CREAM John Gordon GDB November 2009. CREAM number of sites now – gstat2 says 24. Batch systems supported Experiment Tests Feedback from sites. Evaluation.

Slides:



Advertisements
Similar presentations
CREAM: Update on the ALICE experiences WLCG GDB Meeting Patricia Méndez Lorenzo (IT/GS) CERN, 11th March 2009.
Advertisements

Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.
Scheduling under LCG at RAL UK HEP Sysman, Manchester 11th November 2004 Steve Traylen
Patricia Méndez Lorenzo (IT/GS) ALICE Offline Week (18th March 2009)
John Gordon CCLRC RAL Grid Operations Centre Update Trevor Daniels LCG Grid Deployment Board 10 th November 2003.
A proposal for standardizing the working environment for a LCG/EGEE job David Bouvet - Grid Computing team - CCIN2P3 HEPIX Karlsruhe 13/05/2005.
1 BIG FARMS AND THE GRID Job Submission and Monitoring issues ATF Meeting, 20/06/03 Sergio Andreozzi.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) GridPP35, Liverpool 11 Sep 2015.
The production deployment of IPv6 on WLCG David Kelsey (STFC-RAL) CHEP2015, OIST, Okinawa 16 Apr 2015.
LCG Introduction John Gordon, SFTC GDB December 2 nd 2009.
LCG Plans for Chrsitmas Shutdown John Gordon, STFC-RAL GDB December 10 th, 2008.
Grid job submission using HTCondor Andrew Lahiff.
22 nd September 2003 JIM for CDF 1 JIM and SAMGrid for CDF Mòrag Burgon-Lyon University of Glasgow.
WLCG GDB, CERN, 10th December 2008 Latchezar Betev (ALICE-Offline) and Patricia Méndez Lorenzo (WLCG-IT/GS) 1.
Multi-core jobs at the RAL Tier-1 Andrew Lahiff, Alastair Dewhurst, John Kelly February 25 th 2014.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Angela Poschlad (PPS-FZK), Antonio Retico.
Steve Traylen PPD Rutherford Lab Grid Operations PPD Christmas Lectures Steve Traylen RAL Tier1 Grid Deployment
Multicore Accounting John Gordon, STFC-RAL WLCG MB, July 2015.
Stefano Belforte INFN Trieste 1 Middleware February 14, 2007 Resource Broker, gLite etc. CMS vs. middleware.
LCG Pilot Jobs + glexec John Gordon, STFC-RAL GDB 7 November 2007.
GDB March User-Level, VOMS Groups and Roles Dave Kant CCLRC, e-Science Centre.
Enabling Grids for E-sciencE SGE J. Lopez, A. Simon, E. Freire, G. Borges, K. M. Sephton All Hands Meeting Dublin, Ireland 12 Dec 2007 Batch system support.
LCG Storage Accounting John Gordon CCLRC – RAL LCG Grid Deployment Board September 2006.
CREAM: ALICE Experience WLCG GDB Meeting, CERN 11th November 2009 Stefano Bagnasco (INFN-Torino), Jean-Michel Barbet (Subatech), Latchezar Betev (ALICE),
Experiment Operations: ALICE Report WLCG GDB Meeting, CERN 14th October 2009 Patricia Méndez Lorenzo, IT/GS-EIS.
Monitoring for CCRC08, status and plans Julia Andreeva, CERN , F2F meeting, CERN.
LCG Introduction John Gordon, STFC GDB September 14 th 2011.
LCG Introduction John Gordon, STFC GDB December14 th 2011.
LCG Introduction John Gordon, STFC GDB June 8 th 2011.
LCG Report from GDB John Gordon, STFC-RAL MB meeting February24 th, 2009.
LCG Support for Pilot Jobs John Gordon, STFC GDB December 2 nd 2009.
John Gordon CCLRC RAL Grid Operations LCG Grid Deployment Board FNAL, 9th October 2003.
LCG Pilot Jobs and glexec John Gordon.
WLCG Service Report ~~~ WLCG Management Board, 18 th September
Enabling Grids for E-sciencE Batch System Integration Jan Just Keijser Nikhef Amsterdam EGEE III SA3 Kickoff Meeting, May
LCG User Level Accounting John Gordon CCLRC-RAL LCG Grid Deployment Board October 2006.
CC - IN2P3 Site Report Hepix Fall meeting 2010 – Ithaca (NY) November 1st 2010
LCG Service Challenges SC2 Goals Jamie Shiers, CERN-IT-GD 24 February 2005.
Accounting in LCG/EGEE Can We Gauge Grid Usage via RBs? Dave Kant CCLRC, e-Science Centre.
SL5 Site Status GDB, September 2009 John Gordon. LCG SL5 Site Status ASGC T1 - will be finished before mid September. Actually the OS migration process.
Enabling Grids for E-sciencE INFSO-RI Enabling Grids for E-sciencE Gavin McCance GDB – 6 June 2007 FTS 2.0 deployment and testing.
Next Steps after WLCG workshop Information System Task Force 11 th February
LCG Issues from GDB John Gordon, STFC WLCG MB meeting September 28 th 2010.
HTCondor-CE for USATLAS Bob Ball AGLT2/University of Michigan OSG AHM March, 2015 Bob Ball AGLT2/University of Michigan OSG AHM March, 2015.
LCG Pilot Jobs + glexec John Gordon, STFC-RAL GDB 7 December 2007.
WLCG Operations Coordination report Maria Alandes, Andrea Sciabà IT-SDC On behalf of the WLCG Operations Coordination team GDB 9 th April 2014.
Current status WMS and CREAM CE deployment Patricia Mendez Lorenzo ALICE TF Meeting (CERN, 02/04/09)
Status of gLite-3.0 deployment and uptake Ian Bird CERN IT LCG-LHCC Referees Meeting 29 th January 2007.
Accounting Review Summary from the pre-GDB related to CPU (wallclock) accounting Julia Andreeva CERN-IT GDB 13th April
CERN IT Department CH-1211 Genève 23 Switzerland t CHEP 2009, Monday 26rd March 2009 (Prague) Patricia Méndez Lorenzo on behalf of the IT/GS-EIS.
CREAM CE: upgrades in the system  Migration of the ALICE production queue in the CREAM CE: DONE  From pps-cream-fzk.gridka.de:8443/cream-pbs-pps to.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) HEPIX, BNL 13 Oct 2015.
INFSO-RI Enabling Grids for E-sciencE Padova site report Massimo Sgaravatto On behalf of the JRA1 IT-CZ Padova group.
Accounting Update John Gordon. Outline Multicore CPU Accounting Developments Cloud Accounting Storage Accounting Miscellaneous.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks CREAM: current status and next steps EGEE-JRA1.
Best 20 jobs jobs sites.
The Worldwide LHC Computing Grid WLCG Milestones for 2007 Focus on Q1 / Q2 Collaboration Workshop, January 2007.
LCG Introduction John Gordon, STFC GDB December 7 th 2010.
CREAM Status and plans Massimo Sgaravatto – INFN Padova
Grid Technology CERN IT Department CH-1211 Geneva 23 Switzerland t DBCF GT Middleware Update GDB, 9 th February 2011 Slides by Maria Alandes.
Status of the SL5 migration ALICE TF Meeting
HTCondor Accounting Update
HTCondor Accounting Update
Communication, Communication, Communication
Andreas Unterkircher CERN Grid Deployment
CREAM Status and Plans Massimo Sgaravatto – INFN Padova
The CREAM CE: When can the LCG-CE be replaced?
John Gordon, STFC-RAL GDB April 8th 2009
Summary from last MB “The MB agreed that a detailed deployment plan and a realistic time scale are required for deploying glexec with setuid mode at WLCG.
John Gordon, STFC GDB October 12th 2011
Presentation transcript:

CREAM John Gordon GDB November 2009

CREAM number of sites now – gstat2 says 24. Batch systems supported Experiment Tests Feedback from sites. Evaluation Criteria

Batch System Support Torque – Yes LSF – Yes? SGE - ? BQS – testing Condor – testing Others?

Feedback from Sites PIC - No problems running CREAM in parallel to lcg-CE. We already have a CREAM CE in production since a while. Ideally, we would like to keep the total number of "CE servers" constant (remove an lcg-CE when we deploy a new CREAM CE) but seems this will be difficult with ATLAS asking for lcg-CEs for one more year. Swiss T2 – not yet done but see no problem. KIT - already run several LCG-CEs and CREAM-CEs in parallel and will do so as long this is required by experiments. RAL – running CREAM now. UK – Tier2s Already running 2, more in deployment and others planned. CC-IN2P3 - CREAM: we plan to introduce a BQS-backed CREAM CE (hopefully next week) for testing by ALICE. Some initial tests have been performed with this CE without publishing it in the information system but now we need to perform tests of the whole job submission chain, including the experiment-specific part. Regarding the possibility of running in parallel CREAM and the LCG CEs, we would like to shorten as much as possible the period during which we should maintain both a set of LCG CEs and one set of CREAM CEs, once the CREAM CE is certified by the experiments. We would progressively decommission the LCG CEs once the CREAM is certified by the LHC experiments.