All logos in this presentation is courtesy of the Florida Institute of Technology Robotics and Spatial Systems Laboratory and the Florida Tech Office of.

Slides:



Advertisements
Similar presentations
NGAS – The Next Generation Archive System Jens Knudstrup NGAS The Next Generation Archive System.
Advertisements

Skyscraper Construction
Final Capstone Design Presentation MAE 4194 – Mechanical Design 2 Lok Wah Jameson Tai  William M. Rae  Justin L. Nunn Faculty Advisor: Pierre M. Larochelle,
Design Concepts and Process Analysis for Transmuter Fuel Manufacturing
Project Management Techniques.
P11310: Parabolic Dish Autopoint Solution Project Family Team Leader: Trae Rogers (ME) Project Engineer: Pat Ryan (EE) Kyle Norlin (ME) Chris Reed (CE)
INDUSTRIAL & SYSTEMS ENGINEERING
R R R CSE870: Advanced Software Engineering (Cheng): Intro to Software Engineering1 Advanced Software Engineering Dr. Cheng Overview of Software Engineering.
ME104Q PAPER RIVER CHASM BRIDGE Team Boomerang Mechanical Engineering University of Rochester Executive Summary The premise of this experiment is built.
Simultaneous Localization and Map Building System for Prototype Mars Rover CECS 398 Capstone Design I October 24, 2001.
Vex 1.0 © 2005 Carnegie Mellon Robotics Academy Inc. Tapping A Hole Introduction In this lesson you will learn to: – Produce internal threads for a specific.
Team 10 ME Project: Air Conditioner Lab Members Customer Advisor Sean M. Gallagher, Brian Davison U of D ME Department Dr. Keefe Prathana Vannarath, Pam.
MANUFACTURING PROTOTYPE How do all the aspects of manufacturing come together to make a final product?
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
All logos in this presentation is courtesy of the Florida Institute of Technology Robotics and Spatial Systems Laboratory and the Florida Tech Office of.
9/9/2015IENG 475: Computer-Controlled Manufacturing Systems 1 IENG Lecture 07 Process Planning.
Ergonomics Is the study of how the human form moves at work and at play. Ergonomics must be taken into account when products are being designed, because.
Robots Ren Merritt. Definition of Robot A robot is a mechanical mechanism that moves and interacts with its environment and displays or mimics some form.
Introduction to the Major Design Project (MDP) University of Western Ontario Faculty of Engineering Science Introduction to Engineering Design, ES 1050.
Design Partition, Project Plan, Task Assignments and Conceptual Designs September 13, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher.
1. W506 – Ergonomic Essentials Workplace, Job & Product Design WORKPLACE, JOB & PRODUCT DESIGN BP.
All logos in this presentation is courtesy of the Florida Institute of Technology Robotics and Spatial Systems Laboratory and the Florida Tech University.
Model Making in Design Model making plays a vital role in the process of designing. At every stage of design, from conception to completion, the construction.
1 ENGINEERING DESIGN AND PRODUCTION. 2 What is design? To create something that has never been. To create something that has never been. To pull together.
WYMAN GORDON ROCHESTER INSTITUTE OF TECHNOLOGY Multi-Disciplinary Senior Design Team Nick Perrotte (ME)Lead Mechanical Engineer John Knight (ME)Project.
Design of a Malignant Hyperthermia Susceptibility Screening Device Sara Doll Lisa Kaczmarski Philip Magcalas Department of Anesthesiology Children’s Hospital.
IMPROVED CONTAINER LIFTING FRAME (ICLF). IMPROVED CONTAINER LIFTING FRAME - MARK II (ICLF-Mk II) Quantum Engineering Design, Inc (QED) 01/28/04 OBJECTIVES.
Adaptation of Van with a Wheelchair Lifting System Group Eight Members: Bill Fotoples- Team Leader Chad Wainscott- Technical Liaison/Web Page Specialist.
Design of a Rotational Stability Measurement Device For Analysis of ACL Reconstruction University of Pittsburgh Senior Design – BioE 1160/1161 Stephanie.
ASV Senior Design Project Final Report Fall 2012 Team: Leader: Daniel Becker Treasurer: Andrew Hinojosa Manufacturing: Samantha Palmer Design/Assembly:
Group 3 – Soil Moving Kit Group 3 – We Get Hits Taylor Puckett Jason Morton William Price Brandon Elam Instructor: Dr. Ni Wang Date: 5/1/2015.
North Carolina ABC Distribution Center Graham B. Thompson Project Manager LB&B Associates Inc.
Group 10 Anthony Muller Gerald Tyberghein Joshua Wood.
Chapter 13 Project Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Define and give.
Introduction – Concept of Stress
P15741: Air Table Mover Photo: Newport.com. Team Members Cameron Young – Team Leader Daniel Miller – Lead Mechanical Engineer Nicholas LeBerth – Edge.
Modelling Design for Manufacture.  Plays a vital role in the process of designing. From conception to completion  Three dimensional models: Provides.
September 2008 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Senior Design Ideas Team INASAD Members: Jose Medina Joseph Leone
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
Operational Production Information Systems. Purchasing Systems To produce goods and services, one must have the right quantity of raw materials and production.
Dog Grooming tool Team 17 Justin Proctor, Roy Mason, Jordan Chupp, Dennis Pugh Sponsor: Engineering To Go.
P16453 Subsystem Design Loading, Measurement, Control, and Test of a Journal Bearing Test Platform Kris Kidder | John Dolan | Shay Stanistreet | Anthony.
All logos in this presentation is courtesy of the Florida Institute of Technology Robotics and Spatial Systems Laboratory and the Florida Tech Office of.
Cantilever Children Swing The space saving device Roberto Aviles Ileana Perez Radaí Mendoza.
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
Design of Goods and Services Chapter 5. Designing Goods Form design: Appearance and other sensory aspects of a product Contributes to customer expectations.
CAD CAM. 2 and 3 Dimensional CAD: Using 2-dimensional CAD software, designers can create accurate, scaled drawings of parts and assemblies for designs.
Modelling and Prototyping Aims: To be able to DESCRIBE the process of SKETCH MODELLING and BLOCK MODELLING. To be able to EXPLAIN the reasons for using.
GCSE Engineering Support Event Monday 23 rd March Stormont Hotel Belfast Tuesday 24 th March Silverbirch Hotel Omagh.
Lesson Plan: Drafting and Design J6-2. What is 3D solid modeling? How do 3D solid modeling programs work?
E8: Digital Humans Option E AHL: Human Factors Design IB Technology.
Advanced Software Engineering Dr. Cheng
Nick Meisel Sven Bilén Creation of Multi-Functional Structures via Embedding in Additive Manufacturing Nick Meisel
HLH Technology Offers Plastic Molding In China
Advisor: Dr. Shangchao Lin
The Importance of Solar Car Project Management
Laser Measurement System
Rapid Tooling.
Creating the Final VEX Robot
Product design Modelling.
CAD/CAM services ensure complete tooling process coverage for mold tooling design in catia. You can use our CAD/CAM Services for mold tooling design.
Gunnery Control Handle
SQUIGGLE NANOMANIPULATOR
CAD CAM.
STRUCTURAL FABRICATION SHOP DRAWINGS SERVICES SILICON ENGINEERING CONSULTAT LTD.
IENG 475: Computer-Controlled Manufacturing Systems Process Planning
The Importance of Solar Car Project Management
Product design Modelling.
Team Bull Trout Project: Elevator Navigating Robot
Presentation transcript:

All logos in this presentation is courtesy of the Florida Institute of Technology Robotics and Spatial Systems Laboratory and the Florida Tech Office of Creative Services.

 Project Background  Design Objectives  Design & Analysis  Detailed Drawings  Fabrication and Testing Plan  Budget  Team Organization  Scheduling  Conclusion

 The PantherBot, also known as the PowerBot made by MobileRobotics, Inc., is a multifunctional robot  autonomously mapping terrain  equipped with sonar and laser range finder  robotic arm fitted with a parallel gripper and webcam  has a b WiFi antenna for wireless communications (Image Source: RASSL)

 This team will create an autonomous tool changer such that the PantherBot will be able to perform the following functions inside the Olin Engineering Complex:  Open doors via twisting door handles  Open front door via pressing the handicap accessible button  Press appropriate buttons to recall and operate an elevator (Image Source: Robotics and Spatial Systems Laboratory (RASSL))

 Safety of people, building and robot  Functional tools for tasks  Autonomous tool changes  Positive control of tools  Secure storage  Store tools away from sensors and access areas

Combination of CAD and physical prototypes  CAD  3D models allow testing of mechanisms  Test designs for fit and easily produce drawings  Prototyping  Evaluate concepts with real world interactions  Low cost testing

 CAE  Direct import of CAD models for structural testing  Find areas of weakness and excessive strength  Determine forces exerted on components in normal operation

Material Selection  Cost, Strength, Machineablilty, Surface Finish  Priority goes to Cost and Surface Finish due to the fact that our machined components are simple and exposed to relatively small forces.  A major project goal is ensuring that all components meet the visual standard of the existing robot

 We will fabricate parts through Building 538 (Machine Shop)  We will obtain reasonable off-the-counter parts if it is more cost effective to purchase the part than to produce in-house, such as bearings.

 We have set aside a budget for a testing rig, which will provide a viable test platform  Opening doors  Pushing door panel button  Pushing elevator buttons  The testing platform will provide feedback to the team regarding the repeatability of the tools, ease of operation, and storage functions.  Also, it will help determine if there are any problems with the tools before the PantherBot performs the predefined functions inside Olin Engineering Complex.

Jameson L. Tai (Team Leader) Research Justin Nunn Design William Rae Analysis William Rae Fabrication Jameson L. Tai Testing Jameson L. Tai Finances Justin Nunn

Fall 2008  Complete research in door opening techniques  Pushing door (September 2008)  Pulling door (September 2008)  Present tool design (October 2008)  Present tool changer rack design (October 2008)  Preliminary Design Review  Presentation (22 October 2008)  Report (22 October 2008)  Analysis on tools and tool changer (November 2008)  Final Presentation (03 December 2008)  Final Report (03 December 2008)

Spring 2009  Fabrication (February 2009)  Testing (March 2009)  Showcase (April 2009)

 Minimum of three sources used for pricing  Lowest price used for comparisons  Multiple types of materials researched for each part  Typically common materials were researched as these are easiest to find  Weight factors vary for every part based on what is needed

Solid metal block Overall Rating Design RequirementsSelection Factors (1*A+5*B+4*C +3*D+2*E) /18 Yield strength (kpsi) Surface Finish Cost/unit volume (in^3) Machinabili ty (%)Availability AbsRelAbsRelAbsRelAbsRelAbsRel Al H Al Al Stainless Steel (304) Steel (1018) Carbon Fiber

 Prototyping will be done with low cost easily machined materials  Materials such as plywood and cardboard are examples of such materials  Test Stand will be built out of low cost materials that accurately portray school facilities  To save money we are trying to work with facilities to get parts such as a door handle

 Final design will be constructed from materials such as Aluminum and Stainless Steel  To save money we will be attempting to get donations for the material we require, as well as use left over material from previous years  Coatings will be required to prevent damage to both the robot and to the school facilities  Coatings will most likely be made out of Ruber or plastic

 Our current budget was developed without consideration of possible donations  Design changes might drastically change what is required  A small buffer was made in the budget to compensate for this

 Test Stand Hardware$ 150  Shop Materials/Metals$ 400  Bushings/Bearings/Shafting$ 100  Surface finishing$ 50  Prototyping$ 100  Miscellaneous Hardware$ 50  Total Budget$ 850

 We have a preliminary design of our button pusher.  We have conducted research on door opening mechanisms that would integrate with existing hardware.  We are working on several designs of our tool storage system. These designs will be revised as the tools are finalized.