Aditya Manjrekar Industrial and Systems Engineering KGCOE, RIT.

Slides:



Advertisements
Similar presentations
EVALUATOR TIPS FOR REVIEW AND COMMENT WRITING The following slides were excerpted from an evaluator training session presented as part of the June 2011.
Advertisements

1 Distribution Capacity Analysis P09721 MSD II Final Presentation Distribution Capacity Analysis P09721 MSD II Final Presentation Aaron Heyman – Lead Jose.
Part 1: Basic Fashion and Business Concepts
Self-Service Business Intelligence for the Product Management Department (Concurrency Corporation)
OverviewOverview – Preparation – Day in the Life – Earnings – Employment – Career Path Forecast – ResourcesPreparationDay in the LifeEarningsEmploymentCareer.
Artificial Limb Project By Casey Dill. Mission Statement This project will improve upon existing plans for an artificial arm with the same capabilities.
Maxing Out Your Credit... and Accounts Receivable Department Potential Windy City Session 11 10:10 am – 11:00 am Friday, June 8 th 2012.
Developing GIS for Scottish Canals
Strategic Capacity Planning Defined
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
R. I. T Mechanical Engineering Engineering Design Brief Case Study: What is the Engineering Design Process and Why is it Critical? Rochester Institute.
Andreana Crance, Industrial & Systems Engineering Matt Syska, Industrial & Systems Engineering.
MSD-I Project Review Modular Motion Tracking Sensors 1.
EDGE™ Concept Level Project Plan P08043 – Magnet Centering Device Aaaron Burger (Mechanical Engineer)
Cooper Vision Team Status Update Friday December 19, 2008.
ELM4701/02: ELM Projects I & II The mini-project has served as a practice project. It has given us the opportunity to explain our expectations and you.
Mgt 240 Lecture MS Excel: Decision Support Systems September 16, 2004.
EDGE™ Project Status Update PYYNNN – Project Title Here DPM Student Presenter 1 (Dept) DPM Student Presenter 2 (Dept) DPM Student Presenter 3 (Dept) USE.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
Meet the Team Aaron Heyman  5 th Year Industrial Engineer  Team Lead Adam Cook  5 th Year Industrial Engineer Jose Rodriguez  5 th Year Industrial.
Case study of Oakley, Inc. Prepared by Donatas Sumyla 12/14/2004.
EDGE™ Project Status Update P09141 – Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
McGraw-Hill/Irwin Copyright © 2008, The McGraw-Hill Companies, Inc. All rights reserved.
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
EDGE™ Project Status Update P09141 – Satellite Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
Principles of Information Systems, Seventh Edition2 An organization’s TPS must support the routine, day-to- day activities that occur in the normal course.
Distribution Capacity Analysis P09721 MSD 1 Project Review Aaron Heyman – Lead Jose Rodriguez Adam Cook Abraham Taleb Sponsor: CooperVision.
Meet the Team Abraham Taleb  4 th Year Industrial Engineer Jose Rodriguez  5 th Year Industrial Engineer Aaron Heyman  5 th Year Industrial Engineer.
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
ABVI Process Improvement Team Adam Kelchlin Dave Netti Jeff Sweet Dan Brauksieck Chris Sinclair.
McGraw-Hill/Irwin Copyright © 2008, The McGraw-Hill Companies, Inc. All rights reserved.
LEARN. NETWORK. DISCOVER. | #QADexplore Implementing Business Process Management: Steps to Success WCUG – November 18, 2014.
The New Product and Services Development Process By SK Winning Innovations for Tomorrow (WIT)
Sponsored by Wegmans P Automation/Improvement of Packaging on the Cookie Line Stephanie Rager Bruno Coelho.
Copyright © 2003 by Prentice Hall Computers: Tools for an Information Age Chapter 14 Systems Analysis and Design: The Big Picture.
Feasibility and Business Planning
Employer Partnerships and Older Workers IAJVS Annual International Conference 2006 Ernie DuPont Director Workforce Development CVS/pharmacy.
P09713 – Bread and Roll Scaling Room Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Kate Gleason.
Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Levi Stuck Evan DeCotis Kate Gleason Stephanie Rager.
NMSU Pathways Workshop September 18-20, 2014 Design Thinking, Low Res Prototyping, Assessment and ABET Mashup.
Carl Holmes Christy Lee Vendor Information SAP is headquarters is in Walldorf, Germany. Largest computer software company in the world. 47,804 employees.
OPERATING ROOM DASHBOARD Virginia Chard, RN, BSN, CNOR
Feasibility and Business Planning
1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases.
Supply Chain Management: From Vision to Implementation Chapter 4: New Product Development Process: Managing the Idea Infrastructure.
Chapter 7 Applying UML and Patterns -Craig Larman
1 Final Status Report Sonali PagadeNibha Dhagat David Ziman Reginald Bradshaw II Sebastian Schagerer Janet Xu Phan Marvel Electronics & Home Entertainment.
Senior Design 4106 A & B Spring 2008 Tutorial on Workforce Presentations (404) Office 314 Groseclose Workforce Communication.
Business plan Name: Date: Author: Version:. business plan This section is usually the first in your business plan but can be finalized when the other.
8 - 1 Copyright © 2006, The McGraw-Hill Companies, Inc. All rights reserved.
Riordan Manufacturing Going Green Team Member Names Here University of Phoenix.
1 Advanced Collaborative Environments Kris Brown Carmel Conaty Johnny Medina.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
© BMA Inc All rights reserved. Lean reporting & control Performance Measurements.
What has been accomplished at the end of MSD 1 & 2?
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
EDGE™ Preliminary Project Plan P09102 – METEOR Stage Separation System JJ Guerrette (ME)
You’re one of a kind. Your career opportunity should be too.
Management Information Systems
Advanced Manufacturing Career Pathways
Concept Level Project Plan P08008 – ArcWorks Process Improvement
P07107: Mission Control Procedures Aerospace Systems and Technology
P10457: D-R Process Improvement
Project Readiness Review P10029 – Air Muscle Artificial Limb
Project Status Update P09023 – Air Muscle Artificial Limb Next Generation Jim Breunig (ME)
Project Status Update PYYNNN – Project Title Here
Final Status Update P09006 – Upper Extremity Exerciser
Enterprise Business Systems
Presentation transcript:

Aditya Manjrekar Industrial and Systems Engineering KGCOE, RIT.

Project Status Update Project NameCooper Vision Project NumberP10714 Project FamilyLean Production TrackProcess Innovation Start Term (Fall ) for MSD1 End Term ( Winter) for MSD2 Faculty GuideJohn Kaemmerlen (ISE) Industrial Teaching AdviserPhil Bryan Faculty ConsultantAndres Carrano (ISE) Primary CustomerSarah Pittman, Process Improvement Manager, Cooper Vision.

About Cooper Vision Manufacturing prescription contact lenses for five decades Thousands of leading brand names Hydra soft Vertex Preference Frequency Avaira America's second largest maker of prescription contact lenses. #1 maker of toric contact lenses for the correction of astigmatism.

Background Information The Cooper Companies, Inc. is a specialty health care company. Its two business units serve niche markets in the medical device market. Cooper Vision (CVI) markets a broad range of contact lenses throughout the world. Cooper Surgical (CSI) markets diagnostic products, surgical instruments, and accessories for the women's healthcare market. Headquarters at Fairport, NY. Extensive network of facilities in 12 countries across five continents One of the highest level of on-time order fulfillment in the industry.

Distribution Center in Rochester Currently they operate a 250,000 square foot distribution center in Henrietta, NY. Very good picking system Pick to light Pick to voice. Automated- Integrated conveyer line. Normal Order Picking- 24 Hrs goal. Bulk Order Picking- 48 Hrs goal. On hand inventory for any if given product is never zero. Sarah Pittman, Process Improvement Manager for Cooper Vision – Alumni of the ISE Department, RIT.

Phase 0: Planning Mission Statement Product Description /Project Overview The facility at Henrietta, is going through process improvement changes to better order fulfillment time, customer satisfaction and streamline their distribution. Value added changes need to made to the system through computer tools,improvements in facility and equipments and through kaizen events. Key Business Goals/Project Deliverables The primary business goals of this project are to Improve Order picking and shipping times. Improve Workforce utilization due to variable demand levels. Increase the market share of Cooper vision lenses, by improving customer satisfaction levels. Primary Market /Project Opportunities The primary market for this is the central distribution facility in Henrietta NY. Secondary Market /Project Opportunities Secondary markets for this system are the other distribution center around USA and the rest of the world, that can use similar tools and improvements to better streamline their distribution and fulfill customer needs. Stakeholders Cooper Companies- Cooper Vision (CVI) Other Stakeholders in the project include the following: The Final lens user. The retailer /seller, such as pharmacists and 1800-Contacts. Doctors,Practitioners. The Community in which the facility resides.

Phase 1: Concept Development Identify Customer Needs - Interviews Primary Customer(s) Sarah Pittman and Jim Della Valle of Cooper Vision facility in Henrietta. Not Interviewed yet. Sarah Pittman and Jim Della Valle to be interviewed at the distribution facility during week 6 or 7 in Spring 09. Indicated to the current project team that there are many more improvement tasks that can become future MSD projects. Findings to be captured in the format of a textual document with supporting pictures, charts and tables. Other Stakeholder(s) Secondary Stakeholder is the RIT Senior Design Program Interviewed Prof John Kaemmerlen (ISE) in Week 5, spring quarter. Findings noted in Log Book. Initial knowledge to be entered on Edge. Past Senior Design Team(s) Interviewed Current Multidisciplinary Senior Design team – Winter/Spring with Team Lead Aaron Heyman (ISE) Current usefulResources to draw upon Documentation of previous Interviews and Brainstorming sessions. Capacity Analysis tool ( Excel based for the Henrietta facility ) white paper that describes in detail the steps taken by the team to complete process Improvement tasks. Charts and tables describing their findings. Simulation Model created for Advanced simulation course in ARENA.

Phase 1: Concept Development Identify Customer Needs - Interpret Needs Statements:  The customer would like to Invest time and money in the MSD project to get a quality tools and tangible process improvement ideas.  The results of this project should generate computer tool which would be. accurately represent the real needs of the distribution center. require minimum training and is user friendly. alert the user when a given demand input is not realizable given actual capacity of facility. visualize all the information on a single screen.  The customer would also like the team to suggest validated process improvement ideas to improve order picking and workforce utilization.  The facility at Henrietta, is going through process improvement changes to better order fulfillment time, customer satisfaction and streamline their distribution.  List of suggested 30 to 50 different improvement tasks.  Some primary needs are worked on by current MSD team and next few tasks need to be completed by future teams.

Affinity Diagram. Order picking and shipping Decrease order picking time. Decrease order shipping time Increase order picking accuracy. Ship orders within target times. Demand forecasting Indicate any trend in weekly, monthly, yearly demand. Indications of seasonal demands of specific products. Workforce Utilization Determine daily requirement Indicate if enough workforce is available to fulfill requirement. Have work force utilization close to 100%

Objective Tree We need this product because … Orders need to be shipped earlier. No Mistakes in picking No reworking Faster picking required. We need better level of customer satisfaction. Orders shipped earlier than expected. High quality of products shipped. Correct packaging and labeling. Labor needs to be utilized efficiently Maximum workforce utilization. High worker job satisfaction. Low variable costs.

Function Tree This project Needs to … Indicate Daily labor requirements. Be easy and quick Show detailed requirements Alert if under staffed. Forecast trends in the weekly, monthly & yearly demand. Allow enough time to hire more workers. Indicate changes to the manufacturing facility Help in making key decisions. Improve Picking system Decrease picking time. Ergonomic consideration. Eliminate mistakes and rework

HOQ Main Body VOC to VOE Indicate Daily labor requirements. Forecast trends in the weekly, monthly & yearly demand. Improve Picking system Orders need to be shipped earlier 519 We need better level of customer satisfaction 377 Labor needs to be utilized efficiently 975

Future Plan Discuss and finalize Staffing requirements Discuss and finalize Resource requirements. Schedule Meetings and Interview key stakeholders. Attend Final design review and poster presentation of the current MSD 2 team. Document Team Values and Norms. Determine preliminary Work Breakdown Structure. Make and present Final Presentation too include. Planning:- Mission Statement,Project Relevance, Staffing, Requirements, Intellectual Property Considerations. Final Customer Needs :-Final Affinity Diagram, Objective tree, Function tree and HOQ. Issues & Risks mitigation plan Make Marketing Video for future MSD I, MSD II students.

Preliminary Schedule Attending Mid-quarter Design review. Planning to attend Future customer feedback meetings. Final design review Poster presentation Wk 6Wk 7Wk 8Wk 9Wk 10 Staffing requirement Create work breakdown structure. Start working on Marketing video. Start working on final presentation. Present all Deliverables.

Thank you