Granite Wash Casing Profile Texas Panhandle (District 10) Western Oklahoma OKC Granite Wash Conference – March 6, 2008.

Slides:



Advertisements
Similar presentations
Well Design PE 413 Surface Equipments and Placement Techniques
Advertisements

RRC Statewide Rule 13 “What you need to know.”
Railroad Commission of Texas Victor G. Carrillo - Chairman Elizabeth A. Jones – Commissioner Michael L. Williams – Commissioner.
RRC Statewide Rule 13 “What you need to know.”
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Changes to Statewide Rule 13 June, 2013 Texas Alliance of Energy Producers John Tintera, P.G. Sebree & Tintera, LLC.
Well Design PE 413 Introduction and API Standards of Casing
PETE 411 Well Drilling Lesson 17 Casing Design.
FORM 1027 – BOTTOM HOLE PRESSURE TEST. This presentation will assist you in the completion of the Form The bottom hole pressure test. Date of Last.
MANAGED PRESSURE DRILLING PRESENTATION ______________________________________________________________________ A Continuous Circulating Concentric Casing.
PETE 203 DRILLING ENGINEERING
9-Point Drilling Plan 9-Point Drilling Plan. Presentation Goals To Describe a Drilling Plan That… Is in compliance with Order #1. Is in compliance with.
Trican’s Burst Port System (BPS) (Patent Pending) A Cost Effective Method for Horizontal Well Stimulation Lewis Facca / Scott Sherman October 14, 2010.
Chapter 3 Casing design.
1 TIW CORPORATION A PEARCE INDUSTRIES COMPANY P.O. Box Houston, Texas U. S. A.
“ Unusual Interventions ” Jenna Robertson ICOTA Canada Roundtable October 14, 2010.
Terra Slicing Technology Overview.
Lesson 14 Jet Bit Nozzle Size Selection
Should Horizontal Wellbores be Logged? An analytical approach to hydraulic fracturing entry positioning and completion equipment selection.
1 Hydraulic Fracturing Regulatory Processes in Louisiana James H. Welsh Commissioner of Conservation.
PETE 411 Well Drilling Lesson 5 Hole Problems.
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
Inflatable DST Equipment An Overview Presentation.
INFLATABLE DST EQUIPMENT
Hydraulic Fracturing 101. What is Hydraulic Fracturing? Hydraulic fracturing, or “fracking”, is the process of drilling and injecting fluid into the ground.
FORM 1003/1003C – PLUGGING RECORD
PETE 411 Well Drilling Lesson 23 Gas Cut Mud.
Lesson 34 Horizontal Drilling
Reservoir Performance Curves
RAILROAD COMMISSION OF TEXAS BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES 1.
Lesson 25 Well Control, cont’d
Outline Pore Pressure and Fracture Gradient Drilling Fluid Casing Design Cement Design Drilling Bit Economic Analysis.
Lesson 30 Cementing - cont’d
New Fluid Solutions, Inc. NFS-BlackSeal ®. Overview Generally, the types of formations that are prone to lost returns are cavernous and vugular, naturally.
Petroleum Engineering 406 Lesson 6 Well Control Unusual Operations.
RAILROAD COMMISSION OF TEXAS Horizontal Drilling Permit Applications Lorenzo Garza.
Lesson 18 Casing Design Example
DRILLING.
Well Design PE 413.
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
Lesson 26 * Well Control * * Variable Geometry *
RAILROAD COMMISSION OF TEXAS WELL COMPLIANCE FORMS AND PROCEDURES Austin Regulatory Conference September
Processing Possibilities for Shale Gas Plays Keith Bullin Bryan Research and Engineering October 7, 2008.
Casing Design.
SPACING Vertical Horizontal Eric R. King Week Three September 9, 2010.
Chapter 5 Drilling Techniques and Drilling Problems
IADC Application Category Category A – Managed Pressure Drilling (MPD) Drilling with returns to surface using equivalent mud weight that is maintained.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
Well Log Interpretations of Miscellaneous Oklahoma Reservoirs By Richard Andrews March 2009.
SPACING Vertical Horizontal Eric R. King Week Three September 8, 2011.
Section 6-T14N-R94W Sweetwater County, Wyoming 13000’ Almond Test April 24 th, 2010 James Benson Kristin Carter Patrick Gardner Brandon Heiner Aaron Bounds.
The Case History of an Underground Flow Offshore Texas Developed by John Rogers Smith, P.E., Ph.D. Louisiana State University Funded by Minerals Management.
Profile Liner Technology for isolation of complicated zones while drilling.
RICK COOPER DIRECTOR OF THE DIVISION OF GAS AND OIL VIRGINIA DEPARTMENT OF MINES, MINERALS AND ENERGY Gas and Oil Well Drilling Requirements for the Tidewater.
ESPY 1-22 Solution GROUP P: JEREMIAH LARSON, CLAYTON HAWORTH, MOHAMMED JAFFAL.
Woodford Horizontal Wells June 30, 2005
CASING.
Chapter 2: Casing Design Introduction and API Standards of Casings
Hydraulic Fracturing 101.
Cementing How it is Done
Chapter 2: Casing Design Casing Selection
Chapter V Primary Cementing.
Well Design - PE 413 Surface Equipments and Placement Techniques
Class I Injection Well Application Issues
Design Factors Collapse Corrected
Parts Wellhead All casing strings, except for liners, are suspended from a wellhead. On a land well or offshore platform the wellhead is just below.
Casing Design Workshop
Design Calculations Combination Strings
How Well is Your Well? UIC Class I Well Construction Standards
Coal Bed Methane Cementing Best Practices
Presentation transcript:

Granite Wash Casing Profile Texas Panhandle (District 10) Western Oklahoma OKC Granite Wash Conference – March 6, 2008

Surface Casing Regulations District 10 Office is located in Pampa, Texas Texas Railroad Commission - District 10 – Jan 1996 “Zone of Critical Cement” Bottom 20% of casing string with a minimum of 300 ft At multiple stage cementing tool – immediate 300 ft above tool Cement Blend Requirements Cement in the “Zone Of Critical Cement” must meet and/or exceed a compressive strength or 500 psi before drill out and 1,200 psi in 72 hrs Cement above the “Zone of Critical Cement” may contain extenders, however the cement must have a minimum compressive strength of 350 psi in 24 hrs after placement. Also the slurry weight cannot be less than 12.7 #/gal with an API free water of no more than 6 mls per 250 mls of cement according to API RP 10R test procedure

Surface Casing Regulations District 10 Office is located in Pampa, Texas Texas Railroad Commission - District 10 – Jan 1996 Centralizers Surface casing string shall be centralized at the casing shoe If a multi-stage cementer is used, above and below the tool Plus 100 ft below the base of the usable quality water, a centralizer shall be placed every fourth joint to the ground surface or to the bottom of the cellar “Operators must notify the District Office in the event that the cement does not circulate to the ground surface” “A temperature survey or cement bond log well be required in the event that the cement is not circulated to the ground surface”

Surface Casing Regulations Texas Railroad Commission - District 10 – Nov 2005 Maximum casing depth will not exceed 3500 ft Surface casing shall be set before drilling into known shallow oil and gas formations. “Zone of Critical Cement” Bottom 20% of casing string with a minimum of 300 ft From multiple stage cementing tool to the surface Cement Blend Requirements Cement in the “Zone Of Critical Cement” must meet and/or exceed a compressive strength or 500 psi before drill out and 1,200 psi in 72 hrs Cement above the “Zone of Critical Cement” may contain extenders, however the cement must have a minimum compressive strength of 350 psi in 24 hrs after placement. Also the slurry weight cannot be less than 12.7 #/gal with an API free water of no more than 6 mls per 250 mls of cement according to API RP 10R test procedure

Surface Casing Regulations Texas Railroad Commission - District 10 – Nov 2005 Excess Cement “Operators are encouraged to use 150% excess is calibration of surface hole is not determined” Surface casing below 2500 ft will require a multiple stage cementing tool at least 50 ft below potable water, cement must be circulated to the surface Centralizers Centralize the shoe Centralize above and below the multiple stage cementing collar Plus 100 ft below the base of the usable quality water, a centralizer shall be placed every fourth joint to within 140 ft of the ground surface “Operators must notify the District Office in the event that the cement does not circulate to the ground surface” “A temperature survey or cement bond log well be required in the event that the cement is not circulated to the ground surface”

Texas Panhandle Vertical Well Intermediate Casing 9 5/8” casing set above the Brown Dolomite Cemented to the surface, single stage Production String Casing run to total depth Cemented across the productive zones of interest 2 stage procedure to place cement across the Brown Dolomite interval Optional single stage cementing procedure using ultra light cement slurry to place cement from the total depth to above the Brown Dolomite interval Productive Interval

Texas Panhandle Horizontal Well Intermediate Casing 9 5/8” casing set in the Penn Shale, below the Brown Dolomite; Cemented to the surface, single or two stage Kick Off Point – Below the Cleveland and above the Oswego Production String - Without the 7” casing string Horizontal section cemented to place the top of the cement +/- 500 ft above the Kick Off Point Cement placed across the Brown Dolomite with a single stage ultra-light cement slurry or two stage cementing process Productive Interval

Texas Panhandle Horizontal Well Intermediate Casing 9 5/8” casing set in the Penn Shale, below the Brown Dolomite; Cemented to the surface, single or two stage Kick Off Point – Below the Cleveland and above the Oswego Optional 7” casing string set through the curve; cemented to +/- 500 ft above the Kick Off Point Production String With the 7” casing string Single stage cementing process to place the top of cement +/- 500 ft above the Kick Off Point Productive Interval

Surface Casing Regulations Oklahoma Corporation Commission (165:10-3-4c) Minimum Surface Pipe Depth “surface casing shall be run and cemented from bottom to top with a minimum setting depthe which is greater of: - Ninety (90) feet below the surface or - Fifty (50) feet below the base of treatable water” Maximum Surface Pipe Depth “Shall not be more than 250 feet below the base of treatable water” Minimum Cement Setup Time “The cement behind the surface casing shall set at least eight (8) hours before further drilling.”

Western Oklahoma Vertical Well Intermediate Casing Set to cover low reservoir pressure or lost circulation intervals. Cemented to cover the intervals of concern. Production String or Production Liner Casing run to total depth Cemented with a “light weight” cement slurry with the TOC inside the intermediate casing string. Production liners have a minimum 300 ft overlap and minimum 200 ft of cap cement above the liner hanger. Productive Interval

Links to State Commissions Railroad Commission of Texas –RRC: Railroad Commission RulesRRC: Railroad Commission Rules Oklahoma Corporation Commission –Oklahoma Corporation Commission- HomeOklahoma Corporation Commission- Home