Post Mortem Workshop - discussion1 17/1/2007 HWC Requirements GMPMA  Concentrate on pre-beam requirements Post-quench analysis ([semi-] automatic) Integrity.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

Copyright Hub Software Engineering Ltd 2010All rights reserved Hub Document Exchange Product Overview Secure Transmission for Transaction-based Documents.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automatic POWERING EVENT Analysis Adam, Arek, Gert-Jan, Ivan, Knud, Hubert, Markus, Nikolai, Nikolay,
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems WP8: Use case 1: Quality Analysis for Satellite Missions.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
W. Sliwinski – eLTC – 7March08 1 LSA & Safety – Integration of RBAC and MCS in the LHC control system.
Distributed BI Systems BLM, BPM, BTV and BRAN Laurette Ponce & Fabio Follin Thanks to: Anthony Rey, Enrico Bravin, Rhodri Jones, Bernd Dehning, Mariusz.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
Premature Dumps in 2011 Acknowledgements: A.Macpherson, G.Papotti, M.Zerlauth M.Albert LHC Beam Operation Workshop December 2011.
Logging Mike Lamont Georges Henry Hemlesoet AB/OP Discussions with M. Pace & C. Roderick.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE  Questions? RADE Applications EN-ICE-MTA.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
Real time performance estimates of the LHC BPM and BLM system SL/BI.
LHC Machine Checkout & Dry Runs Strategy Acknowledgements: R.Alemany, R.Giachino M. Albert LHC Beam Operation Workshop June 2014.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
Running scenario 2009/10 Run through components – and then synthesis.
The ATLAS DAQ System Online Configurations Database Service Challenge J. Almeida, M. Dobson, A. Kazarov, G. Lehmann-Miotto, J.E. Sloper, I. Soloviev and.
Andrzej Siemko On behalf of the MPP-GMPMA Task Force: (A. Ballarino, R. Denz, B. Khomenko, A.Perrin, P. Pugnat, A. Rijllart, L. Serio, A. Siemko, A. Vergara.
08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.
MA PM performance, Adriaan Rijllart Post Mortem data handling and performance Adriaan Rijllart, Beno î t Pannetier, Boris Khomenko, Greg Kruk,
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
Post Mortem Workshop Session 4 Data Providers, Volume and Type of Analysis Beam Instrumentation Stéphane Bart Pedersen January 2007.
PM System Architecture Front-Ends, Servers, Triggering Ingredients Workshop on LHC Post Mortem Session 1 – What exists - PM System, Logging, Alarms Robin.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Transfer Line Test preparation meeting V. Kain, R. Alemany.
16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
The Dashboard The Working Conditions The Common Chapters State What’s Next.
A Validation System for the Complex Event Processing Directives of the ATLAS Shifter Assistant Tool G. Anders (CERN), G. Avolio (CERN), A. Kazarov (PNPI),
Interfacing the FMCM for additional protection in the LHC and the SPS- LHC/CNGS Transfer Lines to the CERN controls system Cristina Gabriel Casado, Interlock.
First Ideas – New Wire Scanner GUI - LHC V. Kain, G. Crockford, M. Kuhn Emittance Working Group 6/26/
LHC machine protection close-out 1 Close-out. LHC machine protection close-out 2 Introduction The problem is obvious: –Magnetic field increase only a.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
Industrial Control Engineering Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE 
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: Low Level RF system group Thomas Schilcher :: Paul Scherrer Institut SwissFEL.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
Use of a Diamond BLM System in the LHC Ring
RF acceleration and transverse damper systems
LHC Beam Commissioning Meeting V. Kain & R. Alemany
Data providers Volume & Type of Analysis Kickers
DRY RUNS 2015 Status and program of the Dry Runs in 2015
2007 IEEE Nuclear Science Symposium (NSS)
R. Denz, A. Gomez Alonso, AT-MEL-PM
Beam dump XPOC analysis
Use of a Diamond BLM System in the LHC Ring
Next Generation of Post Mortem Event Storage and Analysis
The LHC - Status Is COLD Is almost fully commissioned
How do we tackle the extended requirements?
J. Uythoven for the MPE-MI & MS Teams
Commissioning and Testing the LHC Beam Interlock System
MPSC Procedures An update
Distributed BI Systems
Dry Run 0 Week 13: BI test of...everything circulating beam: all fixed displays and BI applications OP directories for 2009, concentrators running Need.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Wire almost entirely through beam before BLM triggers dump
Machine Protection System Commissioning plans
LHC BLM Software audit June 2008.
The LHC Beam Interlock System
LHC Systems Providing Post-Mortem Data
Close-out.
Presentation transcript:

Post Mortem Workshop - discussion1 17/1/2007 HWC Requirements GMPMA  Concentrate on pre-beam requirements Post-quench analysis ([semi-] automatic) Integrity checks Soft inhibit of power permit Analysis  Individual systems  Lead through versus automatic  Three level analysis: ISA, LSA, GSA What is the timeline for delivery of analysis tools?  Clear this isn’t going to arrive as a turn key solution Manual check clearly essential, at least, at first But looking at 40 minutes per auxiliary circuits [time required for commissioning and testing tools]

Post Mortem Workshop - discussion2 17/1/2007 HWC Requirements Analysis trigger module  Should be straightforward Data completeness checks Data sanity checks Cross system signal browsing  Lack of cross system analysis at the moment Saved signal queries Individual system requirements have been specified. Are the global requirements clearly specified?

Post Mortem Workshop - discussion3 17/1/2007 HWC Observations Collection, conversion, storage  architecture and implementation look impressive  Performance Stability & load balancing tests in progress Long term data storage  Shouldn’t be a problem – needs clarification Alarms  A cross system time order list of faults is a definite requirements  LHC only, off-line extraction utility Logging  Looks good, measurement v. logging databases – PM extraction from both

Post Mortem Workshop - discussion4 17/1/2007 Open Issues PM versus triggered acquisition  No compromise Long term data storage QRL: no alarms, no logging?

Post Mortem Workshop - discussion5 17/1/2007 LabView development Specifications should be clear at this stage Analysis with LabView:  Plugin in modules [C, Matlab, C++(QPS)] What is the state of:  Implementation of specified requirements? Get the impression that this is reactive development  No clear planning for the next 6 months deliverables presented  Details of present status…

Post Mortem Workshop - discussion6 17/1/2007 State of play ExpertBrowserAnalysis QPSOwn facilitiesOK – need multiple buffers etc. Missing PICOKOK Correlations OK Sequencer to automatic tools Power Converters Workable in stand alone mode - Digital signals - Correlations OK (just!)Missing Cryo Logging: plant OK; cold mass? Vacuum Logging OK QRLWhere’s the logging?

Post Mortem Workshop - discussion7 17/1/2007 March: Single threaded, partially manual: acquisition, browsing, analysis May: Multi-threaded, automatic, cross-system: browsing, analysis, verification

Post Mortem Workshop - discussion8 17/1/2007 SEQUENCER [not strictly PM] HWC sequencer (Francois)  Two years of development. Tailored explicitly to HWC.  Francois unfortunately off sick for an extended period  Prototype of new version to be tested sooner on PIC tests.  Data provider for PM [test details]  Interaction with analysis modules  Going to have to move fast for new version to be ready for parallel HWC Interface to MTF, PM, test configuration, monitoring, SOC  HWC requirements do not equal Beam requirements

Post Mortem Workshop - discussion9 17/1/2007 IQC Injection Quality Checks [lower initial priority]  SIS? Good candidate?  Reaction time?  SDA??? YADS? Event based acquisition, storage & retrieval  Front-ends checks versus high level checks Spread in bunch currents Trajectory analysis RF – further discussion required

Post Mortem Workshop - discussion10 17/1/2007 XPOC Full and extensive list of requirements Version 1 – November 2007 Triggered acquisition Data archiving & retrievial Clear need for programmed dump PM suppression

Post Mortem Workshop - discussion11 17/1/2007 PM & Beam Operation Analysis might be difficult! Analysis components already exist LSA & PM technology mismatch? C++/Java???? Where’s the expertise? SDDS 2 CVS, root??? Default or on choice… Analysis free for all

Post Mortem Workshop - discussion12 17/1/2007 PM & Beam Operation Expert analysis – knowledge capture  PM pattern matching, PM data format is given, as is push. Trigger Unit  What is this going to do?  Does it has have enough time?  Data integrity checks  Data completeness Non PM event based acquisition and storage & retrieval & analysis tools *N Scalability tests to be performed

Post Mortem Workshop - discussion13 17/1/2007 Timing Looking good… Some clarification required: Same PM event per beam? Soft link between BICs  Wandering off into machine protection  Linking and unlinking of 2 rings’ dumps PM suppression?

Post Mortem Workshop - discussion14 17/1/2007 HWC HWC poses an immediate challenge  Clear statement of requirements  Resource loaded implementation schedule Complete mayhem coming up  Support, maintenance, mods, improvements etc.  Plus sequencer v2 Do Adriaan & team have the resources?

Post Mortem Workshop - discussion15 17/1/2007 Beam Large number of systems, huge amount of data incoming  BI (BPM, BLM etc. etc.), RF, Kickers, Dump, Collimators etc.  Impressive set of requirements specified Going to need a basic system in place for November  Spec? Requirements? Technology? Resources?

Post Mortem Workshop - discussion16 17/1/2007 Post Mortem Follow-up??????