Modeling in Support of Long Range Transportation Planning Scott Festin, AICP Data Manager Wasatch Front Regional Council March 29, 2007.

Slides:



Advertisements
Similar presentations
Danville Area Transportation Study. Fundamentals of Metropolitan Planning Organizations Adam Aull Danville Area Transportation Study MPO ASCE Presentation.
Advertisements

Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
GIS and Transportation Planning
What is SBCAG? Voluntary council of governments Established in 1966 under a JPA executed by local governments 13 member Board of Directors: – 5 County.
Introduction and the Context The Use and value of Urban Planning.
Twin Cities Case Study: Northstar Corridor. ●By 2030, region expected to grow by nearly 1 million, with 91% to 95% of new growth forecast to be located.
Evaluating the future: forecasting urban development using the urbansim land use model in el paso, tx. Quinn P. Korbulic.
What is the Model??? A Primer on Transportation Demand Forecasting Models Shawn Turner Theo Petritsch Keith Lovan Lisa Aultman-Hall.
Urban transportation planning process. Urban Transportation Planning Vital to an area ’ s economic and social health by moving people and goods (sometimes.
First home-interview survey (1944). Gravity model Where do the trips produced in TAZ 3 go? ? ? ? ?
Chapter 4 1 Chapter 4. Modeling Transportation Demand and Supply 1.List the four steps of transportation demand analysis 2.List the four steps of travel.
Lec 2. Ch.1 UTP: Definition and Context Primary purpose of the planning effort 4 basic questions of UTP UTP as a process Importance of considering multimodal.
Lec 20, Ch.11: Transportation Planning Process (objectives)
Lec 15 LU, Part 1: Basics and simple LU models (ch6.1 & 2 (A), ch (C1) Get a general idea of urban planning theories (from rading p (A)
Planning Process ► Early Transport Planning  Engineering-oriented  1944, First “ O-D ” study  Computational advances helped launch new era in planning.
Integrated Land Use, Transportation, and Environmental Modeling Alan Borning, University of Washington Mark Simonson, Puget Sound Regional Council NSF.
1 Integrating Land Use, Transportation and Air Quality Modeling Socio-Economic Causes and Consequences of Future Environmental Changes Workshop November.
Urban Transport in the Developing World. Elements of Urban Transport Sector Urban public transport: Urban public transport: On-street systems (for buses,
REGIONAL FORUM FOR BEVERLY, DANVERS AND SALEM DECEMBER 8, 2010 North Shore Regional Strategic Planning Project.
TRANSPORTATION PLANNING. TOPICS 1.ROADS AND PUBLIC GOODS 2.RATIONALE TO JUSTIFY ROAD BUILDING 3.URBAN PLANNING AND TRAFFIC CONGESTION (UNINTENDED CONSEQUENCES)
Improving Your World. RS&H tradition began in 1941 Employee-owned company Six programs of client-focused services Multi-disciplined team of planners,
Collaboration Collaboration Regional Transportation Plan (RTP) Regional Transportation Plan (RTP) Housing choices and opportunities Housing choices and.
Transit Estimation and Mode Split CE 451/551 Source: NHI course on Travel Demand Forecasting (152054A) Session 7.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
ENVISION TOMORROW UPDATES AND INDICATORS. What is Envision Tomorrow?  Suite of planning tools:  GIS Analysis Tools  Prototype Builder  Return on Investment.
Ed Christopher Resource Center Planning Team Federal Highway Administration 4749 Lincoln Mall Drive Matteson, IL 60443
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Housing Element Update Workshop The City of Fillmore is Currently Updating its Housing Element  State law mandates the Housing Element be included.
UrbanSim Model and Data Development John Britting Wasatch Front Regional Council.
Chapter 8 – The Comprehensive Plan 10/3/ The Goals of Comprehensive Planning  Comprehensive plans are usually prepared for a period of 20 years.
Jeff’s slides. Transportation Kitchener Transportation Master Plan Define and prioritize a transportation network that is supportive of all modes of.
Beyond the Environment: Socio- Economic Sustainability & Meaningful Community Input in Land Use Decisions Sarah Muller March 7 th, 2008.
Utilizing Advanced Practice Methods to Improve Travel Model Resolution and Address Sustainability Bhupendra Patel, Ph.D., Senior Transportation Modeler.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
Finance: The Critical Link The Transportation – Land Use – Environment Connection Brian D. Taylor October 2003 Institute of Transportation Studies.
Modeling in the “Real World” John Britting Wasatch Front Regional Council April 19, 2005.
Business Logistics 420 Public Transportation Lecture 18: Demand Forecasting.
Growth Management Legislative Discussion March 20, 2012.
1 Transportation Policy and Performance: The challenges and opportunities of performance-based programs Deputy Administrator Therese McMillan Federal Transit.
Transportation Planning, Transportation Demand Analysis Land Use-Transportation Interaction Transportation Planning Framework Transportation Demand Analysis.
Client Name Here - In Title Master Slide Data Requirements to Support Road Pricing Analyses Johanna Zmud, Ph.D. NuStats Partners, LP Expert Forum on Road.
1 Statewide Land-Use Allocation Model for Florida Stephen Lawe, John Lobb & Kevin Hathaway Resource Systems Group.
Central California Planning Commissioners’ Workshop May 13, 2011 Barbara Steck, AICP, Deputy Director Fresno Council of Governments 2035 Tulare Street,
On the Road to a New Metropolitan Transportation Plan Spokane Regional Health District Board of Health April 25, 2013.
Creating the 2040 Regional Transportation Plan. Today’s Presentation Now Developing the Next RTP  Very Early Stages of Development  Website: 2040Plan.org.
Energy Sustainable Florida Communities Project FSU Institute for Energy Systems Economics & Sustainability, Energy & Governance Center Richard C. Feiock.
Regional Transit Study Project Update. Four open houses held between November , 2009 Informed and engaged the public in the study process Provided.
Transportation Funding Workshop Nova Southeastern University December 10, 2012.
Linking Planning and Operations in Las Vegas Talking Operations Seminar March 23, 2005.
Business Logistics 420 Public Transportation Lecture 17 Transportation Planning Overview.
13 th – 15 March, 2006 New Perspectives in Real Estate Development In Port of Spain Welcome.
Regional Transportation & Land Use IREM / BOMA Real Estate Forecast Breakfast 2009 Rich Macias, Director Regional & Comprehensive Planning Southern California.
Putting the LBRS and other GIS data to Work for Traffic Flow Modeling in Erie County Sam Granato, Ohio DOT Carrie Whitaker, Erie County 2015 Ohio GIS Conference.
Comprehensive Plan Update. General, far-reaching vision to benefit the whole community Takes a long term view of issues Focuses on physical development.
INCORPORATING INCOME INTO TRAVEL DEMAND MODELING Brent Spence Bridge Case Study October 13, 2015.
An AQ Assessment Tool for Local Land Use Decisio ns 13 th TRB Transportation Planning Applications Conference May 9, 2011 Reno, Nevada Mark Filipi, AICP.
Housing and Transportation Affordability Index Study MWCOG Transportation Planning Board September 9, 2011.
The Kern Regional Transportation Plan A Vision and Guidebook for Kern County in 2025.
Babes-Bolyai University Faculty of Political, Administrative and Communication Science The need for Planning Diana Apostol NGO Management 1 st Year.
The 2006 Constrained Long-Range Transportation Plan: Plan Performance Ronald F. Kirby Director of Transportation Planning October 18, 2006 Item #7.
Travel Demand Forecasting: Traffic Assignment CE331 Transportation Engineering.
CEE 320 Winter 2006 Transportation Planning and Travel Demand Forecasting CEE 320 Steve Muench.
Validation and Sensitivity Testing of the Metropolitan Council Phase I Minneapolis-St. Paul Socioeconomic Land Use Forecasting Model Colby Brown, AICP.
City Council – Project Update September 14, 2015.
Transportation Modeling – Opening the Black Box. Agenda 6:00 - 6:05Welcome by Brant Liebmann 6:05 - 6:10 Introductory Context by Mayor Will Toor and Tracy.
1 PSRC and Comprehensive Plan Updates City of Duvall Joint Planning Commission / City Council Duvall, WA March 5, 2014.
Unit 1 THE TRANSPORTATION PLANNING PROCESS AND THE ROLE OF THE MPO LCTCC Educational Program.
Chapter 4. Modeling Transportation Demand and Supply
Transportation Task Force Mission and Vision
About the Transportation planning board
Presentation transcript:

Modeling in Support of Long Range Transportation Planning Scott Festin, AICP Data Manager Wasatch Front Regional Council March 29, 2007

Introduction 11 years at WFRC –Data Manager Socioeconomic Data GIS BS, Geography, University of Utah MA, Geography, UNC-Charlotte Eisenhower Research Fellow, Federal Highway Administration, Washington, DC

Wasatch Front Regional Council Metropolitan Planning Organization (MPO) for the Salt Lake City and Ogden-Layton Urbanized Areas 46 Cities, 3 Counties in Urbanized Area Additional work in Tooele and Morgan Counties “3C” process –Comprehensive –Coordinated –Continuing Coordinate with Mountainland Association of Governments (Provo/Orem Urbanized Area)

Wasatch Front Regional Council 18 Member board of elected officials –Salt Lake County-8 members –Davis County-4 members –Weber County-4 members –Morgan County-1 member –Tooele County-1 member –3 Non-Voting members from: Utah Association of Counties Utah League of Cities & Towns Envision Utah Professional Staff of 22

WFRC Staff Chuck Chappell, Executive Director –9 Planners –7 Engineers –Support staff Short Range PlanningTIP Long Range PlanningRTP ModelingTravel Model/UrbanSim Technical SupportSocioeconomics, GIS, Air Quality AdministrationAccounting, Secretarial, Public Involvement, CDBG, Etc.

Wasatch Front Regional Council Metropolitan Planning Organization (MPO) for the Salt Lake City and Ogden-Layton Urbanized Areas Federally mandated and created by the Governor. Urbanized areas with more than 50,000 population required to have an MPO. (23 USC 134 (b)(1)) WFRC formed in 1969, made an MPO in Two primary products –Regional Transportation Plan (RTP) –Transportation Improvement Program (TIP)

Regional Transportation Plan Must contain the following elements: –An identification of transportation facilities that should function as an integrated metropolitan transportation system. –A financial plan based on reasonably anticipated revenues that demonstrates how the adopted long- range transportation plan can be implemented. –Ensure the preservation of the existing metropolitan transportation system, and make the most efficient use of existing transportation facilities –Indicate proposed transportation enhancement activities Must be updated at least every four years Minimum 20 year planning horizon

Transportation Improvement Program Must contain the following elements: –a priority list of proposed federally supported projects and strategies to be carried out within the 4-year period after the initial adoption of the transportation improvement program; and –a financial plan that: (i) demonstrates how the transportation improvement program can be implemented; (ii) indicates resources from public and private sources that are reasonably expected to be available to carry out the program; (iii) identifies innovative financing techniques to finance projects, programs, and strategies; and (iv) may include, for illustrative purposes, additional projects that would be included in the approved transportation improvement program if reasonable additional resources beyond those identified in the financial plan were available.

Funding Prioritization All Federal Transportation funding must be prioritized and authorized by the Board. This is done through the TIP and RTP. –Projects need to be on the RTP and TIP to be built. In the first phase of the RTP ( ), there will be approximately $5.7 Billion in highway and transit capital expenditures.

Modeling to Support Transportation Planning Socioeconomics Travel Demand Modeling Air Quality Modeling UrbanSim Landuse Model Real World Data

Socioeconomic data form the foundation of all MPO modeling WFRC maintains the only set of small area population and employment projections –Internal uses –Public sector uses Water and sewer planning Schools –Private sector uses Economic development Community activism Socioeconomics Socioeconomic Data Travel Demand Model Air Quality Model

What is a Travel Model? A systematic tool to forecast future travel. One of many tools used in decision-making process. The 4 steps of modeling process (typically) are: –0. Land Use Forecasting (Socioeconomics) –1. Trip Generation –2. Trip Distribution –3. Mode Split –4. Trip Assignment

Model Inputs Network of zones and links 1300 zones contain socioeconomic data (people/jobs) 20,000 links describe road/transit infrastructure (lanes, speed, capacity, headway etc.)

Networks

Trip Generation Trip Distribution Mode Choice Trip Assignment Each zone produces and attracts trips, based on the amount and types of activities within the TAZ. Modeling Steps TAZ PopulationJobs LANDUSE DATA

Trip Distribution Trip Distribution estimates the number of trips between zones Trip Generation Trip Distribution Mode Choice Trip Assignment Modeling Steps

Mode Choice Mode Choice considers travel time, auto availability, and costs in estimating the likelihood of making trips by car, train, bus, etc. Trip Generation Trip Distribution Mode Choice Trip Assignment Modeling Steps

Trip Assignment Trip assignment estimates which road or route should be taken. Considers travel time, congestion, speed, distance, transit transfers, etc. Trip Generation Trip Distribution Mode Choice Trip Assignment Modeling Steps

Difficult Emerging Questions Land-use affects transportation decisions Transportation affects land-use growth New technologies (e.g. ITS, rail) New policies (e.g. tolls, taxes)

Introduction to UrbanSim Forecasts future land-use (households, jobs) Effective means to incorporate city and county land-use plans into regional transportation plans State-of-the-art –Defensible microeconomic theory –Incorporates transportation accessibility –Locally calibrated –Tremendous interest across the U.S. Still in developmental stages First use for planning was past summer

WFRC Interest Effort began in 1997 Committed to exploring and discussing linkages between land-use and transportation in RTP –Wasatch Choices visioning effort Extensive staff time fine-tuning UrbanSim database and model –Major technical questions have been answered –Updating input data

UrbanSim – Travel Model Interactions UrbanSimTravel Models Households by Income Age of head Size Workers Children Employment by sector Accessibility Highway Travel Times Vehicle Ownership Probabilities

Linked Urban Markets Governments Infrastructure Land FloorspaceHousing HouseholdsBusinessesLabor Services Developers Flow of consumption from supplier to consumer Regulation or Pricing

Overview of Modeling system >30 models within local UrbanSim application –Land Value (by type of use) –Real Estate Development (by type of use; intensity) –Residential location (by type of household) –Employment location (by type of industry)

Key Variables in Models Land value Vacant land (for developer models) Accessibility measures (for example) –Proximity to transportation facilities –Jobs/households within 30 minutes Neighborhood traits (for example) –Housing and employment within walking distance –Neighborhood mix (e.g. by income, by type of real estate) Decision-maker’s characteristics (e.g. income, HH size, sector)

Model Constraints Environmental features –Steep slope –Wetlands/lakes/streams –Superfund Regional Policies –Urban growth boundary –Open Space Local Land Policies –Type of use –Allowable density of use

Political Challenges Political issues can be more challenging than the technical Inherent resistance to change Committing to a tool like UrbanSim affects entire planning realm (local/regional/state)

Real World Data Models are a representation of reality –There is some uncertainty in all models –Law of diminishing returns Models are only as good as the data inputs –“Garbage in, Garbage out"

Data Sources Very little data used in modeling was collected for use in modeling UrbanSim input data –Parcel data collected and maintained by County Assessors for Property tax assessment. –Employment data collected by Workforce Services for administering unemployment insurance. Data limitations

Best Available Data The data you want may not always available Data that you can make work, is usually available Make due with the data that’s available –“Use it up, wear it out, make it do or do without.“ -FDR Data are surprisingly flexible. They can be made to fit.

Data Synthesis Sometimes you have to be creative in getting the data you need. Example: –Commercial space in Davis County Not in parcel data Estimates of floor space per employee Have locations of employers and number of employees Create space by calculating space requirements by number of employees It's an estimate and it's not perfect.

Emerging Issues American Community Survey –Census Long-Form data on an annual basis –Trade-offs Disaggregated models vs. Data privacy –Models are working at a finer level –Many data sources have privacy restrictions

Questions Contact Information –Scott Festin, AICP Wasatch Front Regional Council 295 Jimmy Doolittle Rd. Salt Lake City, UT (801) x113