MTA Installation Progress Report June 8, 2007 MTA Installation Web Page F.G. Garcia AD/Proton.

Slides:



Advertisements
Similar presentations
LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions.
Advertisements

11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
F.G. Garcia X37981 chopper Linac cable tray Cable penetration Overall View from the Linac Bridge Beam direction.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
A. Bross MTA RF WS August 22, Welcome MTA RF Workshop.
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
The Tevatron Decommissioning Plans AEM 10/17/11 Paul C. Czarapata.
MCTF C. Johnstone All Exp. Meeting 14 Mar First Beam to Muon Test Area Description and commissioning of beam to MTA Experimental Hall C. Johnstone,
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
MCTF C. Johnstone MUTAC Meeting 8-10 April Debut of the MTA beamline Description, status and commissioning plans.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
Mu2e WBS 2 Accelerator Progress Report Mu2e WGM 6/15/2011 Steve Werkema L2 Manager for the Accelerator Systems.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
PIP Status Report Linac Startup plans 12/05/2012.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
The Stripping Foil Test Stand in the Linac4 Transfer Line
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 07/01/2013.
Status and schedule for the H - source upgrade at HINS beam line HINS Meson meeting January 5 th, 2012 L. Prost (most inputs from Steve Hays & Alex Chen)
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
MuCool / Linac Diagnostic Beamline and MTA facility: External Beams Dept. C. Johnstone, + others Review Nov. 30, 2005.
PIP Status Report Linac Startup plans 12/05/2012.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
MTA Installation Meeting March 7, 2007 Agenda 1)Progress report (Fernanda) 2)Water skid discussion (Maurice) 3)Alignment needs (O’Sheg + all) 4)AOB Key.
03/30/2009F.G. Garcia Linac Group Meeting – March 30, 2009 Agenda: 1) Linac week’s performance 2) Ongoing projects – Status report 3) AOB.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
MTA Installation Meeting February 21, 2007 Agenda 1)Progress report (Fernanda+Carol) 2)Floor Plan layout (Fernanda+Larry) 3)AOB Key Red – critical Orange.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Booster bpm’s Jim Crisp 3/29/06. Plate width and linearity with the response linearized along the axis 60 and 20 degree plates become nonlinear in the.
PAC Meeting, December 12, Prebys 1 The Problem.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
P1, P2 and AP-1 Aperture Improvements February 5, 2015 J. Morgan 1.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 10/06/2014.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
ELENA installation progress F. Butin / ELENA collaboration.
Report Technical Director Storage-Ring-Installation Completed
J. Seeman Assistant Director for PPA/LCLS
Presentation transcript:

MTA Installation Progress Report June 8, MTA Installation Web Page F.G. Garcia AD/Proton Source Department

06/08/07F.G. Garcia2 MTA Quizz WWhat does MuCool stand for? Muon Cooling Experiment WWhat does MTA stand for? MuCool Test Area IIs this part of the Proton Source? No! This line belongs to External Beams Division SSo… Why do I care?? 1.Because they will extract beam from Linac MMore precisely, around the Chopper region 2.Because this line will provide us capability to measure Linac emittance 3.Because I am the Project Manager and… today is my birthday…

06/08/07F.G. Garcia3 MTA Beam line  The beam line will be used to test liquid hydrogen absorbers for  beam cooling Desirable beam requirements  H - at 400 MeV  50 mA peak current & 50 sec pulse 15 Hz (~1.6E13ppp) Big problem with shielding!!!  Other experiments can use a more modest integrated intensity and rep rate Tests of pressurized RF cavities Irradiation of detector components etc…

06/08/07F.G. Garcia4 MTA Beam line Layout pulsed magnets Cooling ring dipole Quadrupoles Shielding wall (12ft long) MTA Exp. Hall

06/08/07F.G. Garcia5 MTA Beam Line – Diagnostic Optical Functions Beta Functions Experiment hall ~10m magnet free straight section for transverse emittance measurement Beam size changes by an order the magnitude

06/08/07F.G. Garcia6 MTA Beam line Installation  Goal Install the MTA beam line components, or as much as possible, during this shutdown.  Start from scratch…or almost from scratch Build stands Refurbish magnets Utilities installation  Expand electrical distribution for MTA  Install cable trays  Install LCW system for cooling requirements Install instrumentation, magnets, beam valves, beam stops, vacuum, controls, etc…

06/08/07F.G. Garcia7 Organization Chart

06/08/07F.G. Garcia8 MTA - Progress Report  Real Estate established at the South end of the Linac Gallery (thanks Linac group!) Total of 8 relay racks  3 for power supplies  5 for electronics and controls  Magnets Current at IB2 for refurbishment/measurements  6 (5+1) CRD  12(8+4) 200 MeV (TQTB)  5 (4+1) SQA There are 2 new “C”-magnets been built  These magnets will be responsible for beam extraction from Linac to MuCool enclosure  Estimate time for delivery: middle August 6 CDA (5 install+1 spare) CDR in storage (02/22) Coil refurbished (04/24) Alignment nests (05/03) Current Status - Coil refurbishement complete -Power flag relocation ongoing -Water connections ongoing 10 TQTBs (install spares) (also known as 200MeV Quads, Green Quads, 400MeV Quads…) Reference the magnets complete Hydraulic test passed with flying colors… Current Status - Remnant field measurement complete - Upgrade the electrical box mostly complete - Beam pipes at desired length installed - Reference is complete Future Plans: - Ship to MAB to dry fit the stands and final storage 5 SQA Magnets (install spares) SQA staged at X gallery waiting to be shipped to IB2 (05/11) Current Status: - 4 magnets staged at IB2 - Need to retrieve one more SQA from Booster tunnel - Working on stand design ToDoList 1.Flush out the magnet 2.Hipot 3.Replace the water tubings with kynar 4.Weld alignment fiducials

06/08/07F.G. Garcia9 MTA - Progress Report  Alignment Network setup  Both enclosures have the network done Tiroids and monuments have been installed on the walls and floor respectively  At MTA Exp. Hall enclosure the local coordinate system has been established Awaiting for an opportunity to complete this job in Linac  The completion of this task prior the shutdown would gain valuable time during the installation  Power Supplies AD/EE group will support the power supplies  Quadrupoles (B. Brooker) 200 MeV Bartleson supplies SQAs Lambda  Cooling Ring Dipoles (B. Brooker) String of 4 PEI (Linac Lower Level) Single Power Ten (from 400MeV upgrade)  “C” magnet (M. Kuffer) New power supply being built  Trims (B. Brooker) Inherit from Booster after the shutdown

06/08/07F.G. Garcia10 MTA - Progress Report  Instrumentations/Diagnostics BPM System  Use 10 Booster style pickups  Readout electronics will be similar to the pbar target bpms. Toroid System  There will be 3 toroids installed The beam line only needs 2 toroids. One right at the extraction from Linac and the other at the very end. The 3 rd toroid will be installed adjacent to the most DW one for instrumentation/interlock group e-berm development platform  Booster has two (2) 3.25in Pearson toroids. The other one will be supplied by instrumentation group. MWs  Requirements: 7 MWs with different wire spacing  Booster has enough MW cans that will be re-used  MW electronics will be similar to KTeV system. BLMs  There will be 12 BLMs along the line.  Electronics will be provided by M. Olson.  Controls (M. Kucera) M. Kucera and R. Godwin are helping integrate MTA to the Linac Control System.

06/08/07F.G. Garcia11 MTA - Progress Report  Vacuum System Vacuum Components - 3 Ion pumps (600l/s) - 2 roughing valves - 2 Pirani gauge - 2 ion gauge - 2 beam valves Courtesy: T. Anderson

06/08/07F.G. Garcia12 MTA Installation - Current Issues  Shielding under the hatchway area The existing shielding underneath the hatch is not sufficient to run beam to the MTA enclosure 26’-0” 13’-6” concrete soil concrete air soil 21’-0” 10’-6” It has been installed primary to protect personnel inside the MTA enclosure from Linac beam

06/08/07F.G. Garcia13 MTA Installation – Current Issues (cont.)  Hey! Wait…there is more… Problem: 805 MHz waveguide, 201MHz Coax and cable tray run inside the hatch!!

06/08/07F.G. Garcia14 MTA Installation – Current Issues (cont.)  Head of External Beam line decided to remove the shielding blocks underneath the hatch and re-stack appropriately Work group meets weekly with safety to resolve this problem.  More manpower has been added to the group in order to re- design the shielding configuration  It must accommodate a beam stop upstream the shielding wall  It looks like one may be able to leave the WG, Coax and cable tray as is and work around it (?) Still need to be resolved and decided  MTA wants to run during the shutdown…  You may be wondering…if the shielding will be removed, what about NTF? Good question :  NTF will be able to run with the hatch shielding removed and the subsequent RF stations locked off.  However, the hatch must be installed and locked, and MuCOOL would need to be interlocked to Linac.

06/08/07F.G. Garcia15 MTA Installation – Current Issues (cont.)  If the shielding blocks are removed… The beam line installation will take advantage of this.  Major components will be lower to the enclosure thru the hatch area The original plan was to use the infrastructure available at north end of Linac  Up to 25% reduction in installation time one could expect If the network and the stake survey in Linac enclosure are accomplished prior the shutdown, another 3 days can easily be saved during the shutdown…

06/08/07F.G. Garcia16  Bottom line The project is facing some challenges  We have a plan to manage these problems in order to minimize the risk of project delay Working on a strategy to address the problem Patience and perseverance are the key at this point I have no doubt we will resolve the issues and complete the installation within the shutdown timeframe! MTA Installation – Current Issues (cont.)

06/08/07F.G. Garcia17 FIM

06/08/07F.G. Garcia18 Extract Beam to MTA line LinacMaxNominal Beam current (mA) 5035 Macro pulse width (sec) 5025 Repetition Rate (Hz) Beam intensity (protons/pulse) 1.6E165.5E12 The simplest way of doing it is to use a Linac beam study pulse. At a glance: - Currently Linac uses 3 dedicated chop lengths as inputs to the pulse shifter (HEP,NTF & studies). - T-clock event triggers request for beam, in this case, studies pulse ($OA). - The frequency of the beam can be adjusted by the rep rate generator.