Eastern School Compound Term Paper August 2005 CEM 512 Done For Dr. Saddi Assaf Done By. Mohammed Bader.

Slides:



Advertisements
Similar presentations
Background Australia has always had bushfires
Advertisements

Edit the text with your own short phrases. The animation is already done for you; just copy and paste the slide into your existing presentation. architectural.
King Fahd University Of Petroleum & Minerals Value Engineering Study For Car Parking Shade Presented By Ali M. Moussa For CEM 512 :Value Engineering Dr.
Market Assessment for Small Businesses. Lecture Contents Marketing Mix/ Demand/ Demand Estimation Sampling Plan/ Data Collection and Analysis Market Survey.
TABLE OF CONTENT  Introduction.  Objectives.  Traditional and alternative plastering, external cladding, and formwork systems.  Case study description.
CEM-512 Value Engineering Highway Project: South Interchange.
Exterior cladding May 3 rd, Building Cladding 1.What is cladding 2.Types of cladding 3.Construction methods 4.Advantages and disadvantages.
 Low Cost Housing is a new concept which deals with effective budgeting and following of techniques which help in reducing the cost construction through.
VALUE ENGINEERING Prepared By Mohammed Abdul Hafeez Us Shan PLUMBING OF A VILLA In Relevance to CEM 512 This Project is Prepared for Honorable Dr. SAADI.
Class Day Thirteen. Chapter 9 Stone & Concrete Masonry.
King Fahd university of Petroleum and Minerals Construction Engineering and Management Department CEM 512 Unused Space in Mosque To: Prof. Sadi Assaf Prepared.
Will Krause Dir, Technology Services Houghton College The RFP Process Getting what you want!
Emerging Standards and their effect on Exterior Continuous Insulation in Commercial Wall Construction.
V.E. of Selecting Flooring Materials KING FAHAD UNIVERSITY OF PETROLEUM & MINERALS College of Environmental Design Construction Engineering & Management.
بسم الله الرحمن الرحيم. King Saud University College of Engineering Department of Industrial Engineering King Saud University College of Engineering Department.
Useful Math. dot product (or scalar product) of two vectors.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Annual General Meeting Home Owners Association 2014.
THE MITCHELL FRAMING SYSTEM A building system that encourages homeowners to have a direct involvement in driving building growth and expansio n Neal Mitchell.
Choosing the Right Siding When selecting siding, there are six basic issues to consider: 1. Water Resistance. Water-resistant types of siding will have.
How to read and critique a technical paper?. 3 phases to reading Determine if there is anything interesting at all in the paper. Determine which portion.
CEM512 / 043; King Fahd University of Petroleum and Minerals Department of Construction Engineering and Management Value Engineering CEM512 Term.
West Northern Lights Boulevard – Sound Barrier Improvements August 16, 2006 Meeting Purpose: A Forum to Share and Gather Information The Municipality of.
King Fahd University of Petroleum and Minerals CEM 512 Value Engineering Term Project Turbine Fuel Gas Heater Prepared by: Ahmed S. Al Zahrani ID#
Modeling Relationship Strength in Online Social Networks Rongjing Xiang: Purdue University Jennifer Neville: Purdue University Monica Rogati: LinkedIn.
KING FAHD UNIVERSITY OF PETROLEUM & MINERALS DHAHRAN, SAUDI ARABIA ARE-512 Life Cycle Costing – Cost Data Bank For By G. C. SOFAT S.K. TYAGI Presented.
READING A PAPER. Basic Parts of a Research Paper 1. Abstract 2. Introduction to Technology (background) 3. Tools & techniques/Methods used in current.
Fiber Reinforced Cement Board Decorative Panels For Exterior / Interior Cladding, Rainscreens, Countertops, and much more!
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
SPIN Benchmarking The product planning phase contains all steps that are necessary to develop a good design brief for further product development in phase.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Horticulture CD-Rom Illinois CORE Curriculum. Unit C Nursery, Landscaping, and Gardening.
INTRODUCTION The company started the production of metal products in 1992 and prefabricated modular buildings in Harmet’s product range includes.
Property Inspection & Analysis: The Improvements
16469 Low Energy Building Design Conflict and Interaction in Environmental Engineering Design.
Energy Analysis The energy model was defined as: EMBODIED ENERGY + OPERATIONAL ENERGY.
INDEX Sr noTopic 1.Introduction 2.Advantages 3.Product Types 4.Thermal Insulating Materials 5.Applicatiion.
Development of Information System using OOA for Abdulhadi Bohligah Establishment Prepared by: Group # 3 1.Mohammed Al Ashoor 2.Abdullah Bohligah.
FACTORS EFFECTING COST OF BUILDING ELEMENTS
ABOUT DREAMZ INFRA INDIA PVTLTD Dreamz Infra India Pvt Ltd is started at March 8 th 2011 which is certified by ISO 9001:2008 Dreamz Infra India Pvt.
DESIGN OF AIRPORT TERMINAL AND CONTROL TOWER
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Elastomeric Coatings Market Price, Industry Outlook & Forecast
Backgrounds and Plaster
Asset Planning & Optimization Capital Renewal Strategies
Estimating and Scheduling CEE 492
TRANSLUCENT CONCRETE By-- Shubham Jaiswal.
Light Transmitting Concrete
ECONOMICS OF BUILDING DESIGN
Building Structural Systems
Uses of stones Five main groups of uses of stones;
Architect Selection Process for University Place Elementary School
RESULTS AND DISCUSSION
RESULTS AND DISCUSSION
Hire the Best Residential Painting Contractors for Your Home.
Backgrounds and plaster
FINISHES (FLOOR, WALL & CEILING)
DRQ #5 – September 24, 2009 Aquarius Products, Inc, has just completed development of a new line of skin-care products. Preliminary market research indicates.
Water-Resistive Barriers: Assuring Consistent Assembly Water Penetration Resistance Educational Overview Revised August 31, 2018.
Making Measurements Meaningful
DEPARTMENT OF CIVIL ENGIEERING (RAJKIYA ENGINEERING COLLEGE, MAINPURI) Page No - 1.
Build operate and transfer project delivery System in Saudi Arabia
Thermal Impact of Different Interior Finishing Materials on Energy Consumption YOGESH JATAV
RESULTS AND DISCUSSION
Term Project: Challenges in supplying Energy to Central Region
Alamdar Innovations Crafted with Perfection
Structure II Course Code: ARCH 209 Dr. Aeid A. Abdulrazeg.
RiverView Condominiums II Chicago, IL
POWERPOINT PRESENTATION
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Global Active Calcium Silicate Market to hit $215 mn by 2024: Global Market.
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Calcium Silicate Market predicted to grow exponentially by 2025: Global.
Presentation transcript:

Eastern School Compound Term Paper August 2005 CEM 512 Done For Dr. Saddi Assaf Done By. Mohammed Bader

Introduction The importance of the exterior cladding in building projects has been growing in the last decades The verity of exterior cladding systems is increasing due to the intensive development in this field for both nonresidential and residential buildings.

Introduction (cont..) The following factors favor this trend: 1. The continuous expansion in high-rise building, where the designer needs light materials 2. New functional demands 3. Rising costs of building 4. Increased awareness of architectural and aesthetic values

I. Information Gathering Phase The project Four schools located in Dammam city Total area of the terrain is around 9000 M ² The area of each school is around 1225 M ² Each school has 3 typical floors, and the height for each floor is 3.5 M Each School has around 1890 M ² cladding area

School Plan

Objectives The exterior cladding must have: Acceptable initial cost Low maintenance cost Weather resistant Good look

Sources 1. Building Products Company (BPC), Eng :Amer Awad (Regional Manager) 2. GEMCO, Mr: Malek (Sales Manager) 3. My experience in the building materials

II. Speculation Phase In this phase, many and different proposals must be created as many as possible. These proposal are as follows Proposals

III.Evaluation Phase In this phase, a methodological process will be utilized to come up with the most suitable solution.

Methodological process 1. Comparison Comparison 2. Weighted Evaluation Weighted Evaluation 3. Analysis Matrix Analysis Matrix

Last Ranking 1. ASK Board 2. Finished Masonry Block Wall 3. Granite Cladding 4. Cement Board

Development Phase When we clad the building with ASK board, we will get the following result; Cost=1890*130= SR\building Cost of the 4 buildings = SR

Development Phase It ’ s the time now to develop a method which reduces the cost of the cladding.

Development Phase (cont..) A combination of two different types of cladding can be used in the project without affecting the basic function of the building, as shown in the picture.

Development Phase (cont..) Cost = (1470 M ² * 130 SR) + (420 M ² * 80SR) = = SR Total Cost = SR Total Saving Percent = ( )\ * 100 = 8.5 %

Development Phase (cont..) Maintenance and Painting Cost = (1470 M ² * 10) + (420 M ² * 5) = = SR \ yr \ M ² Total Maintenance Cost = SR \ yr \ M ² Total Saving Percent = ( ) / * 100 = 11.1 %

THANK YOU Any Questions,,,, ?