1 PREPARING CEMENTS. 2 INSTRUCTIONS FOR PREPARING POWDER PREPARING CEMENTS shake powder before use  shake powder before use  don‘t compress powder in.

Slides:



Advertisements
Similar presentations
Use lenses to direct light in order to enlarge images
Advertisements

Looks like a small glass pitcher Metal or plastic.
PREPARATION OF INFANT FEEDS Chapter 27 Doris Corkin and Andrea McDougall.
Elastomeric Impression Materials
KAVITAN® LC.
Cooking Terms Step By Step
Salk Institute Mobile Lab Gel Electrophoresis Teacher Instructions Edvotek Set Up 12 groups.
SHOTCRETING K.V.SUBBA RAO.
DENT 1200 Materials I CEMENTS.
DA 122 Dental Materials.  Permanent cementation of {luting} ◦ Crowns, inlays, bridges, ◦ ortho appliances  Base {base}  Liner.
Dental Materials Equipment
1 Making and staining a wet mount Refer to the Practical Manual Introduction Sections F.1 and F.2.
DA 122 Dental Materials.  Permanent cementation (luting) ◦ Crowns, bridges ◦ Inlays, onlays ◦ Orthodontic bands and brackets  Insulating Base.
Tutorial How to properly measure 1 teaspoon all-purpose flour.
Dental Cements Chapter 45
Lab Equipment Pre-AP Chemistry.
Bellow valve (trap&pump) Inside glove box. (Note: Ar glove box is not necessary, if you work with single crystalline organic materials like rubrene that.
25.1 DISPOSING OF TOXIC HEAVY METALS PRE-LAB: PART A- “FIXING” THE COPPER IONS IN A SOLID MIXTURE.
Cakes, Fillings and Frostings
Cakes. 2 classes of cakes Shortened Cakes: Also called “butter cakes” Contain fat Solid fat: butter, margarine or vegetable shortening. Liquid fat: oil.
给 药 ( 三 ) 中国医科大学护理学院 王健. Medications (three) PARENTERAL MEDICATIONS Nurses given parenteral medications intradermally (ID), subcutaneously (SC or SQ),
How to Measure Everything …that we use in the kitchen.
How To Prepare, Sterilize, AND Test Culture Media
1 PREPARING C – SILICONES. 2 Easy processing Easy processing Easy dosage, short mixing time, easy check of Easy dosage, short mixing time, easy check.
DNA Extraction Genes in a Bottle Kit Onion DNA Extraction Genetically Modified Organisms (GMO)
DNA Structure and Analysis Activity 4.2: Casting Agarose Gels.
1 PREPARING ALGINATES. 2  we recommend shaking the sachet, resp. the jar well before using the material – homogenizing the material  don’t compress.
8 reaction lab.
Salk Institute Mobile Lab Gel Electrophoresis Teacher Instructions BioRad Set Up 8 groups Grossmont Kit.
Genes in a Bottle. Protocol Highlights What can you teach with the DNA Extraction Kit ? Reinforce the structures of a cell Introduce procedures involved.
Introduction: Standard Test Method for Density (unit weight), Yield, and Air Content (Gravimetric) of Concrete –Apparatus –Sample –Procedure ACI Certification.
DA122 DENTAL MATERIALS Resin Cements. Common Uses for Resin Cements: Permanent cementation of:  Metal crowns  Bonding porcelain crowns + bridges (Maryland.
DENTAL CEMENTS DR.LINDA MAHER.
Investigating Catalase Topic 3 IB Internal Assessment.
Mrs. Sheridan’s Tie-Dying Instructions. Table of Contents Tie-Dying Kits Buying Tie Dying Materials Selecting Colors of Dyes Mixing Colors Primary Color.
Rates of Chemical Reactions Vanderbilt Student Volunteers for Science Spring 2012.
Lab Equipment Chemistry San Juan High School Mrs. Timm.
Lab Equipment and Safety Procedures Yes, you should take notes!
Subcutaneous Intramuscular Injections
Desiccation ,sublimation & tirturation
Measuring Ingredients
NFS-Super Squeeze™ “The Hole-In-One” Process. Description NFS-Super Squeeze™ Process is a dewatering system that can be applied directly into the well.
Lab equipment and its uses
Layering Liquids. Today you are going to: layer 4 unknown liquids in a straw so that none of the liquids mixes with another.
Resin Cements DA122 Dental Materials.
1 Zinc Phosphate Cement DA 122 Dental Materials DA 122 Dental Materials.
Administration of Vaccine via Subcutaneous Route Hand hygiene is the first step in medication administration is hand hygiene. Use either an alcohol-based.
MEASURING. SMALL AMOUNTS USE MEASURING SPOONS 1 T, 1 t, ½ tsp, ¼ tsp OVERFILL SLIGHTLY – USE STRAIGHT EDGE SAME SPOONS FOR DRY OR LIQUID INGREDIENTS.
Respiration Lab Gas Exchange  Key Question: Will you exhale more CO2 if you hold your breath?  Initial Thoughts:
DNA Isolation Lab.
Cookies and Cakes.
Elastomeric Impression Materials
Chocolate Lollypops. $1.00 Colors & Flavors Ingredients & supplies needed. Mold Sticks Bags String Chocolate : -fudge -vanilla -dark chocolate -peanut.
HOW TO USE THE MICROSCOPE
Casting Glass in an Electric Kiln Using recycled glass to cast in plaster molds.
1. Swab throat. 5. Read Results Positive = 2 lines. Strep A Rapid Test Strip Procedure For details, consult Lab Manual located at: P:\Clinical\Lab Manual.
Procedure for making a wet mount
枣庄学院化学化工与材料科学学院 Preparation of Solution. 枣庄学院化学化工与材料科学学院 1. Grasp the basic Method and Operation of Preparing Solution 2. Study the Method of Use about.
Cooler Packing Instructions
Cooler Packing Instructions
5 Aseptic Technique.
Elementary Grade Spring 2013
Gooooood Morning!!! 1.) According to the dress code, what should you wear in the laboratory? 2.) In what cases might you be asked to leave the laboratory?
PREPARING CEMENTS.
Lab Equipment and Safety
a b c d e INSTRUCTIONS TO PERFORM EXPERIMENTS
Starter Get right to work on your contour line work.
Chapter Cakes.
PREPARING C – SILICONES.
Microwave Cooking.
Presentation transcript:

1 PREPARING CEMENTS

2 INSTRUCTIONS FOR PREPARING POWDER PREPARING CEMENTS shake powder before use  shake powder before use  don‘t compress powder in the measuring scoop

3 PREPARING CEMENTS PREPARING CEMENTS Overfill the measuring scoop with powder and then remove surplus powder using the edge of the cut-off insert in the bottle neck.  Overfill the measuring scoop with powder and then remove surplus powder using the edge of the cut-off insert in the bottle neck. INSTRUCTIONS FOR PREPARING POWDER

4 PREPARING CEMENTS INSTRUCTIONS FOR PREPARING LIQUID  hold the bottle vertically when dosing liquid  to achieve optimum drop size, squeeze the bottle gently  any dried material must be removed from the dropper

5 MIXING RATIO PREPARING KAVITAN KAVITAN PRO 3,5g : 1g = 1 measuring scoop : 1 drop of liquid KAVITAN PLUS 2,7g : 1g = 1 measuring scoop : 1 drop of liquid KAVITAN CEM 1,4g : 1g = 1 measuring scoop : 2 drops of liquid

6  Place powder and liquid on a smooth disposable paper pad or a glass p late  add powder to liquid in 2 – 4 doses  mix powder and liquid using a plastic or stainless spatula at the shortest possible time (max. 30 – 45 s.)  Properly prepared cement is homogenous, flexible and non-adhesive material PREPARING KAVITAN

7 KAVITAN PLUS PREPARATION  MIXING TIME30 – 45 s  WORKING TIME2 – 3 min  MANIPULATING TIMEmin. 1:30 min  SETTING TIMEmin. 5 min KAVITAN PRO PREPARATION  MIXING TIME30 – 45 s  WORKING TIME 2 – 3 min  MANIPULATING TIMEmin. 1:30 min  SETTING TIME min. 4 min PREPARING KAVITAN

8  mixing ratio of KAVITAN LC: 1 measuring scoop of powder 2 drops of liquid  Add powder to liquid in 2 – 4 doses PREPARING KAVITAN LC

9  mixing time max. 30 – 45 sec  density of putty, bright finish PREPARING KAVITAN LC

s 3 min Mixing Working time Mixing Working time WORKING TIME WORKING TIME Polymerization Polymerization 20s 20s PREPARING KAVITAN LC

11 MIXING RATIO PREPARING ADHESOR Base Layers and Fillings a) Base Layers and Fillings 23 2,30g : 0,80g = 2 measuring scoops of powder : 3 drops of liquid MIXING TIME2 – 2:30 min WORKING TIME 4 – 4:30 min SETTING TIME6 – 7 min

12 MIXING RATIO PREPARING ADHESOR Fixed Bridge Bonding b) Fixed Bridge Bonding 25 1,40g : 0,80g = 2 measuring scoops of powder : 5 drops of liquid MIXING TIME1 – 1:30 min WORKING TIME 3 – 4 min SETTING TIME6 – 8 min

13 PREPARING ADHESOR  mix on a glass plate with stainless spatula at 23 ± 1 ºC (to prolong the working time, mixing at 20 ºC is recommended) 8 – 12 parts lumps  divide powder into 8 – 12 parts and gradually, slowly mix in to avoid lumps MIXING PROCEDURE

14 Mistakes in preparation  Incorrect dose of powder or liquid  Differing size of drop while measuring  Inadequate mixing of whole amount of powder into liquid  The dropper must be kept clean PREPARING CEMENT

15 PREPARING CEMENTS TIPS  Before turning the bottle to the vertical position, hold it at an angle of 45º to remove air bubbles

16 STORING CEMENTS  in a cold and dry place in a well sealed inner container  at temperature 5 ºC to 25 ºC  avoid temperature higher than 25 ºC !!! Seal the bottle and the jar carefully after withdrawing powder and liquid !!!!

17 Thank you for your attention!