There is Much More to Protocols than Good M&V Steve Kromer Chair, IPMVP Inc. Paolo Bertoldi European Commission DG JRC.

Slides:



Advertisements
Similar presentations
4 basic approaches to determining energy efficiency benefits (savings) 1.Stipulated or deemed savings 2.Individual Building Metering – Measurement and.
Advertisements

Introduction to Monitoring and Evaluation
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
Ensuring Effective Monitoring, Certification and Verification of Emissions by Jed Jones Lloyd’s Register.
Energy Savings Performance Contracting Presenters Name Energy Services Coalition
BPA Guidelines for Measurement & Verification of Energy Efficiency Measures Presented at Brown Bag Session November 29, 2006.
Energy Performance Analysis with RETScreen
1 | ESPC Technical Assistance Team eere.energy.gov Welcome to Today’s Training for State and Local grantees on Energy Savings Performance Contracting:
1/14 Policies/Programmes to Promote the Development of ESCO 5 March, 2012 APERC Workshop, Kuala Lumpur Bing-Chwen Yang Team Leader Asia Pacific Energy.
MEASUREMENT & VERIFICATION
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
Page 1 July 2014 Capacity Building of Banks/FIs For EE Project Financing Capacity Building of Banks and Financial Institutions for Energy Efficiency Project.
International Performance Measurement and Verification Protocol
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Franco Barnard M&V Project Engineer Baseline Service Level Adjustments of ECM on Compressed Air Systems 16 August 2012.
Energy Management in Brazil August 9th, 2011 Rio de Janeiro | RJ By: Pedro Paulo da Silva Filho | Grupo SAGE Desenvolvimento: SAGE US – Brazil Industrial.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
Need for a Professional Approach in Building Energy Audit Pradeep Kumar Sr. Technical Specialist.
Carbon Trading: The Challenges and Risks John Drexhage Director, Climate Change and Energy International Institute for Sustainable Development Agriculture.
Energy Saving Improvement Programs aka: ESIP; ESCO; P.L. 2009, c. 4 Gordon Ball, Senior Procurement Specialist Division of Local Government Services Introducing…
Using Uncertainty Modeling to Optimize M&V in ESPC Projects Discussion Document 10/31/02.
Financial Assessment and
Practical Experiences in Applying Savings M&V
The GPIC/ASHRAE Partnernship William Bahnfleth, PhD, PE Treasurer, ASHRAE High-Performance Building Congressional Caucus Coalition October 27, 2011.
Managing Operational Energy in Buildings
Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC.
Efficiency Valuation: Concepts and Practice Steve Kromer Efficiency Valuation Organization Taipei, Taiwan October 25, 2005.
IPMVP Update M&V Summit, New Orleans May 6th, 2003 Satish Kumar.
PACE Technical Standards Eddy Trevino, P.E., Program Manager State Energy Conservation Office August 2015.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
M&V Part 2: Risk Assessment & Responsibility Allocation.
Phoenix Convention Center Phoenix, Arizona M&V Contracting / Business Perspective Track 5: Project Financing Session 5: M&V: High- and Low-Level Perspectives.
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
© 2009 AirAdvice, Inc. Increasing Profitability Through Energy Services A Comprehensive Program To Deliver Energy and Sustainability Services.
M&V Part 1: D.O. Review. 1-2 Your Instructor Mark Stetz, P.E. Ø Worked with FEMP since Ø Serves as FEMP’s M&V Specialist. Ø Contributed to FEMP.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
Forecasting and Verifying the Energy Savings for Web-Enabled Thermostats in Portable Classrooms: William E. Koran, P.E. Quantum Energy Services and Technologies.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
M&V Part 4: M&V Plan Review. 4-2 M&V Plan Review Ø FEMP Documents F M&V Overview Checklist (Phase 2) F Final M&V Plan Checklist (Phase 3) Ø Risk & Responsibility.
Forecasting and Verifying Energy Savings for Web-Enabled Thermostats in Portable Classrooms: William E. Koran, P.E. Quantum Energy Services and Technologies.
RTF Custom Protocols: Background, Issues and Critical Elements February 8, 2012 Regional Technical Forum Subcommittee on Impact Evaluation and Custom Protocol.
M&V Plan Template Lia Webster, Nexant New Orleans M&V Summit May 2003.
National Action Plan for Energy Efficiency Model Program Evaluation Guide Marian Brown Southern California Edison
Phoenix Convention Center Phoenix, Arizona ESPC Overview Project FinancingESPC Large and Small: The Basics of ESPC Tom Hattery, DOE-FEMP Federal Project.
Rudan ltd. For efficient energy management. Our Vision With efficient management and application of new technologies, to become a leading company in the.
1 Limestone County School District Energy Update Year Eleven Report September 2008 – August 2009.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong.
Comparison of CA Evaluation Protocols, CA Framework, IPMVP and CPUC Policy Manual* A preface to group discussion *In terms of how they define.
Energy Project M&V: Reports that Add Value October 27, 2015.
Week 9 Common Commercial Building energy efficiency measures (Energy Management Opportunities)
Energy Efficiency in Public Buildings in Brazil – Guidelines for Implementation Anand Subbiah, Nexant Inc. April 30, 2002, Kubitschek Plaza Hotel, Brasilia,
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Presented by: Todd Amundson, BPA Jane Peters, research into action Ryan Fedie, BPA Update.
1 May 10, 2011 Procurement and Financing Options for Facility Improvements Siemens Industry, Inc. Building Technologies.
Regional Technical Forum Recommissioning commercial retail facilities: A whole building approach to energy savings April 7th, 2009 Presented by: Jeremy.
REBUILD AMERICA. Why look at the bills? l Bills are the bottom line –they prove the savings!
Chapter 3: Purchasing Research and Planning Strategic Planning for Purchasing Strategic planning for purchasing involves the identification of critical.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
Presented to The Raymore Peculiar Schools Board of Education Van McLain Energy Educator/Manager February 26 th, 2007Energy Management Conservation Program.
Road Investment Decision Framework
Rick Khan, Director Federal Energy Management Program Department of Energy FEMP: Leading and Partnering with Agencies to Design and Build High Performing,
© 2010 South-Western, Cengage Learning, Inc. All rights reserved.
Energy Savings Performance Contracts & Energy Service Companies
Guaranteed Energy Savings Performance Contracting
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
WHERE THE ESP INDUSTRY MEETS THE FUTURE
Delran Township School District
How to ensure that savings are real?
Presentation transcript:

There is Much More to Protocols than Good M&V Steve Kromer Chair, IPMVP Inc. Paolo Bertoldi European Commission DG JRC

M&V Purposes Verify performance of energy efficiency projects and programme Assists in budgeting Use of standardized M&V methods reassures project financiers that projects are “bankable.” Facilitates emissions trading

What is M&V? Measurement of Energy Savings  Savings = Reductions resulting from equipment and operational changes to a facility to improve its energy use. Verification of successful achievement of:  Savings anticipated in the energy audit, and/or  Savings as claimed So M&V is: Determining and evaluating actual savings achieved by a project or programme

Quantifying What’s Not There “Savings” are the product of energy efficiency projects. “Savings” may occur, but can never be measured directly. “Savings” may vary, depending on how changes are addressed

Watt-hour (Wh) meters and What Would Have Happened (WWHH) Meters 250, , ,000 1,000,000 kWh Baseline PeriodPerformance Period WWHH meter Wh Meter

Watt Meters and What Meters Watt Meter – Measures Energy  Can be calibrated  Reflects accuracy of the hardware  Accuracy can be specified and tested What Meter –  Is calculated  Is as accurate as the model  Accuracy cannot be tested directly

M&V Theory Savings cannot be measured directly Each project needs a different M&V Plan defining how to determine savings. For each project, decide:  the boundary of measurement – just the retrofitted system or the whole facility?  the method of adjustment for routinely changing variables  where and how to measure the baseline energy use and conditions  who, what, where, and when to measures changes from baseline conditions

250, , ,000 1,000,000 Jan-93Jul-93Jan-94Jul-94Jan-95Jul-95Jan-96 kWh Baseline PeriodPerformance Period Installation Period Three Typical Time Periods

M&V Theory (cont) M&V Planning must consider:  Facility Characteristics  “Fixed” parameters and use/operating data from the investment grade audit  Contractual Environment  ESCO contract allocates risks arising from changes occurring within the boundary of measurement  Value of expected savings  M&V costs must be REASONABLE relative to savings  Uncertainty of metering and analysis  Cost of M&V should reflect acceptable level of uncertainty for the parties

M&V in Practise Find the right amount of M&V for each project:  How much can you assume parameters vs measure them?  Number of meters and their accuracy  Length of the measurement period, before and after retrofit  Who collects what information about changes since the baseline. Baseline data is needed anyway - to design retrofits. Ongoing operations always change, and are always monitored some way. The changes may not be recorded without proper M&V.

M&V In Practise (cont) The presence of widely recognized M&V standards gives potential clients and bankers comfort =  MORE ESCO PROJECTS. Widely recognized standards define “good practise,” minimizing arguments about actual savings =  FEWER DELAYS IN ESCO’S CASH FLOW  FEWER BROKEN RELATIONSHIPS

M&V Protocol Development Activities (U.S.) IPMVP – Independent, volunteer organization ASHRAE 14 – Engineering Standards FEMP – Federal contracting

What is IPMVP Savings verification framework for commercial and industrial energy conservation measures (ECMs) Standardizes M&V terminology and defines various M&V options Risk management tool that allocates risks between buyer and seller of energy services

Vision and Mission IPMVP’s vision is a global marketplace that properly values energy and water efficiency. IPMVP’s mission is to promote worldwide investment in energy/water efficiency projects by helping to quantify and manage the associated performance risks.

IPMVP Inc. IPMVP Inc. is a non-profit organization, dedicated to serving the energy and water efficiency marketplace through: the development of M&V protocols; relevant M&V training and education materials; building and maintaining a community of IPMVP users focused on advancing the state of M&V around the world.

IPMVP – Three Volumes IPMVP Vol I: Concepts and Options for Determining Savings (2002 Edition) - Currently available in English, French, and Portuguese. Will soon be available in Italian IPMVP Vol II: Concepts and Practices for Improving Indoor Environmental Quality (2001 Edition) IPMVP Vol III: Applications  Concepts and Options for Determining Energy Savings in New Construction  M&V for Renewable Energy Technologies

Conclusion Quantifying Project Results is tricky Valuing Quantified Results Compounds Trickyness Protocols Provide Broad Instructions and Options Programs Dictate Cost and Accuracy Each Project Needs an M&V Plan