WILDLIFE POPULATION THRESHOLDS Conservancy size = 773,100 ha. To better visualise population numbers, imagine a 5000ha farm & calculate densities of the.

Slides:



Advertisements
Similar presentations
INDEPENDENT WATER SCHEMES IN SAMOA
Advertisements

South East Europe Investment Committee Work Programme and Communication Plan for th Meeting of the South East European Investment Committee Sarajevo,
Specific Goal 1: Evaluate and extend pilot MIST training and application into key habitats. Action 1: MIST tool was applied to gather data in number of.
WILDLIFE CONSERVATION By Augustine Tuuga SABAH WILDLIFE DEPARTMENT.
5/11/2015. Thimpu Agenda 1: Actively strengthen frontline staff… SNActivityTimeline (year) Budget (US$) SecuredGap 1.Recruit adequate frontline staff.
Overall Office Assessment GAR RateRate Current Issues: (results of analysis) Low violent crime rates demonstrate that people living and working on Picatinny.
Line Efficiency     Percentage Month Today’s Date
WILD FAUNA MANAGEMENT & PRODUCTION SYSTEMS Their Description, Conservation Implications & Treatment by CITES Hank Jenkins Creative Conservation Solutions.
VISION A conducive environment has been created for properly managed wildlife to increase and to encourage tourism and other wildlife utilisation activities.
WILDLIFE MONITORING Greg Stuart-Hill World Wildlife Fund This focuses on wildlife (fauna) monitoring. Other natural resource monitoring systems (e.g. veld,
Training of National Judges INFO DAY Introduction to the new Call for Proposals 2014 Raffaella Battella - DG Competition.
WILDLIFE POPULATION THRESHOLDS Conservancy size = 336,428 ha. To better visualise population numbers, imagine a 5000ha farm and calculate densities of.
Poaching Poaching is one of the main threats to survival of Amur tiger and other rare and endangered species of Primorye. It is caused by huge demand and.
 “ Wildlife conservation is the practice of protecting endangered plant and animal species and their habitats. Among the goals of wildlife conservation.
 Introduction  Plan and achievements for 2013/14  Challenges  Future strategies to overcome challenges 1.
WILDLIFE MANAGEMENT IN NEW BRUNSWICK. WHY MANAGE WILDLIFE? Provincial MANDATE to manage populations of all wild species, their habitats and use, for the.
Safety Groups Program 2009 Start of Year. Agenda Safety Group Objectives Safety Group Program Requirements 3 rd edition Employer Guidelines / Element.
COMMUNITY BASED TOURISM IN Namibia 1.Background & Context 2.Different CBT / APPROACHES –Achievements –Best Practices By Maxi Louis.
  A roadside deer survey in the Town of Hamilton, sampling 9.27 square miles (22.4 %) of the town during dusk hours in Sept &  We found.
Hoodia propagation trials at the National Botanic Garden of Namibia By Silke Rügheimer National Botanical Research Institute Private Bag Windhoek,
OBJECTIVESHOW TO ACHIEVE THESE 1To separate potentially conflicting forms of land use  Conservancy zoned for different land uses  Members approve the.
Building Strong Library Associations | Regional Convenings DAY 2 Session 3 How Goals can be achieved through Objectives: Slides.
NACSO and the National CBNRM Programme Background Prior to 1996, rural communities on communal land in Namibia had no rights over wildlife: All wildlife.
Community Based Tourism in Namibia
Building Strong Library Associations | Regional Convenings DAY 2 Session 3 How Goals can be achieved through Objectives.
Zimbabwe: Sustainable Tourism. Location Background In order to have an understanding of the successes of Operation Campfire it is important to know some.
Community-based Natural Resource Management (CBNRM) in Namibia – the Conservancy programme.
4.2.4 MANAGEMENT STRATEGIES. WHAT YOU NEED TO BE DO: Description of the management strategy, including where you have seen it Analysis of how it assists.
Biodiversity Health Index Main Streams for Life John MacKinnon UNDP consultant June 2012.
Namibia’s CBNRM Programme Namibia 823,988 km² Introduction Total population of 1,826,854 people on km households on km 2 of.
OBJECTIVES OF COUNTING ObjectiveReasons why information is needed 1. Estimate the Numbers of game How many? estimating stocking rates and biomass to manage.
1 © GROUND PATROLS AND REPORTS. 2 MIKE - EASTERN AFRICA GROUND PATROL REPORT Name of site: Patrol identification number: Reporting officer: Name and rank.
ANNUAL WORK PLAN 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Zonation Maintain boundaries Enforce zones.
Portfolio and Select Committees Second Quarter Report Presentation November 2015.
Project Title Project Title : ECOTOURISM DESTINATION PLANNING AND MANAGEMENT FOR THE ADA ESTUARY PROJECT OBJECTIVES To strengthen existing environmental.
VFCFC – Nov 14, 2013 Board meeting. Agenda  2012 Annual Report: Planning/ Cutting Permit Development/Mtn Pine Beetle Strategy Harvesting Road building/Road.
Species At Risk Task Force Shelby Elder. Background Information -Biodiversity: The range of organisms present in a particular ecological community or.
Ecological Management and Monitoring Systems in Namibia A Namibian partnership between The Namibian Ministry of Environment and the community. Fidi Alpers.
Strategies to manage human activity in deserts 4.
Erongo & Southern Kunene regions update 9 th February 2005.
ANNUAL WORK PLAN RECOMMENDED HARVEST OFF-TAKE RATES
Anabeb WILDLIFE MANAGEMENT & UTILISATION PLAN VISION
WILDLIFE MONITORING Greg Stuart-Hill
Community Based Tourism in Namibia
Dr. H. Sosovele WWF/Tanzania Programme Office
ITI Portfolio Plan Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Current Date Visibility of ITI Projects ITI Projects.
Annual Natural Resource Report
Average Monthly Temperature and Rainfall
Zimbabwe: Sustainable Tourism
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
Annual Natural Resource Report
Annual Natural Resource Report
Prof. dr. Giedrius Vanagas
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Second Quarter Report Presentation
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Community-based natural resource management (CBNRM)
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
ANCHORAGE POLICE DEPARTMENT DATA COLLECTION
Annual Natural Resource Report
ENTANGLEMENTS REPORTED
Annual Natural Resource Report
Annual Natural Resource Report
Presentation transcript:

WILDLIFE POPULATION THRESHOLDS Conservancy size = 773,100 ha. To better visualise population numbers, imagine a 5000ha farm & calculate densities of the population for this farm by dividing the estimate by 155. This gives a standard index - Numbers per 5000ha farm – which is easily to understand in practical terms. Compare the density of what you have with the densities in the last column of the table above. If greater, then that species has reached its threshold & can be harvested at higher off-take rates. RECOMMENDED HARVEST OFF-TAKE RATES Off-take rates & types of off-take change as desired population densities are reached # Only males will be hunted until desired population sizes are reached ## Females may be harvested once desired population sizes have been reached Before Desired Population Size Reached After Desired Population Size Reached Species Trophy (%) Other use (%)# Trophy (%) Other use (%)## Baboon 2%- Gemsbok 2%3%2%15% Jackal 10 /yr- - Klipspringer 2%- - Kudu 2%3%2%10% Leopard 1 /yr- - Ostrich 3%5%3%10% Springbok 2%5%3%20% Steenbok 2%3%2%10% Zebra 2%-3%8% SPECIES Average population (2005 – 2009) Desired population Density Index (no./ 5000ha farm) Baboon Cheetah 080½ Duiker Gemsbok Hyaena b 0?5 Jackal Klipspringer Kudu Leopard Springbok Steenbok Zebra ? Ostrich VISION ╪ Gaingu is a self sustaining conservancy that leads other conservancies in terms of finances, assets, awareness and employment based on the sustainable use of wildlife while ensuring the conservation of all natural resources and wildlife for the benefit of present and future members. ANNUAL WORK PLAN 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Law enforcement Conduct foot patrols - campsites Conduct vehicle patrols - tourist roads Conduct vehicle & foot antipoaching patrols Conduct foot patrols of curio stalls Conduct vehicle patrols of mining/prospecting activities Enforce rehabilitation Gather intelligence & conduct ad hoc road blocks Wildlife management - General Hold planning meeting - patrol routes & dates set up Hold planning meeting - reintroduction/translocation Train CGGs Veld monitoring Wildlife utilisation Conduct planning meeting - quota setting Meet MET for quota approval Advertise tender for trophy hunting & contract hunter Advertise tender for shoot & sell hunting Plan, train & conduct own-use hunting & distribute meat Allocate duties for ostrich farm hands Allocate duties for Hoodia (etc) farm hands Slaughter ostriches & process products Collect ostrich eggs Harvest farmed veld products Market farmed veld products Monitoring - Game counts Hold planning meeting - routes & dates set up Arrange logistics, identify participants, conduct training Conduct game count Update wildlife population trend charts Monitoring - Event book system (EBS) Monitor activities rigorously using EBS Update wildlife population trend charts Conduct EBS audit Order new EBS materials Communications Conduct monthly community meetings & display info Present Event Book annual report to AGM Give talks on wildlife value at schools & radio (NBC) Write proposals for funding for exchange visits Make exchange visits GAINGU ╪ GAINGU OBJECTIVES:HOW TO ACHIEVE THEM: 1 To maximise benefits and minimize conflicts from a variety of land uses  Division of the conservancy into 7 zones selected by reconciling current land uses with habitats & community aspirations 2 To conserve wildlife and natural resources  Wildlife populations encouraged to increase  Wildlife populations increased by translocation  Veld condition manipulated by varying off-take  Planting exotic and invasive plants removed 3 To produce real benefits for all conservancy members by sustainably utilizing wildlife and natural resources  Trophy, “shoot & sell”, “own-use” hunting & live- capture for sale permitted within annual quotas  Selected members trained to hunt for meat for all & to accompany commercial hunts  Where necessary, hunting disallowed in selected areas or at certain times of the year  Populations of small antelopes, birds & reptiles protected to provide a unique tourism attraction  Suitable members & game guards trained to identify wild species for tourism  Over-abundance & habitat damage prevented by culling or increased hunting off-takes  During droughts, hunting quotas increased to reduce competition & the likelihood of die off.  Species specific utilisation strategies determined & implemented  Wildlife & veld product farming (ostrich, Hoodia, Devil’s Claw etc) combined with intensive livestock breeding programmes in relevant zone  Ostrich eggs harvested sustainably for jewelry & tourist curios; feathers, skins and meat processed & sold 4 To minimise human-wildlife conflict (baboons, predators, corn crickets)  Self-insurance schemes  Improvement of livestock management practices  Training members in livestock protection & prevention of predation  Benefits from shooting problem animals returned to the conservancy (eg jackal skins etc).  Where appropriate/feasible, problem animals sold to hunters or captured live for sale.  The value of wildlife & reasons for conservation publicised. 5 To minimise illegal activities (poaching, Hoodia theft)  Law enforcement policies developed.  Game guards trained to undertake patrols & road blocks  The feasibility of game guards becoming Peace Officers investigated.  Benefits reduced/removed from members caught illegal activities more than once.  Off-road driving not permitted. Exceptions only with permission & repairs.  Approved tracks mapped & sign-posted.  Contact details for police & MET disseminated to improve communications & obtain support for law enforcement. 6 To improve communications  Conservancy divided into management “nodes” each with a communications officer provided with a cell phone.  Conservancy management issues discussed at sundry occasions (pension day, farmers’ association meetings, water point committee meetings, auction days etc)  Community members informed regularly of detailed financial status of conservancy  Funding sought by Conservancy Committee to establish a radio network  Useful phone numbers (MET, Police, Game Guards, Conservancy Committee etc) disseminated  Announcements made on radio (NBC)  Village meetings with support of Regional Office of MET to inform members of activities & outcomes  Talks will be held at schools, churches and school children will carry messages  Exchange visits to other conservancies 7 To obtain appropriate information for management  A combination of monitoring techniques used: Event Book System (EBS) annual or biannual fixed road counts MET aerial surveys  Subjects for monitoring include rainfall, veld condition, wildlife population trends & condition, problem animal incidents, illegal activities & wildlife off-takes, monitored in the EBS Supported by WWF Norway, Norad, ICEMA