Sentry Asia Sales Meeting 20071. 2 Introduction Provide Sampling solution for Blue Circle Southern Cement, Bulk and Bagging Plant. JW Industrial Instruments.

Slides:



Advertisements
Similar presentations
Bulk Solids Sampling Applications II
Advertisements

Health and Safety Executive Construction Occupational Health Management Essentials (COHME) Sue Parkyn, Head of Occupational Health Unit, HSE Construction.
Ministry of Health Anna Starzewska-Sikorska, Ph.D. Coordinator of environmental part of Programme Institute for Ecology of Industrial Areas, Katowice POLISH.
Blast Site Edge Protection
Application of New Ergonomic Tools To Lean, Ergonomics & Six Sigma – ©2012 B. Zavitz & S. Smith Ben Zavitz, CPE Ergonomist General Dynamics Bath Iron Works.
MNM Fatal Fall of Person Fall of Person October 10, 2014 (Pennsylvania) October 10, 2014 (Pennsylvania) Cement Operation Cement Operation Truck.
Warehouse Management in Microsoft Dynamics AX 2012 R3
Stericycle, Inc. Emergency Preparedness. Our Mission Protecting People…Reducing Risk” “ Protecting People…Reducing Risk” To combine integrated solutions.
Asbestos has been imported to Thailand for more than 30 years; 90% of asbestos are used in cement manufacturing products such as roof tile and cement.
1 ISE Ch. 22 Managing an Ergonomics Program History of Ergonomics Programs  1993: OSHA Ergonomics Program Management Guidelines for Meatpacking.
INDUSTRIAL & SYSTEMS ENGINEERING
My Career Research Martin Nicaj 2/11/ th hour 21 st century.
Actionable Process Steps and Focused Mitigation Strategies
TRAINING SOLUTIONS RISK ASSESSMENT For more information contact Victoria: (Tel) (Fax) ( )
3rd Global Shipping Summit – Dalian-China
RST processes Session 6 Presentation 3. A framework for RST processes Establishing an RST Membership Terms of reference Work programme (schedule, agenda,
BRC Food Safety Quality Management System Training Guide
1 Effective Safety & Health Assessments: Audits and Inspections Disclaimer: These safety materials, resources and PowerPoint ® presentations are not intended.
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions This unit will give you the opportunity.
1 Introduction to Security Chapter 5 Risk Management: The Foundation of Private Security.
Inflating your way to a safer working environment.
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
PROFESSIONALISM OF THE INSULATION INDUSTRY. Content Introduction NIA Code of Professional Practice Code of Professional Index Membership Criteria & Complaints.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
PAINT INDUSTRY PROCESS DESCRIPTION. 2 Paint Industry PROCESS DESCRIPTION SUMMARY – PART 1: PRODUCTION OF WATER PAINTS 1.Dry paint weighing Automatic.
Animal Feed Safety System P Timothy E. Costigan Manager of Quality and Analytical Services Prince Agri Products, Inc.
Fatal Risk Working Group - Working at Height Martin White - Head of Birse Rail.
By Troy Budd and Kane Sharp.  Lifting Operations and lifting equipment Regulations (LOLER) came into force on the 5 th of December  The Regulations.
Health and Safety Executive HSE Strategy for Worker & Public Safety in the UK Chemical Industry John Murray Head of Chemical Industries Strategy.
1. Contents Context for Strategy Development What We Did Progress and Next Steps 2.
INNOVATION PODIUM. 12: :00 NEXT SESSION BAG FACTORY UNCOVERED BEUMER GROUP MIDDLE EAST Dirk Fransen, Director of BEUMER Innovation and Automation.
Elaboration of a Semantically-operating risk management information system (SoRMIS) and its practical implementation at CERN 8th Gentner Day 10/28/2015.
Prevent the risk of road accidents among employees Reducing the frequency of road accidents.
Can you conduct DSE risk assessments for under £10 each? ADVISA can! ADVISA makes DSE risk assessments quick & affordable, at a fraction of the cost of.
132KV GSS PIPAR CITY JODHPUR
ENGINEERING DESIGN PROCESS. OBJECTIVES IDENTIFY THE STEPS OF THE ENGINEERING DESIGN PROCESS. DETERMINE CRITERIA FOR THE DEVELOPMENT OF A NEW TECHNOLOGY.
Introduction to Electrical Engineering. Be Prepared for Electrical Engineering Discussion Discuss what you (learner) know about electrical engineering.
Language Studies and Academics Report Writing Types of Reports CM 2300.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Chapter 8 Risk Management Plans 8 Risk Management Plans C H A P T E R.
MNM Fatal Fall of Person Fall of Person October 12, 2005 (Ohio) October 12, 2005 (Ohio) Industrial Sand Operation Industrial Sand Operation Bagger.
Traffic Management Rok Safety Seminar The statistics Why do accidents occur What is workplace transport The problems Possible solutions Worked examples.
Welcome To. Conweigh Systems A Single Stop Destination for all your material handling equipment needs....Providing a wide range of equipments for silo.
Being there When you need us Thats our policy. Construction (Design & Management) Regulations 2015.
Project Outline I A New CRM database must accomplish the following:  Deliver support resources for internal IT  Integrate all data from existing CRM.
1 RIGHT SOLUTIONS RIGHT PARTNER Industrial. 2 RIGHT SOLUTIONS RIGHT PARTNER Testing & Inspection Asset Care Industrial.
The Company Why solutions Inspired By Absolute Management System Standards For Your Solution Product service Training service Installation/Inspcetion.
Upon completion of this module, you will be able to: 1. Define a load.
Introduction to Mechanical Engineering
Camden County BRFSS Results
GOOD MANUFACTURING PRACTICE FOR BIOPROCESS ENGINEERING (ERT 425)
Occupational Radiation Protection during High Exposure Operations
Controlling Measuring Quality of Patient Care
Introduction SHAKTI INDUSTRIES is a vibrant and rapidly growing company that has many years of experience in the Mushroom Industry together with an experienced.
Vibration Measurement, Analysis, Control and Condition Based Maintenance 14 Predictive maintenance Dr. Michiel Heyns Pr.Eng. T: C: +27.
بسم الله الرحمن الرحيم قَالُوا سُبْحَانَكَ لا عِلْمَ لَنَا إلاَّ مَا عَلَّمْتَنَا إنَّكَ أَنتَ العَلِيمُ الحَكِيمُ صدق الله العظيم ( البقرة 32 )
Introduction to Materials Handling
Risk Management with Minimum Weight
RST processes Session 5 Presentation 2.
H A C C P HAZARD ANALYSIS CRITICAL CONTROL POINTS 1 December 2018
Hazard Assessment Tool & Training Indicator
Instrument PDR Summary of Objectives
4 YEARS IN Emergency Response > Prevention is better than cure
SAP GRC EOH GRC Solutions Divisional divider Option 1.
Safety Alert Screwed Fittings 04/95 Background
Group Structure Water Weights Special Projects Engineering Services
Traffic Management Rok Safety Seminar 2007.
Innovative Safety Initiative Award 2015
OHSAS Occupational, Health and Safety Management System
Presentation transcript:

Sentry Asia Sales Meeting 20071

2 Introduction Provide Sampling solution for Blue Circle Southern Cement, Bulk and Bagging Plant. JW Industrial Instruments.

Sentry Asia Sales Meeting Topics The project criteria Solution for representative sampling of finished cement. Justification for expenditure Integration with ancillary equipment.

Sentry Asia Sales Meeting Sampling criteria Project to take 10kg sample of finished cement from tuck load out locations. Cement samples used for custody transfer purposes. Eliminate non-representative operator sampling and improve safety.

Sentry Asia Sales Meeting Identify location for representative sampling Airslides are one of the most common forms of material transfer in cement plants providing excellent product presentation. Recommend Model RX 90 Airslide strip sampler. Cement industry experience using strip samplers as product segregation can occur.

Sentry Asia Sales Meeting Justification for expenditure Representation of sample must reflect actual product. Statistical Verification. Risk assessment and Control. Occupational Health and Safety requirements.

Sentry Asia Sales Meeting Risk assessment before samplers

Sentry Asia Sales Meeting Risk assessment after sampler

Sentry Asia Sales Meeting Physical Installation

Sentry Asia Sales Meeting Integration with Ancillary equipment Provide complete sampling system for use by Truck drivers. Addition of load cells and integrated controllers Addition of pipe vibrator to ensure product displacement.

Sentry Asia Sales Meeting Thank you for your time