Resource Planning. 51 Resource Planning Estimating Schedule Activity Resource Requirements Determining what resources will be required (labor, equipment,

Slides:



Advertisements
Similar presentations
Estimating, scheduling and budgeting
Advertisements

MS Project.
Advanced Project Management - CPH
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Critical Path and Gantt
Eleanor Roosevelt High School
CHAPTER 4 MANAGING PROJECT PROCESSES. THE CONCEPT A project is an interrelated set of activities that has a definite starting and ending point and that.
Projmgmt-1/18 DePaul University Evaluating Schedule In MicroSoft Project Instructor: David A. Lash.
Project Time Management
Importance of Project Schedules
Using MS Project To draw a Network diagram. Add tasks Add the 8 tasks listed for making a cup of tea. Add the duration of each –Note: MS Project doesn’t.
Chapter 4: Project Management Objectives Define the terms project and project management, and differentiate between project and process management. Describe.
Projmgmt-1/14 DePaul University Project Management I - Realistic Scheduling Instructor: David A. Lash.
Project Time Management
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
The Critical Path – Precedence diagram method Luise Lorenz Christina Mohr.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#10 DEPARTMENT OF ENGINEERING MANAGEMENT.
Evaluation#3 MS Project Objectived u In this lab you will learn: – how to add the resources into tasks. –How to review resource assignment information.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Software Project Management Task Estimating and Scheduling
Real-World Project Management Chapter 13. Characteristics of Project Management Unique one-time focus –Difficulties arise from originality Subject to.
Lecture 5 Title: Project Time Management By: Mr Hashem Alaidaros MIS 434.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Planning and Scheduling. Project Planning –Selecting Construction Methods and sequence of work –Must complete planning before doing scheduling –Steps.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Time Planning and Con trol Time-Scaled Network. Processes of Time Planning and Control activities 1.Visualize and define the activities. Job Logic 2.Sequence.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
© The McGraw-Hill Companies, Software Project Management 4th Edition Resource allocation Chapter 8.
Project Time Con trol. Control = Monitor + Compare + Analysis + Action  Definition: Controlling  Controlling involves making sure that the results achieved.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
1IT Project Management, Third Edition Chapter 6 Chapter 6: Project Time Management.
Advanced Project Management Project Time Management Ghazala Amin.
11/9/2015 9:42 AM 1 Project Time Control. 11/9/2015 9:42 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Scheduling Resources and Cost
Applied Software Project Management PROJECT SCHEDULES Applied Software Project Management 2:16:07 AM 1.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Pegasus Project Management: Resource Factors November 8, 2001 MBA 253 The Pegasus Group: Mario RossoMario Rosso Phil RandolphPhil Randolph.
PERT/Activity Diagrams, Completion Probability and the Z Score
Project Management Software Application PRM 705 Lecture 5 Mian Wasim Irshad.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Path and MS Project 2003 Tuesday, February.
Project Time Management
Project Scheduling Class 7.
Resource Loading and Leveling Kathy S. Schwaig. A Roadmap of the Project Planning Process Develop project charter Establish work breakdown structure Analyze.
Microsoft Project 2010 ® Tutorial 4: Assigning Resources and Costs.
E. M. Hanna; 7/31/03 DXI Management Consulting 1 Resource Leveling.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
6 Resource Utilization 4/28/2017 Teaching Strategies
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Project Time Management Based on PMBOK 5 th Edition Abdelrahman Sheta, PMP,ITIL 1PMP - Project Time Managementfacebook.com/Sheta.Page.
Time Planning and Control Time-Scaled Network
Project Management MGT 30725
Chapter 6: Project Time Management
Information Technology Project Management
Project Time Management
PROJECT TIME MANAGEMENT
In this tutorial you will:
Time Planning and Control Time-Scaled Network
Project Time Management
Activity on Node Approach to CPM Scheduling
Project Time Management
Project Time Management
Project Time Management
Project Time Management
Presentation transcript:

Resource Planning

51 Resource Planning Estimating Schedule Activity Resource Requirements Determining what resources will be required (labor, equipment, material) What quantity for each resource will be required. When are resources available to perform project activities.

51 Resource Planning Resource Estimating Techniques Expert Judgment – Any group or person with specialized knowledge. Bottom-Up Estimating – Decompose activities into smaller work components. Three Point Estimating – Optimistic, pessimistic and most likely values are determined to calculate estimate.

51 Resource Planning Resource Histogram A bar chart showing the amount of time assigned to a resource for the time interval. Resource availability is depicted as a line for comparison purposes. Resources assigned more work than available hours are considered “over- allocated”.

52 Resource Planning Resource Histogram 40 hrs Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Resource Histogram

52 Resource Planning Resource Conflict and Balancing Project calendar – defines the workable time periods for the project. Resource calendar – defines the workable time periods for the specific resource. Conflicts in resource availability and schedule activity dates must be resolved to ensure the project will be completed according to accepted project objectives.

52 Resource Planning Resource Leveling Schedule network analysis technique applied to a schedule model that has a critical path identified. Schedule start and finish dates can be modified to reflect resource availability. Identifies under-allocated resources

52 Resource Planning Resource Leveling Different methods for resource leveling Project Manager analyzes effects on project objectives (time and cost) for resolving resource conflict.

52 Resource Leveling Methods 1. Do Nothing if over-allocation is within acceptable limits Schedule/Time Impact – None Resource/Cost Impact - None

53 Resource Leveling Methods 2. Delay non-critical tasks within available float Schedule/Time Impact – None Resource/Cost Impact – None (except for inflation effects)

53 Resource Leveling Methods 3. Extend non-critical task durations within the available float Schedule/Time Impact – None Resource/Cost Impact – None (except for inflation effects)

53 Resource Leveling Methods 4. Add or substitute resource of equal or greater capability Schedule/Time Impact – May need to consider learning curve for new resource. (Duration may shorten if resources are added – schedule crashing) Resource/Cost Impact – Cost impact if substitute resource has higher costs

53 Resource Leveling Methods 5. Delay critical path tasks Schedule/Time Impact – Schedule impact equal to the delay Resource/Cost Impact – Cost impact due to project time extension and inflation costs delay

53 Resource Leveling Methods 6. Extend critical path task durations Schedule/Time Impact – Schedule impact equal to the delay Resource/Cost Impact – Cost impact due to project time extension and inflation costs delay

53 Resource Leveling Methods 7. Authorize Overtime Schedule/Time Impact – Could shorten schedule (schedule crashing) Resource/Cost Impact – Cost impact due to premium cost rates $

53 Resource Leveling Methods 8. Split the task into non-sequential pieces Schedule/Time Impact – Schedule impact if part of task extends beyond float (soft logic) Resource/Cost Impact – Cost impact due to project time extension and inflation costs and inefficiencies in splitting task

54 Resource Leveling Methods 9. Modify the scope Schedule/Time Impact – Could shorten schedule due to less work or quality of work being accomplished Resource/Cost Impact – Could go either way. In the short term, costs could be less due to less work, but long term costs may increase

55 Module 5 Exercise – Resource Leveling

55 Module 5 Exercise – Resource Leveling W1 W2 W3W4W5W6W7W8W9W Resource Histogram A C B A C B A C B A C B D C E D E F J G E J F G E J H G H

55 Module 5 Exercise – Resource Leveling 55

Module 5 Exercise – Resource Leveling 56 W1 W2 W3W4W5W6W7W8W9W Resource Histogram A C B A C B A C B A C B D C E D E F J G E JF G EJ H G H