Complete Cryogenic Services, Inc.

Slides:



Advertisements
Similar presentations
International Mechanical Codes Scald Protection. – Where a combination potable water-heating and space-heating system requires water for space.
Advertisements

START-UP AND OPERATION OF MECHANICALLY SEALED EQUIPMENT 1:13.
Pipes Single Wall Pipes Double Wall Pipes
ADX 150 – Engine Repair ADX 170 – Climate Controls
3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Reservoirs Covered in Ch. 5 of Vickers Text
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
"AIR COOLER" Heat Exchanger
PROJECT 100. PROJECT 100 DESIGNED TO BE: Cost Effective Compact Strong Simple Light Reliable.
Tom Jespersen Energy Adviser. Verendrye Electric Service Area Serve parts of 6 counties around Minot 15,000 meters First PV system installed in 1991 Currently.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 1 NFPA 58, LP-Gas Code, sets out the minimum valve and fitting requirements for propane.
Hydronic Mechanical Controls
Mechanical for Oil Heat
Section 2 Safety, Tools and Equipment, Shop Practices
Warm magnets and the remote handling system in the J-PARCν beam line E. Hirose, K. H. Tanaka, Beam Channel Group.
Asahi/America Swing Check Valves
Fire Pump Functions The main function of a fire pump is to increase the pressure of the water that flows through it. Inadequate or nonexistent municipal.
PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14.
Asahi/America Thermoplastic Check Valves Ball Check Valves ½” - 4”PVC, CPVC, PP, PVDF Uniseat/ Seal.
DESIGN AND CONSTRUCTION OF AN INDUCTION FURNACE (COOLING SYSTEM) Presented by MG THANT ZIN WIN Roll No: Ph.D-M-7 Supervisors : Dr Mi Sanda Mon Daw Khin.
HVAC523 Circulator Pumps.
Floating Head Heat Exchanger
ALOKRAJ. V - NA07B004. High Pressure Water Jet Blasting Machine  One Electric driven water blasting machine  2 water jet guns, hoses 400 feet each as.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Norco Tank T/A Meeting  Review current contracting strategy & options for improved strategy  Review details of 2008 & projections for 2009 forward.
MonoDrive & XT Constant Pressure Controller
NGfL CYMRU GCaD PLUMBING APPLIANCES & COMPONENTS.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
Protect Your Investment Secure Ride Appendices
Student Book © 2004 Propane Education & Research CouncilPage Reducing Cargo Tank Vapor Pressure Using a Plant Compressor In order to use.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
Section 4 Ancillary Equipment Section 4 Ancillary Equipment Definition Dispensers & Under Dispenser Containment Vapor Recovery Drop Tube & Fill Port.
AdV Vacuum system changes, 23Feb2011 Central area vacuum equipment SVC 2 (mini) towers 1 new HV tower (Inj) DT,IB from HV->UHV towers (with additional.
April 19, 2006A.Klebaner Cryogenics for ILC TA Current Status Plans and issues.
3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Replacing DOT IM tank valves and fittings requires careful application of precautions.
PIPE LINE SYSTEM Series Pipe Line System Class I Class II Class III
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
Section 1 Safety, Tools and Equipment, Shop Practices.
1 Status of Vacuum Process Facilities at SSL 16 October 2009 Sharon R Jelinsky Space Sciences Laboratory, UC Berkeley.
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
Esbe Rotary Motorized valves The ESBE Rotary Motorized valves (mixing valves and actuators) are used to control heating and cooling in buildings. We offer.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
RESEARCH AND DEVELOPMENT FOR FUTURE LHC SUPERCONDUCTING MAGNETS POINT SUR LA STATION D’ESSAIS préparé par Jean-Marc Gheller Steering committee –September.
Unit 209: Drainage systems
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Pixel Cooling Upgrade (2013) 1 December 20081Hans Postema - CERN.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
1. Engineering 2. Purchasing 3. Other department package assistances 4. Site supervision Instrument Department Activities:
Teleconf ACS – FREIA 28th March 2017
Teleconference ACS – FREIA 31th May 2017
West Melbourne Lease Requirements
2K Cold Box FDR Introduction
IT-4189 Supply and installation of a cryogenic distribution system
HFM Test Station Main Cryostat
Teleconference ACS – FREIA 10th May 2017
Teleconference ACS – FREIA 17th October 2017
Teleconference ACS – FREIA 31st October 2017
HOUGHTO-MIX Coolant Mixing and Supply Unit Rainer Hoerbst
The ultimate chain lubrication system. LC – Low Cost Lubrication Kits
THUM Adapter Impact on Hazardous Area Classification
PLUMBING APPLIANCES & COMPONENTS
NEW COMPLIANCE REGULATIONS
SNS PPU Cryomodule Instrumentation
Automotive Technology Principles, Diagnosis, and Service
Cryogenic upgrade of B165 CRG Status Meeting 16th may 2019
Presentation transcript:

Complete Cryogenic Services, Inc.

Occasionally a low temperature storage tank must be removed from service for repair or upgrade. If the tank is equipped with column mounted (in-tank) pumps the last 250mm of liquid can not be pumped out. Waiting for the remainder to boil away results in unacceptable delays to project schedule. BACKGROUND CCS

PROBLEM Most in-Tank pumps can not pump the liquid level below 250 mm. When the tank is removed from service up to six weeks may be required for the remaining liquid to boil away 300 mm remaining CC S

CCS TPOP (Patent Pending) will fit through any tank opening 6” or larger. The pump rests on tank floor and will pump liquid level down to 35 mm or less. SOLUTION CC S

mm remaining LNG LPG LEG SOLUTION CCS Temporary Pumpout Pump (TPOP) CC S

TPOP Adaptor CC S

Pump TPOP Adaptor CC S

Pump Power cables Ball valve Insertion tube TPOP Adaptor Seal Disk with O-Ring (2 on each section) O-Ring Seal 10 Feet 1.5” Discharge Pipe CC S

Pump CC S

Pump CC S

Pump CC S

Pump CC S

Pump CC S

Pump CC S

Pump CC S

Pump CC S

Pump Flange Connection CC S

Pump CC S

LNG LEG LPG Junction Box Electrical Seal Pressure Gage Control Valve Gland Seal Headplate CC S

Advantages of TPOP (Patent Pending) 1. No special tank penetration required. TPOP will fit through any existing nozzle 6” or larger. The nozzle must have an unobstructed path to the tank floor. 3. There are no leaks to atmosphere during installation or removal of TPOP. 4. A special tank top crane is not required, TPOP can be installed with a chain hoist. 5. TPOP is supplied with appropriate connections to customers piping system. 6. This system can be installed in one day. 7. Uses any electric voltage less than 600 volts, 50/60 Hz. 8. Faster delivery than conventional pump systems. 9. Economical. 10. Lease or purchase option. 2. Pump rated at 15 m m. CC S

Henry A. Smith III President President Patrick N. Davis Vice President Vice President CC S