2010 Long-Term Surveillance and Maintenance Conference Old Rifle Title I Processing Site, Rifle, Colorado What Are They Doing on My Site? Richard Bush,

Slides:



Advertisements
Similar presentations
June 6, 2013 SURFACE RECLAMATION OF THE CAPTAIN JACK MILL SUPERFUND SITE Nick Anton, CDM Smith Todd Bragdon, CDM Smith Mary Boardman, CDPHE Joy Jenkins,
Advertisements

Kristin M. Brown, H.I.T. June 5,  Uranium occurs naturally and is a common contaminant in the environment  Anthropogenic Causes  Weapons Production.
By: Frank Filas, P.E. Environmental Manager Energy Fuels Resources Corporation 44 Union Blvd., Suite 600 Lakewood, Colorado Uranium Development in.
Clean-up of Lincoln Park, Colorado Introduction The Source of the problem The area effected.
DOE 2010 Long-Term Surveillance and Maintenance Conference November 17, 2010 Loren W. Setlow, CPG Office of Radiation and.
Colorado River Protection Activities on the Moab UMTRA Project Ken Pill, Hydrogeologist Technical Assistance Contractor CMU Upper Colorado River Basin.
B EMIDJI C RUDE O IL S PILL Darren Cartwright Stephen Toone.
Berkeley Lab – Earth Sciences Division ESD PowerPoint Template Simple design and layout which allows content customization 1Go To View Header and Footer.
CO ‑ STAR: Colorado Strategy for Arsenic Reduction A Five Phase Compliance Assistance Program 1. Evaluate 2. Sample 3.Engineer4. Finance 5. Implement.
1 Long-Term Stewardship of Uranium Mills in the United States – Regulatory Issues Keith McConnell, Deputy Director for Decommissioning and Uranium Recovery.
Speciation of uranium in contaminated ground water at Rifle, CO by Nikki Peck.
Location In the mountain of Colorado consist of numerous sites in Denver area which contaminate with radioactive soils and Debris. There are about 65.
1 Kent S. Sorenson, Jr. Ryan A. Wymore Enhanced Bioremediation for Treatment of Chlorinated Solvent Residual Source Areas – Case Study and Implications.
Environmental Remediation Sciences (SC – 23.4) Spring 2005.
The Role of Health Physicists in Uranium Site Cleanups Alisha Stallard, Environmental Health Physicist Radioactive Materials Division Texas Commission.
Colorado School of Mines Research Institute Site DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY AND PROPOSED PLAN.
The Nevada Department of Agriculture Water Quality Program The Nevada Department of Agriculture has been involved in groundwater protection since 1990.
Gary W. Baughman, Division Director 2010 Long-Term Surveillance and Maintenance Conference November 17, 2010.
Cleanup of Uranium Legacy in Southeastern Utah
Part II. Abandoned Mines and Acid Mine Drainage in Boulder County Joe Ryan Civil, Environmental, and Architectural Engineering University of Colorado at.
Upper Blackfoot Mining Complex
Models to predict metal leaching to ground- and surface water: from soil data to scenario studies Bert-Jan Groenenberg, Luc Bonten, Paul Römkens.
NAVAJO UMTRA LTSM UPDATE Madeline Roanhorse Navajo AML / UMTRA Department 2010 Long-Term Surveillance and Maintenance Conference Grand Junction, Colorado.
2010 Long-Term Surveillance and Maintenance Conference Lessons Learned from Small Sites Transitions Tracy Ribeiro U.S. Department of Energy Office of Legacy.
University of Pretoria
Seasonal Changes in Biogeochemistry of a Natural Wetland Receiving Drainage from an Abandoned Mine Diane McKnight and Eric August – University of Colorado.
Athens, June 5, 2006NATO CCMS Pilot Study1 Current Research Topics Dr. Anthimos Xenidis Lab. of Metallurgy National Technical University of Athens (NTUA)
Case Study 1 Application of different tools: RBCA Tool Kit and APIDSS.
Stewardship Principles “[S]tewardship is a pervasive concept and not simply a set of measures to be implemented once remediation is complete.... “Today’s.
2010 Long-Term Surveillance and Maintenance Conference Institutional Controls Featuring the Pinellas Site Jack Craig U.S. Department of Energy Office of.
Modeling to Understand Stormwater Management Efforts Portland Harbor Superfund Site Dawn Sanders City of Portland Bureau of Environmental Services September.
The Radionuclides Rule Analytical Issues and Considerations John Griggs U.S. EPA Office of Radiation and Indoor Air National Air and Radiation Environmental.
1 Integrated Safety Management Workshop Safety Incentives and Worker Involvement Don Metzler, DOE-EM Federal Project Director Joe Legare, S.M. Stoller.
2010 Long-Term Surveillance and Maintenance Conference Applied Science and Technology for the U.S. Department of Energy Office of Legacy Management Grand.
Italy: the new legislation on the remediation of contaminated sites F. Quercia, APAT Tour de Table NATO CCMS Pilot Study Meeting 5-7th June 2006, Athens,
Weldon Spring Site: Past, Present, and Future
Monitored Natural Attenuation and Risk-Based Corrective Action at Underground Storage Tanks Sites Mike Trombetta Department of Environmental Quality Environmental.
United States Nuclear Regulatory Commission Observations and Insights from the August 2010 Workshop on Engineered Barrier Performance Hans D. Arlt Division.
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
Waste Management Strategy Outline - Geography - Future Needs – 5 and 25-Year Time Frames - Capacity - Near-Term Needs - Long Term Needs.
1 NSW Environment Protection Authority (EPA) Carmen Dwyer Director Gas Implementation.
Office of Science U.S. Department of Energy U.S. Department of Energy’s Office of Science The Office of Science Role in Environmental Cleanup Dr. James.
56th Regular Session of the IAEA General Conference
1 Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site LTS&M Planning LTS&M Conference Grand Junction, CO November 16, 2010 Donald Metzler U.S.
FRC Area 3 Site Bioremediation (August 24, 2003 – August 7, 2005) Tests were performed in two phases: (1) a clean water flush to remove bulk nitrate, Al,
Probability of Detecting Atrazine and Elevated Concentrations of Nitrate in Colorado’s Ground Water USGS Water-Resources Investigations Report
Regulatory Framework for Uranium Production Facilities in the U.S.
Regional Integrated Science Projects - Opequon Creek/Shenandoah River Basins Agencies Involved – USGS Water, Geology, GIO/ Geography, and Biology Disciplines,
Past and Present Efforts. History – Early acid rock drainage and wetlands investigations 1989 – US Forest Service Special Use Permit for pilot.
Using an Environmental Management System for Managing DOE’s Legacy DOE Order Workshop 26 February, 2003.
River Corridor Closure Project Safety People Results End State and Final Closure Jeff A Lerch Manager, Long Term Stewardship June 1 and 2, 2006.
Argonne National Laboratory Experience and Perspectives on Environmental Remediation Karen P. Smith Environmental Science Division Argonne National Laboratory.
Northern Projects Management Office in Nunavut Nunavut Mining Symposium April 2012.
The Secondary Mineralization of Ferrihydrite Under Reducing Redox Conditions: An Electrochemical Study Aron Griffin Engineering Science and Mechanics Advisor:
Office of Legacy Management Land Transfer and Reuse November 2006 Steven R. Schiesswohl Senior Realty Officer, Office of Legacy Management.
David K. Paylor Virginia State Board of Health March 17, 2016.
1. 2 Presentation Highlights BGOU overview Scope of the Remedial Investigation Investigation results Schedule 2.
1 Groundwater Pollution GW 10 Monitored Natural Attenuation.
Farmland Industries Lawrence Site Briefing for the City of Lawrence March 11, 2008 March 11, 2008.
National Institutes of Health U.S. Department of Health and Human Services William A. Suk, Ph.D., M.P.H. Director, Superfund Research Program Chief, Hazardous.
Re-imagining Mining Sites: Kennecott North and South Zones
Uranium in Colorado: Past, Present, and Potential Future
FIELD INVESTIGATION OF IN SITU LIME NEUTRALIZATION OF ACIDIC SEDIMENT
Changing Water Cycle dry tropical land wet Precipitation Change (%)
Jon Risgaard, Wastewater Branch Rick Bolich, Raleigh Regional Office
Exhibit A: Monitoring well and surface water sampling locations.
Horst Monken-Fernandes Waste Technology Section NEFW
Department of Civil Engineering
TO LITIGATE, OR NOT TO LITIGATE
Trihalomethanes Removal Evaluation
Presentation transcript:

2010 Long-Term Surveillance and Maintenance Conference Old Rifle Title I Processing Site, Rifle, Colorado What Are They Doing on My Site? Richard Bush, Rifle Site Manager November 16, 2010

2010 Long-Term Surveillance and Maintenance Conference 2 U.S. Vanadium Company Mill—1924

2010 Long-Term Surveillance and Maintenance Conference 3 Union Carbide Mill—circa 1957

2010 Long-Term Surveillance and Maintenance Conference 4 Old Rifle Site—1967 After Umetco Cleanup

2010 Long-Term Surveillance and Maintenance Conference 5 Old Rifle Site—1999 Post-UMTRA Cleanup

2010 Long-Term Surveillance and Maintenance Conference 6 Old Rifle Mill Site—Today

2010 Long-Term Surveillance and Maintenance Conference 7 Site Conceptual Model Groundwater contamination from raffinate ponds and tailings Surface cleanup standard Ra-226; metals left Inflow of water from the north via seeps and drainage ditch contributes groundwater to site Colorado River contributes to flushing

2010 Long-Term Surveillance and Maintenance Conference 8 Site Conceptual Model Diagram

2010 Long-Term Surveillance and Maintenance Conference 9 Regulatory History 1996: Surface cleanup completed 1998: Licensed 1999: Final Site Observational Work Plan for the UMTRA Project Old Rifle Site 2002: Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site meets Nuclear Regulatory Commission approval Compliance Natural flushing for uranium, maximum contaminant level (MCL) mg/L Alternate concentration limits for vanadium and selenium, higher than MCL based on background

2010 Long-Term Surveillance and Maintenance Conference 10 Office of Science Investigations Two basic questions posed Can we immobilize uranium in the groundwater? How long will it last after amendments cease? Can we better predict uranium removal? Natural flushing relies on modeling Approach – to support compliance strategy Enhance microbial reduction of soluble uranium(VI) to precipitated or sorbed uranium(IV) Improved reactive transport simulations to predict removal of uranium from groundwater

2010 Long-Term Surveillance and Maintenance Conference 11 Recent Developments, Plume Map

2010 Long-Term Surveillance and Maintenance Conference 12 Recent Developments, T/C Plots

2010 Long-Term Surveillance and Maintenance Conference 13 Groundwater Surface Map—Spring 2007

2010 Long-Term Surveillance and Maintenance Conference 14 Conclusions Site not flushing as predicted Site more complex than expected Additional characterization/new modeling effort? Revisit compliance strategy in light of low risk U.S. Department of Science adding insights to uranium sequestration, cycling Integrated Field-Research Challenge provides an outdoor lab Leveraged funding for science and technology Future to expand to floodplain-wide analysis?