Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.

Slides:



Advertisements
Similar presentations
Flexible Budgets and Standard Costs
Advertisements

Cost Management Chapter 10 Static and Flexible Budgets
Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Flexible Budgets Distinguish between.
©2008 Prentice Hall Business Publishing, Introduction to Management Accounting 14/e, Horngren/Sundem/Stratton/Schatzberg/Burgstahler Introduction.
Cost Accounting Horngreen, Datar, Foster Flexible Budgets, Variances, and Management Control: I Session 7.
7 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Flexible Budgets, Variances, and Management Control: I Chapter.
Copyright © 2007 Prentice-Hall. All rights reserved 1 Flexible Budgets and Standard Costs Chapter 23.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster An Introduction to Cost Terms and Purposes Chapter 2.
Contemporary Engineering Economics, 4 th edition, © 2007 Estimating Profit from Production Lecture No. 31 Chapter 8 Contemporary Engineering Economics.
© 2014 by McGraw-Hill Education. This is proprietary material solely for authorized instructor use. Not authorized for sale or distribution in any manner.
© 2014 by McGraw-Hill Education. This is proprietary material solely for authorized instructor use. Not authorized for sale or distribution in any manner.
Copyright © 2012 Pearson Education Chapter Copyright © 2012 Pearson Education Develop activity-based costs (ABC)
1-1.
Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall.
Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall
Copyright © 2014 Pearson Education, Inc. publishing as Prentice Hall
Additional Topics in Variance Analysis Chapter 17 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Fundamentals of Variance Analysis Chapter 16 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Job Order and Process Costing
Copyright © 2003 Pearson Education Canada Inc. Slide 7-76 Chapter 7 Flexible Budgets, Variances and Management Control: I.
Copyright © 2003 Pearson Education Canada Inc. Slide 7-91 Chapter 8 Flexible Budgets, Variances, and Management Control: II.
23 Performance Evaluation Using Variances from Standard Costs
8 - 1 StandardStandard/Budget AdvantageAdvantage of Standard Costs StandardStandard Setting Direct Materials- Direct Labor Var Manufacturing Manufacturing.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 8 - Flexible Budgets and Variance.
McGraw-Hill/IrwinCopyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved. Fundamentals of Variance Analysis Chapter 16.
Chapter 23 Flexible Budgets and Standard Cost Systems
Chapter 21 Flexible Budgets and Standard Costing.
Copyright © 2015 Pearson Education, Inc., All Rights Reserved Flexible Budgets, Direct-Cost Variances, and Management Control.
Chapter Nine Marketing Channels and Channel Mapping
Marketing by the Numbers
Chapter Sixteen Market-Based Management and Financial Performance.
Chapter 11 Pricing and Credit Strategies Copyright ©2009 Pearson Education, Inc. Publishing as Prentice Hall 1 Pricing and Credit Strategies.
Controlling Manufacturing Costs: Standard Costs
Copyright © 2008 Prentice Hall All rights reserved 11-1 Flexible Budgets and Standard Costs Chapter 11.
Standard Costing and Variance Analysis
Variances Short summary. Static Budgets A static budget ( master budget) is prepared for only one level of a given type of activity. All actual results.
Flexible Budgets and Standard Costs Chapter 23 HORNGREN ♦ HARRISON ♦ BAMBER ♦ BEST ♦ FRASER ♦ WILLETT.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
CPS ® and CAP ® Examination Review MANAGEMENT, Fifth Edition By Haney and Mazzola ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River,
Chapter 16 Fundamentals of Variance Analysis.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Flexible Budgets and Variance Analysis.
Chapter 22. Prepare a flexible budget for the income statement.
Flexible Budgeting Chapter 07, 08
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 22 1.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Estimating Profit from Production.
Copyright © 2007 Prentice-Hall. All rights reserved 1 Flexible Budgets and Standard Costs Chapter 11.
Chapter 22. Prepare a flexible budget for the income statement.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
Chapter 23 Flexible Budgets and Standard Cost Systems Demonstration Problems © 2016 Pearson Education, Inc.23-1.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Flexible Budgets/Variances I Chapter Seven. Static Budget Example Webb Co. manufactures and sells jackets. Budgeted variable costs per jacket are as follows:
Variance analysis 1 、 Basic variances 2 、 The reasons for variances 3 、 Operating statements 4 、 Investing variances 5 、 Materials mix and yield variances.
Flexible Budgets and Standard Cost Systems
Chapter 19 Manufacturing Overhead Standard Costs: Completing the Accounting Cycle for Standards costs.
17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting.
Standard Costing and Variance Analysis
© 2017 by McGraw-Hill Education
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
AMIS 3300 Chapter 9.
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
© 2017 by McGraw-Hill Education
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Variances, and Management Control: I
Presentation transcript:

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. 2 Prepare a flexible budget for the income statement Prepare an income statement performance report Identify the benefits of standard costs and learn how to set standards Compute standard cost variances for direct materials and direct labor

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. 3 Analyze manufacturing overhead in a standard cost system Record transactions at standard cost and prepare a standard cost income statement

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Budget variance—the difference between an actual amount and a budgeted figure Managers use variances to operate a business Important to know why actual amounts differ from the budget Enables managers to identify problems and decide upon actions to take 4

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Prepare a flexible budget for the income statement 1 1 5

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Static budget Prepared for one level of sales volume Does not change after developed Variances classification Favorable (F) if an actual amount increases operating income Unfavorable (U) if an actual amount decreases operating income Flexible budget Prepared for several different volume levels within a relevant range Separates fixed and variable costs 6

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Need to know: Selling price per unit Variable cost per unit Total fixed costs Different volume levels within the relevant range 7

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Consider the following definitions. Give the cost term to the correct definition—Flexible Budget, Flexible Budget Variance, Sales Volume Variance, Static Budget, and Variance 1.A summarized budget for several levels of volume that separates variable costs from fixed costs. 2. The budget prepared for only one level of sales volume. 3. The difference between an actual amount and the budget. 4. The difference arising because the company actually earned more or less revenue, or incurred more or less cost, than expected for the actual level of output. 5. The difference arising only because the number of units actually sold differs from the static budget units. 8

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Prepare an income statement performance report 2 2 9

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Managers need to know why variance occurred To pinpoint problems To take corrective action Managers divide the static budget variance into two broad categories Flexible budget variance Sales volume variance 10

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Computations 11

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. 12

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Moje, Inc., manufactures travel locks. The budgeted selling price is $19 per lock, the variable cost is $8 per lock, and budgeted fixed costs are $15, Prepare a flexible budget for output levels of 4,000 locks and 7,000 locks for the month ended April 30, Moje, Inc. Flexible Budget Month Ended April 30, 2012 Flexible BudgetOutput Units (Locks) per Output Unit4,0007,000 Sales revenue Variable expenses Contribution margin Fixed expenses Operating income (loss)

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Identify the benefits of standard costs and learn how to set standards

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. 15 Budget for a single unit Each unit has standards for price and quantity Inputs: Direct materials Direct Labor

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Direct materials Direct labor Manufacturing overhead Price Standards 16

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Direct materials Direct labor Manufacturing overhead 17

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Determine cost standards for materials, labor, and overhead Direct materials price standard for vinyl: Purchase price, net of discounts $1.90 per square foot Delivery, receiving, and inspection 0.10 per square foot Total standard cost per square foot of vinyl $2.00 per square foot Direct labor (DL) price (or rate) standard: Hourly wage $ 8.00 per direct labor hour Payroll taxes and fringe benefits 2.50 per direct labor hour Total standard cost per direct labor hour $10.50 per direct labor hour Variable overhead price (or rate) standard: Fixed overhead price (or rate) standard: 18

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. 19

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Helps managers: Prepare the master budget Set target levels of performance (static budget) Identify performance standards (standard quantities and standard costs) Set sales prices of products and services Decrease accounting costs 20

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Once established, use the standard cost to assign costs to production Once a year, compare actual production costs to standard costs to locate variances Variance Relationships 21

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Measures how well the business keeps unit costs within standards Difference in price of an input, multiplied by the actual quantity used 22

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Measures how well the business uses its materials or human resources It is the difference in quantities multiplied by the standard price per unit 23

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. The Relationships Among Price, Efficiency, Flexible Budget, Sales Volume, and Static Budget Variances 24

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Compute standard cost variances for direct materials and direct labor

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Main concern: The $4,000 unfavorable flexible budget variance 26

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Identify fixed and variable costs Recall standard cost (computed earlier) Overhead Identify the cost of one unit of production Materials = 1 square foot per DVD = $2.00 Labor =.40 hours per DVD = $4.20 Variable Overhead =.40 hours per DVD = $0.80 Actual Sales Results = 10,000 27

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. 28

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. To compute variances, use the cost computed for the flexible budget and actual results Follow the direct materials variance of $2,800 29

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Two types of direct materials variances: Direct materials price variance Direct materials efficiency variance 30

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. To compute variances, use the cost computed for the flexible budget and actual results Follow the direct labor variance of $

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Two types of direct labor variances: Direct labor price (rate) variance Direct labor efficiency variance 32

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Johnson, Inc., is a manufacturer of lead crystal glasses. The standard materials quantity is 0.8 pound per glass at a price of $0.30 per pound. The actual results for the production of 6,900 glasses was 1.1 pounds per glass, at a price of $0.40 per pound. 1.Calculate the materials price variance and the materials efficiency variance. 33

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Johnson, Inc., manufactures lead crystal glasses. The standard direct labor time is 0.3 hour per glass, at a price of $13 per hour. The actual results for the production of 6,900 glasses were 0.2 hour per glass, at a price of $10 per hour. 1.Calculate the labor price variance and the labor efficiency variance. 34

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Analyze manufacturing overhead in a standard cost system

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Total overhead variance—the difference between actual overhead cost and standard overhead allocated to production 36

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. To compute variances, use the cost computed for the flexible budget and actual results Follow the variable overhead variance of $1,000 37

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Two types of variable overhead variances: Variable overhead spending (price) variance Variable overhead efficiency variance 38

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. To compute variances, use the cost computed for the flexible budget and actual results Follow the fixed overhead variance of $2,700 39

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Two types of variable overhead variances Fixed overhead spending variance Fixed overhead volume variance 40

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Refer to the data from Johnson, Inc., in S23-6 and S23-7. The following information relates to the company’s overhead costs: Static budget variable overhead $ 9,000 Static budget fixed overhead $ 4,500 Static budget direct labor hours 1,800 hours Static budget number of glasses 6,000 Johnson allocates manufacturing overhead to production based on standard direct labor hours. Last month, Johnson reported the following actual results: actual variable overhead, $10,200; actual fixed overhead, $2, Compute the standard variable overhead rate and the standard fixed overhead rate. 41

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Refer to the Johnson data in S23-6, S23-7, and S23-9. Compute the variable and fixed overhead variances. Use Exhibits and as guides. 42

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Record transactions at standard cost and prepare a standard cost income statement

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Records variances from standards as soon as possible Records direct materials price variances when materials are purchased Work in process inventory is debited at standard input quantities and standard prices 44

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Manufacturing wages is debited at standard prices for direct labor hours actually used Work in process inventory is debited for the standard cost per direct labor hour that should have been used 45

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Record actual overhead cost for June Record the overhead allocated to Work in process inventory computed 46

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Record the transfer of the standard cost of the DVDs completed from Work in process inventory to Finished goods Record the transfer of the cost of sales of the 10,000 DVDs sold at standard cost 47

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Closes the Manufacturing overhead account and records the overhead variances 48

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. 49

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. 50

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. 51

Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. 52 Copyright All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of the publisher. Printed in the United States of America.