Ground Water Rule Review, Updates and Compliance Plans MSDH – Bureau of Public Water Supply Spring 2012.

Slides:



Advertisements
Similar presentations
IDEM Drinking Water Program Water Resources Study Committee.
Advertisements

Assessing Capacity Through Sanitary Surveys. SDWA §1420 Capacity Development ~To receive their full Drinking Water State Revolving Fund allotment, States.
Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
Potential Pathways for Coliform Contamination. Fixing Positive Coliform Results.
Mercer Island E. coli Event Bob James, ODW December 2014.
The Ground Water Rule and You Advanced Small Water System Course PUBLIC HEALTH DIVISION Center for Health Protection, Drinking Water Services.
Gary Carlson Drinking Water Program EPA Region 8
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
Nathan Saunders, P.E. Maine Drinking Water Program Public Water System Owner & Operator Responsibility.
Security and Emergency Preparedness for Small Water and Wastewater Systems Rural Community Assistance Partnership (RCAP)
1 Utility Board Training: Technical Capacity. 2 Introduction Request for training identified Local utility boards Funders Regulators Cooperative training.
10 NYCRR5 Eric W. Wohlers, P.E. Environmental Health Director Christopher G. Crawford, Ph.D. Water Resources Specialist Cattaraugus County Environmental.
Total Coliform Rule ( TCR ) Monitoring in South Dakota 2007 Rob Kittay SDWWA Conference-Sept 11, 2008.
Connecticut Department of Energy and Environmental Protection.
Lancaster County Property Transfer Code John Chess REHS, MPA, Water Quality Supervisor Lincoln Lancaster County Health Department Doug Smith REHS, Environmental.
PSC INSPECTION REPORT George W. Wakim, P.E.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
Operational Evaluation Level Stage 2 D/DBP Rule Compliance Michael W. Deal Compliance Assurance Section Central Office Division of Drinking And Ground.
Coliform Occurrence After Action Assessment Sammamish Plateau Water and Sewer District Workshop December 9th, 2014 Sammamish Plateau Water and Sewer District.
Massachusetts Department of Environmental Protection Drinking Water Program.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
After the Sanitary Survey
Mississippi State Department of Health
To Protect and Enhance Kentucky’s Environment Revised Total Coliform Rule RTCR Kentucky Implementation January 1 st, 2016.
Massachusetts Department of Environmental Protection Drinking Water Program Anita Wolovick MassDEP, Environmental Analyst 2011 Spring Training Information.
Industry Audit Programme Update  The concept is an external audit of manufacturing practice  AsureQuality is the external auditor Has national coverage.
Ground Water Rule Workshop Department of Environmental Conservation September 22-23, 2009 Dan Weber & Gloria Collins Regulations Team DEC Drinking Water.
My septic system is working just fine! New State Wide Rules Began 1 st of 2015 replacing the 1977 code Goals Update system designs to currently available.
Department of the Environment Ground Water Rule Laboratory Presentation.
To Protect and Enhance Kentucky’s Environment Revised Total Coliform Rule RTCR Effective April 1, 2013.
$200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 MCLsMonitoring RulesReporting.
State of Alaska Implementation of MBDP Rules Carrie Bohan Environmental Program Specialist ADEC DW Program.
MRWS GROUND WATER RULE (GWR) PREPARED BY JOHN CAMDEN MRWS GROUND WATER TECH
Institutionalizing Drinking Water Security: Making the Issues Real for Small System Capacity Development Joy Barrett Rural Community Assistance Partnership.
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
Boil Water Notices – Mandated vs. Precautionary Operating Board November 6, 2014.
All About Sanitary Surveys David Edmunds Environmental Program Specialist ADEC Drinking Water Program Sustained Compliance: What It Means to Public Water.
TOTAL COLIFORM MONITORING 40 CFR TRANSIENT NON-COMMUNITY PUBLIC WATER SYSTEMS.
EPA Groundwater Rule 40 CFR Parts and 142. Reasons for the Groundwater Rule  To protect public health due to viruses and other bacterial exposure.
Adem.alabama.gov Revisions to the Total Coliform Rule (RTCR) AWWA Alabama-Mississippi Section ADEM Regulation Update February 26, 2014 George Cox (334)
Revised Total Coliform Rule Sandy Brentlinger Southwest Drinking Water.
Revised Total Coliform Rule (RTCR) Community Systems Rychel McKenzie Jason Pushard December 2015.
THE IMPORTANCE OF SANITARY SURVEYS by Mary L. Howell, Backflow Management Inc.
Not all changes will be discussed please view all regulations at
TCEQ Office of Water Water Supply Division Public Drinking Water Section RTCR PWS Training Workshop October 28, 2015.
Total Coliform Rule (Old)vs. Revised Total Coliform Rule (New)
Level 2 Assessment. Abbreviations to Know RTCR – Revised Total Coliform Rule TCR – Total Coliform Rule TC – Total Coliform EC – E. Coli PN – Public Notice.
Public Notices and Violations. Abbreviations To Know RTCR – Revised Total Coliform Rule TCR – Total Coliform Rule TC – Total Coliform EC – E. coli PN.
Reporting, Public Notification and Recordkeeping 40 CFR ,.32, and.33 Ken Morin Bureau of Land Management.
Level 1 Assessment. Abbreviations To Know RTCR – Revised Total Coliform Rule TCR – Total Coliform Rule TC – Total Coliform EC – E. Coli PN – Public Notice.
2012 Industrial Stormwater General Permit Modification Presented by: Jeff Killelea Department of Ecology Moderated.
 171 Public wells sampled in 2014  Bacteria and Nitrate samples taken  38 wells inspected (Surveyed)  1 nitrite sample taken.
Leah Guzman and David Edmunds Environmental Program Specialists Department of Environmental Conservation.
Environmental Health Service Learning and Water Quality in Gales Point, Belize International Health and Human Service Learning Program Belize 2009 College.
Revised Total Coliform Rule Rural Water Workshops
Workshop developed by RCAP/AWWA and funded by the USEPA
Total Coliform Rule (TCR)
Penn state recommends…
Utility Board Training: Technical Capacity
TCEQ Office of Water Water Supply Division
TCEQ Office of Water Water Supply Division
BACKFLOW MANAGEMENT INC
Sample Siting Plans under the Revised Total Coliform Rule
Sample Site Plans.
Treatment – Chlorine Disinfection
OHWARN Workshop Disruption of Service Rule Update
Alexander Hinz & Kasy Stinson Water Supply Division
Kasy Stinson Water Supply Division
Presentation transcript:

Ground Water Rule Review, Updates and Compliance Plans MSDH – Bureau of Public Water Supply Spring 2012

Ground Water Rule Review  All PWSs (CWSs And NCWSs) with groundwater sources are required to comply with the GWR  Systems were given a choice to provide 4-log disinfection or conduct any necessary source water monitoring called for under the rule  All systems must undergo a sanitary survey.

Monitoring Option #1  Provide 4-log and keep MORs. Must daily or continuously monitor chlorine at each entry point and keep records to be reviewed during annual inspections Must daily or continuously monitor chlorine at each entry point and keep records to be reviewed during annual inspections MORs are available on our website at MORs are available on our website at Must meet a pre-determined minimum chlorine concentration at each entry point Must meet a pre-determined minimum chlorine concentration at each entry point Failure to meet minimum chlorine for >4 hrs equals a treatment technique violation Failure to meet minimum chlorine for >4 hrs equals a treatment technique violation Failure to keep 4-log records equals a monitoring violation Failure to keep 4-log records equals a monitoring violation

Monitoring Option #2  Conduct Source Water Monitoring. Triggered SWM – a positive routine distribution sample “triggers” a requirement to take a well sample from each well that was running. Triggered SWM – a positive routine distribution sample “triggers” a requirement to take a well sample from each well that was running. Assessment SWM– one sample per month for 12 months from each well that is classified as “Moderate” and is less than 500 ft. deep, and wells that are classified as “High” in the MDEQ SWAP report. Assessment SWM– one sample per month for 12 months from each well that is classified as “Moderate” and is less than 500 ft. deep, and wells that are classified as “High” in the MDEQ SWAP report.

What if I get a bad well sample?

Source Water Monitoring  If the well sample is E.coli positive, the system must immediately issue a SYSTEM-WIDE BOIL WATER NOTICE.  Then the system must take corrective action…

Corrective Actions Implementation  If e.coli positive, issue SYSTEM-WIDE BOIL WATER NOTICE and: 1. Shut the well down and have it cleared before putting back online AND identify the source of contamination and eliminate it within 120 days of the e.coli+ ; OR 2. Provide 4-log disinfection at that well and continue 4-log in the future.

 If sample is total coliform positive: 1. Take the well out of service and clear it before placing it back in service, OR 2. Leave the well in service but begin compliance monitoring for 4-log, OR 3. Leave the well in service with the affected system under BOIL WATER NOTICE until the well can be taken offline and cleared. Corrective Actions Implementation

SWM Results  So far, approximately 10% of well samples have been TC+, one e.coli positive well sample  Systems with TC+ well samples start with replacing the sample faucet and flushing  If still bad, then they disinfect and try again  If still bad, then they either leave the well offline until it can be cleared, or they begin 4- log monitoring or remain under BWN until the problem is corrected

Sanitary Surveys  Community systems are underway and will be completed by December  Non community non transients in 2013  Transients in 2014  Evaluating systems for “significant deficiencies” in eight (8) categories defined in the Rule.  Deficiencies are on our website.

8 Critical Elements Source Treatment Distribution System Finished Water Storage Pumps, Pump Facilities, and Controls Monitoring, Reporting, and Data Verification System Management and Operation Operator Compliance with State Requirements

Source   Well near a source of fecal contamination (e.g., septic system or a sewer line)   Well in a 100-year flood zone   Improperly constructed well (e.g., improper surface or subsurface seal, well not grouted to the aquifer)   Spring boxes that are poorly constructed and/or subject to flooding

Treatment   Inadequate application of treatment chemicals (Health related MCLs)   Lack of redundant mechanical components where treatment is required

Treatment   Unprotected cross-connections with treatment chemical systems   Inadequate monitoring (Health related MCLs)

Distribution System   Negative pressures that could result in contamination   Inadequate disinfectant residual monitoring, when required   Unprotected cross-connections

Finished Water Storage   Inadequate internal cleaning and maintenance of storage tanks Tanks must inspected and cleaned or painted, if needed, once every 10 years to avoid s.d., once every 5 years to get credit on Capacity Assessment

Finished Water Storage Storage tank roofs or covers need repair (e.g., holes or hatch of improper construction)

Pumps, Pump Facilities, and Controls   Inadequate pump capacity   Inadequate maintenance   Inadequate/inoperable control system

Monitoring, Reporting, and Data Verification   Not monitoring according to site sampling plan or monitoring plan   Failure to meet reporting requirements   Inadequate recordkeeping

System Management and Operation   Failure to meet water supply demands/interruptions to service (overloaded system, overloaded booster stations)   Lack of approved and updated (annually) emergency response plan or vulnerability analysis   Inadequate follow-up to deficiencies noted in previous assessment/survey   Inadequate security measures

Operator Compliance with State Requirements   Operator is not certified as required by the State   Lack of operator training

Sanitary Surveys  Thus far, the most common deficiencies identified are: Tanks not inspected and cleaned or painted within the past 10 years. Tanks not inspected and cleaned or painted within the past 10 years. No VA or ERP, or not updated annually No VA or ERP, or not updated annually Improper fencing Improper fencing Lack of redundant chlorination at systems with only one-entry point and no backup Lack of redundant chlorination at systems with only one-entry point and no backup Cross connection control program not maintained Cross connection control program not maintained

Sanitary Surveys  If a significant deficiency is identified during your sanitary survey: We will notify you within 30 days in your report via a “Significant Deficiency Report” that is mailed with your inspection report We will notify you within 30 days in your report via a “Significant Deficiency Report” that is mailed with your inspection report We will notify CRG or MSRWA to provide assistance to you We will notify CRG or MSRWA to provide assistance to you You must respond in writing within 30 days of your receipt of your report with your proposed plan of corrective action You must respond in writing within 30 days of your receipt of your report with your proposed plan of corrective action

Timelines  When we receive your response, we look at two things: Does your proposed timeline fall within 120 days? Does your proposed timeline fall within 120 days? If yes, then we give you the full 120 days If yes, then we give you the full 120 days If not, then we issue a “Bilateral Compliance Agreement” based upon the timelines you propose in your response. If not, then we issue a “Bilateral Compliance Agreement” based upon the timelines you propose in your response.  You must comply with the timelines in the “Bilateral Compliance Agreement”.

Significant Deficiencies  Within 120 days of notification of a significant deficiency, the system must Correct the significant deficiency OR Correct the significant deficiency OR Be in compliance with a State-approved plan of correction. Be in compliance with a State-approved plan of correction.  Failure to do so will be a Treatment Technique violation requiring public notice within 30-days.

Significant Deficiencies  At this time, one staff member from Engineering (Anna Yamat) and one from Compliance (Ciara King) are tracking the compliance status of each system with significant deficiencies and also relaying triggered monitoring requirements to all systems.

 As of the spring of 2012, 260 systems out of about 650 have had at least one sig def  498 individual significant deficiencies – about 50% of those are resolved Significant Deficiencies