Cost Estimator 200,000 SQUARE FOOT BUILDING 400' x 500' PERIMETER ONE STORY 28' HEIGHT ESTIMATES CREATED USING RSMEANS AND NATIOANAL COST ESTIMATOR (SET.

Slides:



Advertisements
Similar presentations
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
Advertisements

(2) Rules of Construction. How Thick or thin Size Analysis of Real Construction.
Objectives of Elemental Estimation 1.To reveal the distribution of costs among the constituent element of the project. 2.To relate the cost of any constituent.
Exterior Walls (Wood).
Breaking and Breaching. Tools Used Sledge hammers –Long and short handled Chisels Pinch point pry bar –“Crow bar” Hacksaw Handsaw Bolt cutter Flat head.
Prof Awad S. Hanna Concrete Structures Concrete Structures.
Structural System Overview
Building Construction A fire resistive rating (FRR) is given in minutes or hours and relates to how long it takes to burn through a given material. Expressions.
Masonry. Terms –F > 15-5 –Go thru all figures –Joints between brick = ¼ inch.
HEAT LOSS If the conservatory is not heated from the main heating system or it has an external quality door fitted i.e. double glazed patio or similar.
1 Mid Day Meal Scheme Madhya Pradesh Government of Madhya Pradesh Panchayat & Rural Development Deptt.
John Basbagill Integrating Life Cycle Assessment into Early Stage Building Design November 27, 2012.
Floor Systems and Foundation Support
Basic Building Construction
It’s more than adding and subtracting..  Before bidding, the site should be examined for the following:  Distance from the office  Site conditions.
John Basbagill Integration of Life Cycle Assessment and Conceptual Building Design June 16, 2012.
2001 Winter Presentation. Site Location Site View.
Exterior Wall (Masonry)
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Steel Bar Joists Tyler Wells. Academy Sports Building The building we chose is Academy Sports. It is located in Opelika Alabama. Academy is a sporting.
The ground must push up as hard as the building pushes down
King James Cost Estimation
Balloon Frame North-American invention, 1833
Chapter 35 Section Layout.
Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out Square Foot Estimating.
Building Construction Types and Size-Up Considerations.
Wall and Ceiling Construction
Foundation Plan Layout
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
TYPICAL member spot checks & alternate systems design study
H OTEL | N ORTHEAST U.S. J ORDAN R UTHERFORD | S TRUCTURAL O PTION F ACULTY A DVISOR | D R. T HOMAS B OOTHBY AE S ENIOR T HESIS | A PRIL 8, 2013.
PowerPoint ® Presentation Unit 52 Thermal Insulation and Other Insulating Methods Thermal Insulation Exterior Insulation and Finish Systems (EIFS) Roof.
Spanish Style Christine Petty Civil Engineering and Architecture September 7, 2010.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
Andrew Diehl The Pennsylvania State University Architectural Engineering Department Structural Option 5 th Year Senior Thesis Project “The Comparison of.
Orthographic Drawings
Starter Strip Starter Strip comes in lengths of 10’ Starter strip is installed around the exterior perimeter of the building The starter strip is nailed.
Competency: Design and Draw Foundation Plans
Spread Footing Design for Columns
A REPORT ON PRACTICAL TRAINING CONDUCTED AT PUBLIC WORK DEPARTMENT(PWD),KOTA FROM 15/6/2011 TO 14/7/2011 Submitted to: Mr. Rajneesh Sharma HOD {Civil Dep.}
Energy loss in the home Insulation method including cost and saving
Energy loss in the home Insulation method including cost and saving
Isometric & Orthographic Drawings
Maria’s Restaurant Appendix A Section 16 HVAC Building Loads
Major Steps In Building a SFR
Passive Solar Home Design Project
Table (3.1)- the averages of the 10 models costs
Multistory Office Building
Soil MECHANICS AND FOUNDATION ENGINEERING-II (CE 311) [6] Types of Foundations 1437-Summer SaMeH.
Table 1. Configurations of the building
Building Structural Systems
Building Construction
International Building Materials and components
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Section and Details Vocabulary and Basic Information
Concrete Structures DR. Nabil Dmaidi.
Progress Report 11/10/11.
Elevation Layout and Drawing Techniques
Place the USDA grade for the exterior egg shell quality of each egg.
Project Background Type of building: Mixed-use residential building
Brick A fired clay masonry product..
FBE05 – Mathematics and Statistics
Concrete A structural material made by combining cement, sand, aggregate, and water.
When we make our roofs, they will need an overhang to protect people from rain and they also look cool. The overhang hangs off 1 meter long on each side.
Competency: Design and Draw Foundation Plans
Property Module IV Replacement Cost Determination
Competency: Design and Draw Foundation Plans
© OnCourse Learning.
When we make our roofs, they will need an overhang to protect people from rain and they also look cool. The overhang hangs off 1 meter long on each side.
Presentation transcript:

Cost Estimator 200,000 SQUARE FOOT BUILDING 400' x 500' PERIMETER ONE STORY 28' HEIGHT ESTIMATES CREATED USING RSMEANS AND NATIOANAL COST ESTIMATOR (SET UP COSTS FOR CORRUCOMB) 6" PRECAST WALLS (aggregate finish), STEEL AND GIRDER ROOF 12" THICK BRICK AND BLOCK CAVITY WALL, STEEL AND GIRDER ROOF 12"x8"x16" CEMENT STUCCO ON CEMENT BLOCKS WALL, STEEL AND GIRDER ROOF 6" PRECAST WALL (aggregate finish), PRECAST DOUBLE "T" ROOF 9' THICK CORRUCOMB WALL (DRYVIT Stucco finish), 18" THICK CORRUCOMB ROOF

Cost Estimator STRIP FOOTINGS40,60063,000 35,280 SPREAD FOOTINGS145, ,500144,911 SLAB ON GRADE921, ,308 SUBTOTAL1,107,1001,129,500 1,413,000110,1499 6" PRECAST WALLS, STEEL AND GIRDER ROOF 12" THICK BRICK AND BLOCK CAVITY WALL, STEEL AND GIRDER ROOF 12"x8"x16" CEMENT STUCCO ON CEMENT BLOCKS WALL, STEEL AND GIRDER ROOF 6" PRECAST WALL, PRECAST DOUBLE "T" ROOF 9' THICK CORRUCOMB WALL, 18" THICK CORRUCOMB ROOF SUBSTRUCTURE 200,000 SQUARE FOOT BUILDING 400' x 500' PERIMETER ONE STORY 28' HEIGHT

Cost Estimator 6" PRECAST WALLS, STEEL AND GIRDER ROOF 12" THICK BRICK AND BLOCK CAVITY WALL, STEEL AND GIRDER ROOF 12"x8"x16" CEMENT STUCCO ON CEMENT BLOCKS WALL, STEEL AND GIRDER ROOF 6" PRECAST WALL, PRECAST DOUBLE "T" ROOF 9' THICK CORRUCOMB WALL, 18" THICK CORRUCOMB ROOF SHELL ROOF1,917,000 1,680,5002,334,200 ROOF COLUMNS66,000 8,500066,000 ROOF SET UPNA 92,160 EXTERIOR WALLS875,0001,495,000770,000875,000308,800 WALL SET UPNA 41,472 CLADDINGNA 302,400 DOOR - DOUBLE3,875 DOOR - SINGLE32,400 INSULATION514,000 NA INSULATION TAPERING488,000 SUBTOTAL3,896,2754,516,2753,791,2753,678,7753,669, ,000 SQUARE FOOT BUILDING 400' x 500' PERIMETER ONE STORY 28' HEIGHT

Cost Estimator 6" PRECAST WALLS, STEEL AND GIRDER ROOF 12" THICK BRICK AND BLOCK CAVITY WALL, STEEL AND GIRDER ROOF 12"x8"x16" CEMENT STUCCO ON CEMENT BLOCKS WALL, STEEL AND GIRDER ROOF 6" PRECAST WALL, PRECAST DOUBLE "T" ROOF 9' THICK CORRUCOMB WALL, 18" THICK CORRUCOMB ROOF INTERIORS DRYWALL305,50030, ,500 NA PAINTING37,300 SUBTOTAL342,800 37, ,000 SQUARE FOOT BUILDING 400' x 500' PERIMETER ONE STORY 28' HEIGHT SERVICES SPRINKLERS438,000 SUBTOTAL438,000

Cost Estimator 6" PRECAST WALLS, STEEL AND GIRDER ROOF 12" THICK BRICK AND BLOCK CAVITY WALL, STEEL AND GIRDER ROOF 12"x8"x16" CEMENT STUCCO ON CEMENT BLOCKS WALL, STEEL AND GIRDER ROOF 6" PRECAST WALL, PRECAST DOUBLE "T" ROOF 9' THICK CORRUCOMB WALL, 18" THICK CORRUCOMB ROOF SUBTOTALS 200,000 SQUARE FOOT BUILDING 400' x 500' PERIMETER ONE STORY 28' HEIGHT SUBSTRUCTURE1,107,1001,129,500 1,413,0001,101,499 SHELL3,896,2754,516,2753,791,2753,678,7753,429,035 INTERIORS342,800 37,300 SERVI CES438,000 GRAND TOTAL5,7841,756,426,5755,701,5755,872,5755,005,834