Bridge Owners Forum May 2008 ESDAL Stakeholder Management Team bringing service to life.

Slides:



Advertisements
Similar presentations
Deakin University CRICOS Provider Code: 00113B PREPARING FOR CONFIRMATION OF CANDIDATURE 2014 School of Exercise & Nutrition Sciences.
Advertisements

Training Presentation E-Learning Test Request. Objective Provide Test Center staff members with information about the e-learning test request process.
Becoming a MI Bridges Navigation Trainer Michigan Association of United Ways June 21, 2012.
Step by step guide.
CareCentrix Direct Training.
U.S. Pretrial Services and Probation Office Northern District of Ohio.
Copyright Kenneth M. Chipps Ph.D.
Repayment Seminar.
Vendor Interface Training Manual. 2 Hub Online's Vendor Interface program utilizes the latest internet technology to satisfy all kinds of shipping needs.
New I-65 Interchange at Worthsville Road Welcome!.
Overheight Loads WSDOT Commercial Vehicle Services.
1 © 2006 by Smiths Group: Proprietary Data Smiths Group Online Performance Review Tool Training.
Proposed Tire Broker Regulations Informal Online Workshop Wednesday, March 4, 2015.
Career Class Mr. Endicott.  Knowledgeable about your work habits, character, special skills and potential  Enthusiastic about you and your career plans.
7 Day Self Assessment Tool (7 Day SAT) User Guide v7 (June 2015)
ASPEC Internal Auditor Training Version
Quality Representative Training Version
Business Continuity Check List PageOne. - Why Does Your Business Need A Continuity Checklist? Should the unexpected occur, your business will be able.
Homepage To learn about eLOMA click on the ‘Learn about eLOMA’ link under the Tools For Professionals.
MICHIGAN DEPARTMENT OF TRANSPORTATION Transport Permit Unit
Disclaimer This presentation is the property of MarketLinx Solutions™ and is intended for the exclusive use of NTREIS and may not be distributed, copied.
CDM & RIBA Plan of Work th June 2013 Ross Gooding – Principal Health and Safety Consultant / CDMC.
Emergency Action Plans Miriam Gradie Anderson Planning Specialist 608/ Wisconsin Department of Natural Resources.
Property Tax Section Local Government Division Records Retention Records Retention.
May Key Dates for Parents Registration For Kent Test 1st June to 1 st July 2015 Only register your child if you want them to sit the 11+ test Please.
Presentation of the protocol of procedure. 5 criteria to launch the alert a victim who is a minor an abduction a danger for the victim information that.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
NAMS Account Activation Training. 2 What is NAMS? The NASA Account Management System is NASA’s centralized process for requesting and maintaining accounts.
Request must be submitted a minimum of 5 working days prior to event. Do not promote event until confirmation is received. Any questions or assistance.
E-science grid facility for Europe and Latin America Bridging OurGrid-based and gLite-based Grid Infrastructures Abmar de Barros, Adabriand.
Gradebook Parent Portal. At Ray School, beginning with the second quarter of the school year, parents will have access to a web-based tool that.
Building Strong Library Associations | Regional Convenings DAY 2 Session 4 Identify Milestones and Responsibilities: Slides.
Performance Management Overview
Environment, Health and Safety OARS Online Accident Reporting System A guide to the University of Calgary’s new web- based On-line Accident Reporting System.
Preparatory projects and funding opportunities 21 st April 2010 – Portrush, Northern Ireland Teresa Lennon and Michael O’Brien European Union European.
NH Department of Education Division of Program Support Bureau of Nutrition Programs and Services Verification Module for National School Lunch Program.
Clear and Foster Creek Fish Passage Assessment and Prioritization Project Draft Methodology Report: For the Clear and Foster Creek Fish Passage Assessment.
Submitting Course Outlines for C-ID Designation Training for Articulation Officers Summer 2012.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
Project Schedules The Cabinets New Categories of Scheduling.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
The Utility Consumer Bill of Rights Information About the Rights and Responsibilities of Utility Consumers in the District of Columbia DC Office of the.
July 22, 2009 Sunflower Project Monthly Conversion Meeting – July.
There are 2 Types of Bridge Inspectors – Class B and Class A.
Counseling & Human Development HOW TO FILL OUT THE RELEASE OF INFORMATION FORM.
Danbro Selected Data For Maps Prioritizing / Ranking Arne Henriksen NVF Annual Bridge Conference 2015.
AN OVERVIEW OF LAWS AND RULES GOVERNING ROAD FREIGHT TRANSPORT AND THEIR ENFORCEMENT ISSUES IN PAKISTAN Shahbaz Latif Mirza Assistant Chief National Transport.
Science & Engineering Research Support soCiety Guest Editor Guidelines for Special Issue 1. Quality  Papers must be double -blind.
Clearing Permissions for my manuscript What do I need to know and what do I do? Emily Hall Rights Manager
Preparing the Phase 0 Proposal What in the world are the proposal reviewers looking for?
Building Strong Library Associations | Library Associations in Society: An Overview DAY 2 Session 4 Identify Milestones and Responsibilities: Slides.
Page 1 of 42 To the ETS – Create Client Account & Maintenance Online Training Course Individual accounts (called a Client Account) are subsets of the Site.
Design 11 Mr. Jean September 12 th, The plan: Video clip of the day Rules of Copyright Design of our world (15minutes) Assignment #1 –Editing and.
Royal Mail Group: Scheme for Growth Pilot A simple guide.
SGNDP STEERING GROUP MEETING 20 TH JANUARY 2016 SGNDP Steering Group 20/01/20161.
Job site An Inside Look…
There are 2 Types of Bridge Inspectors – Class B and Class A.
Oversize/Overweight Vehicle Permitting
Welcome! To the ETS – Create Client Account & Maintenance
Statistical returns in respect of the carriage of goods by road
Significant Procedural Changes to the One-Call System
Traffic Regulation Order Process for Public Rights of Way
BCS Template Presentation February 22, 2018
ONLINE FILING Updates and Review
LDV Real Driving Emissions: - Assessment of RDE data evaluation methods: Set-up of "reference database“ - 16th of September 2013, Brussels Pierre Bonnel.
Using the AIM Alternative Testing Module (for Instructors)
Using AIM (for Instructors)
ESFA Update for North East Learning Providers Network
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
The process of secondary school transfer for pupils with an EHC Plan is different to those children who don’t have an EHC Plan. Children who have an EHC.
Presentation transcript:

Bridge Owners Forum May 2008 ESDAL Stakeholder Management Team bringing service to life

ESDAL Project - Outline ESDAL Project Update Data Elements Phases 2, 3 & 4 ICA’s Data Updates

Project Update Phase 1Operational 03/03/06 Phase 2Operational 14/01/08 Phase 3Autumn 08 Phase 4Summer 09 Data Collection 168 LA’s providing data 192 Total data providers Total number of structures collected Expected number of ESDAL structures Total structures transformed Total structures cleansed 74727

Data Elements Essential Data Structure Key - Your unique identifier for the structure Location - A grid reference which may be OSGR format or another co-ordinate pair Notification Contact – details of the person to be notified with regards to abnormal loads for a given structure Category The type of structure - for example Road Bridge, Elevated Road, Culvert, Level Crossing, from a pre-defined list of values.

Data Elements Additional structure information would also be most useful: Structure Name - The name or identifier you use for the structure Alternative Names - Any other names that are used Managing Authority - Contact details for the delegated authority responsible for receiving abnormal load notifications Object Under - The road, railway or other path passing under the bridge Object Over - The road, railway or other path passing over the bridge Structure Length - The overall span of the structure – may be between bearing centrelines, deck joints or abutment faces Width Over - The minimum clear width between parapets

Data Elements Width Under - The minimum clear width between kerbs and abutments where a route passes under the structure Safe Vehicle Height - The maximum permissible height of a vehicle and load able to pass under the lowest part of the structure Gross Weight Limit - The maximum permissible gross weight of vehicle and load able to pass over the structure Axle Weight Limit - Maximum permissible single axle weight of vehicle and load able to pass over the structure Structure Description - Any additional information which might help to clarify the structure’s type or location HB/SV rating Number of spans Details of publically available heights & weights

Data Elements Height Envelope - The maximum permissible envelope through which a load may pass under the structure – for example, where a particular route path under the structure will allow a higher load than the specified height limit. Intellectual property rights for the data remain with the structure owner at all times. Any data collected by the ESDAL team will not be used for anything other than the ESDAL system without prior written permission.

Phases 2, 3 & 4 Phases 2 & 3 –Allows Hauliers to submit applications and to notify all abnormal loads through a website. –Detailed route identification gives clear picture of proposed route to notifiable authorities. Map based review of route and structures List of affected structures Facility to comment on proposed special order route –Standard format for ESDAL notifications and applications –Routine alert of unread notifications by fax or –You can filter notifications to see only notifications that affect a given structure

Phases 2, 3 & 4 Phase 4 –Online editing of own structure data –Constraints & restrictions –“Indicative Capacity Appraisals” –Ability to produce statistical information allowing better management of abnormal loads and structures Bridge Heights Using signed height and weight data for use of third parties to assist in reducing bridge strikes.

ICA’s Indicative Capacity Appraisal –Structure owners notification will indicate whether the proposed load is suitable for individual structures –Hauliers see an indication of whether there is a potential problem with the proposed route –Reduction in unsuitable notifications –Appraisal methods, such as weight screening, influence line, BD86

Data Updates The key to ESDAL is maintaining accurate data Structure Data –We will send an to the data holder asking for data updates every six months from the date of the original provision of data. Contact data –We confirm contact data every three months by sending an to the notification contact asking them to confirm their details

Thank you for your attention For more information, visit