz Orawiec Grzegorz Orawiec.
EU - China 11 Guidelines for Applicants rules for applications European Union Delegation to China & Mongolia Beijing Information Session 14 th November.
TAIEX-REGIO Workshop on Applying the Partnership Principle in the European Structural and Investment Funds Bratislava, 20/05/2016 Involvement of Partners.
REPUBLIC OF SLOVENIA MINISTRY OF PUBLIC ADMINISTRATION SLOVENIAN PUBLIC ADMINISTRATION - structure and system Barbara Koželj Sladič Public Sector Directorate.
Public Procurement Agency - Bulgaria
The activities of the state tax authorities
PRESENTATION OF MONTENEGRO
Structural Funds Financial Management and Control, Romania
PRESENTATION OF MONTENEGRO
Seminar on Evaluation of Internal Control Systems
PEMPAL, Moscow, October 2016 Natalia Pilets Deputy Head,
Jacek Gdański Accounting Department
Simplification and reduction of administrative burden.
External Audit Core PFM Training Program Sanjay Vani
MEASURING PERFORMANCE OF SUPREME AUDIT INSTITUTION
years of existence.
PROCUREMENT POLICIES AND GUIDELINES
Public Administration in the Czech Republic
PRESENTATION OF MONTENEGRO
Good practices for risk assessment and control activities
Audit of Contracting Arrangements of Public Services
CRISTINA BREDEN – Director ROMANIAN COURT OF ACCOUNTS
PUBLIC PROCUREMENTS IN THE REPUBLIC OF SERBIA
Presentation transcript:

Control procedures in polish public procurement law Public Procurement Office 2007

Table of contents I – Institutions authorized to control public procurement procedures in Poland II.A – Public Procurement Office in polish system of control institutions II.B. – Different types of control (ex – post and ex – ante) II.C. – Control consequences and appeals III – Examples of most frequently breaches (formal breaches and breaches results in a recommendation of cancellation)

Institutions authorized to control public procurement procedures in Poland: Institutions responsible for management of structural funds in Poland The Supreme Chamber of Control Regional Chambers of Auditors Public Procurement Office (PPO)

Institutions responsible for management of structural funds in Poland: Institutions responsible for management, of structural funds in Poland are: Ministry of Regional Development and 16 marshal offices, which may delegate rights to other offices, Are responsible for complex management of several programmes funds from UE financial resources, including public contracts necessary in programmes implementation, In case of detection the breaches, Institutions must inform the PPO President who carries out a control, In case of confirmation of breaches which have impact on the result of the contract award procedure, the UE funds may be take away.

The Supreme Chamber of Control vol. I The Supreme Chamber of Control is the supreme body of state audit and subordinate to the Lower Chamber of Polish Parliament (Sejm). The Supreme Chamber of Control audits the activity of bodies of governmental administration, the National Bank of Poland, state legal persons and other units of the state. The Supreme Chamber of Control may audit the activity of bodies of local government, communal legal persons and other communal organizational units and other economic subjects (businesses) and organizational units, to the extent to which they make use of state or communal property or resources and meet their obligations to the state.

The Supreme Chamber of Control vol. II The Supreme Chamber of Control undertakes audits from the point of view of legality, economic efficiency, efficacy and integrity. The Supreme Chamber of Control, investigates in particular the implementation of the budgets and execution of laws or other legal acts with respect to the financial, economic and administrative activity of these units (concern public sector), the public contracts are investigate in wide range context. In case of reasonable crime or delinquency suspicion, The Supreme Chamber of Control notify the public prosecutor’s office (criminal responsibility) or/and higher level agency and the agent for public finance discipline (disciplinary responsibility).

Regional Chambers of Auditors Regional Chambers of Auditors are national bodies of supervision and audit of financial economy. Chambers supervisions the activity of territorial self- government bodies, self-government public bodies and other bodies in limits of funds from territorial self-government bodies – in scope of financial cases and audits the financial economy and public contracts. Chambers audits public contracts mentioned bodies on the basis of conformity with law and conformity the documentation with facts of a case; if audit relate to government administration tasks fulfills by mentioned bodies, it also take into account propriety, honesty and economy criteria.

Public Procurement Office vol. I PPO plays a policy making and coordinating role for the whole public procurement system The President of PPO is appointed by the Prime Minister The President of PPO undertakes audits only from the point of view of legality. Control Department in PPO is responsible for carrying out ex-ante and ex-post control on particular contract award procedures on the basis of information and documents obtained from awarding entities and other sources.

Public Procurement Office vol. II Optional control The President of PPO may carries out a control regardless of contract award value and contracting authority The PPO President may control the award of contracts prior to the conclusion of a procurement contract (ex-ante control) or within 4 years of its award (ex-post control) The optional control is usually carry out in case of economic operators complains who inform the PPO President of breach the law during contract award procedure.

Public Procurement Office vol. III Obligatory control Ex – ante The ex-ante control is obligatory if the value of control is equal or exceeds equivalent of 10,000,000 Euro for supplies and services and is equal or exceeds equivalent of 20,000,000 Euro for works or, The ex-ante control is obligatory at the request of institutions responsible for management of structural funds in Poland. Ex – post The ex-post control is obligatory at the request of institutions responsible for management of structural funds in Poland.

Public Procurement Office vol. IV Consequences of the control procedure Ex – post controlEx – ante control Formal breaches of law Information about breaches Information about breaches and the post control recommendations Breaches of principles of award of contracts Notification the component agent for public finance discipline and in case of hard breaches – public prosecutor’s office; The PPO President may also impose a financial penalty. Recommendation on successive evaluation of tenders or recommendation on cancellation of the procedure

Public Procurement Office vol. V Recommendation on cancellation of the procedure The head of awarding authority appeals against the PPO President’s recommendations to The National Review Body The National Review Body cancel the President’s recommendations The awarding authority may conclude the contract The National Review Body uphold the President’s recommendations It’s forbidden to conclude the contract The awarding authority conclude the contract against The National Review Body opinion The awarding authority does not apply post control recommendations The PPO President may apply to the court for the statement of invalidity of the procurement contract

Public Procurement Office vol. VI Financial penalty The financial penalty can’t be impose on the public finance sector units Only in case of the breaches of principles of award of contract The amount of the financial penalty shall be determined depending on the contract value, not on the kind of breaches (there are three rates of financial penalty: 750 Euro, 7500 Euro and about Euro) The financial penalty can be impose independently of other sanctions, such as: the obligation of cancellation of the procedure

Most frequently breaches vol. I Formal breaches Request to submit not necessary documentations (for example documentation to confirm the conditions, when no condition is determine), Report prepared against the rules, The value of the contract determined with breaches but with no effect on choice the proper procedure, Lack of necessary information about procedure in the contract notice.

Most frequently breaches vol. II Breaches of principles of award of contracts Failure the exclude economic operators, who don’t fulfill conditions, Applying the negotiated procedure without fulfill conditions, The contract notice published in wrong publication (for example in Public Procurement Bulletin instead of The Official Journal of the European Union), Conclusion a public contract with economic operator without valid deposit, Failure the principle of fair competition through describe the object of contract by reference to trade marks.